Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Modernization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,054 records · Page 59

Adaptive beamlet-based finite-size pencil beam dose calculation for independent verification of IMRT and VMAT

Purpose: The use of sophisticated dose calculation procedure in modern radiation therapy treatment planning is inevitable in order to account for complex treatment fields created by multileaf collimators (MLCs). As a consequence, independent volumetric dose verification is time consuming, which affects the efficiency of clinical workflow. In this study, the authors present an efficient adaptive beamlet-based finite-size pencil beam (AB-FSPB) dose calculation algorithm that minimizes the computational procedure while preserving the accuracy. Methods: The computational time of finite-size pencil beam (FSPB) algorithm is proportional to the number of infinitesimal and identical beamlets that constitute an arbitrary field shape. In AB-FSPB, dose distribution from each beamlet is mathematically modeled such that the sizes of beamlets to represent an arbitrary field shape no longer need to be infinitesimal nor identical. As a result, it is possible to represent an arbitrary field shape with combinations of different sized and minimal number of beamlets. In addition, the authors included the model parameters to consider MLC for its rounded edge and transmission. Results: Root mean square error (RMSE) between treatment planning system and conventional FSPB on a 10 × 10 cm{sup 2} square field using 10 × 10, 2.5 × 2.5, and 0.5 × 0.5 cm{sup 2} beamlet sizes were 4.90%, 3.19%, and 2.87%, respectively, compared with RMSE of 1.10%, 1.11%, and 1.14% for AB-FSPB. This finding holds true for a larger square field size of 25 × 25 cm{sup 2}, where RMSE for 25 × 25, 2.5 × 2.5, and 0.5 × 0.5 cm{sup 2} beamlet sizes were 5.41%, 4.76%, and 3.54% in FSPB, respectively, compared with RMSE of 0.86%, 0.83%, and 0.88% for AB-FSPB. It was found that AB-FSPB could successfully account for the MLC transmissions without major discrepancy. The algorithm was also graphical processing unit (GPU) compatible to maximize its computational speed. For an intensity modulated radiation therapy (∼12 segments) and a volumetric modulated arc therapy fields (∼90 control points) with a 3D grid size of 2.0 × 2.0 × 2.0 mm{sup 3}, dose was computed within 3–5 and 10–15 s timeframe, respectively. Conclusions: The authors have developed an efficient adaptive beamlet-based pencil beam dose calculation algorithm. The fast computation nature along with GPU compatibility has shown better performance than conventional FSPB. This enables the implementation of AB-FSPB in the clinical environment for independent volumetric dose verification.

60 APPLIED LIFE SCIENCES↗

Demonstration Report: Handheld UXO Discriminator, SERDP No. MR-1667

In 2003, the Defense Science Board observed: 'The problem is that instruments that can detect the buried UXOs also detect numerous scrap metal objects and other artifacts, which leads to an enormous amount of expensive digging. Typically 100 holes may be dug before a real UXO is unearthed! The Task Force assessment is that much of this wasteful digging can be eliminated by the use of more advanced technology instruments that exploit modern digital processing and advanced multi-mode sensors to achieve an improved level of discrimination of scrap from UXOs.' In keeping with these remarks and with prior funding (UX-1225, MM-0437, and MM-0838), the LBNL group has successfully designed and built the cart-mounted Berkeley UXO Discriminator (BUD) and demonstrated its performance at various test sites (cf. Gasperikova et al., 2007, 2008, and 2009). Because hand-held systems have the advantage of being lightweight, compact, portable, and deployable under most site conditions, they are particularly useful in areas of dense vegetation or challenging terrain. In heavily wooded areas or areas with steep or uneven terrain, hand-held sensors may be the only suitable device for UXO detection and discrimination because it can be carried through spaces that the operator could walk through or at least approach. Furthermore, it is desirable to find and characterize a metallic object without the need to accurately locate the sensors at multiple positions around the target. The ideal system would thus locate and characterize the target from a single position of the sensor and indicate to the operator where to flag the target for subsequent study. Based on these considerations, we designed and built a sensor package in a shape of a 14-in (0.35 m) cube. This hand-held prototype incorporates the key features of the cart-mounted system - (a) three orthogonal transmitters and ten pairs of receivers, and (b) difference or gradient measurements that significantly reduce the ambient and motion noise, and greatly enhance the sensitivity to the gradients of the target. The system characterizes the target from a single position. Results from a local test site were in a good agreement with theoretical performance calculations of such a device. This survey was designed to demonstrate performance of the system under realistic survey conditions at the Aberdeen Proving Ground (APG) in Aberdeen, MD. The survey was preformed in an area with known items ('Calibration Grid'), and in a seeded blind test area (the 'Blind Test Grid'). The ground truth for the surveys conducted on the Blind Test Grid was withheld from the testers. Only the graded test scores based on target detection and target classification were provided. For more information, see http://aec.army.mil/usaec/technology/uxo01c03.html.

54 ENVIRONMENTAL SCIENCES↗

VOLTTRON™: Tech-to-Market Best-Practices Guide for Small- and Medium-Sized Commercial Buildings

VOLTTRON™ is an open-source distributed control and sensing platform developed by Pacific Northwest National Laboratory for the U.S. Department of Energy. It was developed to be used by the Office of Energy Efficiency and Renewable Energy to support transactive controls research and deployment activities. VOLTTRON is designed to be an overarching integration platform that could be used to bring together vendors, users, and developers and enable rapid application development and testing. The platform is designed to support modern control strategies, including the use of agent- and transaction-based controls. It also is designed to support the management of a wide range of applications, including heating, ventilation, and air-conditioning systems; electric vehicles; and distributed-energy and whole-building loads. This report was completed as part of the Building Technologies Office’s Technology-to-Market Initiative for VOLTTRON’s Market Validation and Business Case Development efforts. The report provides technology-to-market guidance and best practices related to VOLTTRON platform deployments and commercialization activities for use by entities serving small- and medium-sized commercial buildings. The report characterizes the platform ecosystem within the small- and medium-sized commercial building market and articulates the value proposition of VOLTTRON for three core participants in this ecosystem: 1) platform owners/adopters, 2) app developers, and 3) end-users. The report also identifies key market drivers and opportunities for open platform deployments in the small- and medium-sized commercial building market. Possible pathways to the market are described—laboratory testing to market adoption to commercialization. We also identify and address various technical and market barriers that could hinder deployment of VOLTTRON. Finally, we provide “best practice” tech-to-market guidance for building energy-related deployment efforts serving small- and medium-sized commercial buildings.

97 MATHEMATICS AND COMPUTING↗

ZIPPER: Zonal isolation with plug and perf in enhanced reservoirs (Final Technical Report)

Modern multistage hydraulic stimulation treatments in cased wellbores require an effective method of isolating stages between treatments. A commonly used method in the oil and gas industry, plug and perf, is not currently viable for Enhanced Geothermal Systems (EGS) due to limitations of a critical component of the system – the ball drop (flow through) frac plug. Commercially available ball drop frac plugs do not meet the temperature or wellbore diameter requirements needed for use in EGS stimulations. For example, one particular drillable bridge and frac plug line from a large tool developer is only rated to 175 °C, while another is only available up to casing sizes of 5 ½” and rated up to 204 °C. We developed, prototyped, and field tested an upgraded ball drop frac plug to meet the requirements of EGS stimulations, including high-temperature (225+ °C), differential pressure (6000+ psi), and wellbore diameters ranging from 6 5/8” to 10 5/8”. We focused on designs and materials to optimize drillability, a key cost driver in plug and perf systems. The primary objective was to upgrade a drillable frac plug (currently rated to a temperature of 175°C and a pressure of 10,000 psi in 7” casing) to withstand temperatures of 225+°C. The upgraded frac plug was tested in the laboratory as well as in a field trial at a geothermal field. Engineering design and fabrication of the new plug was completed in 2019. Lab testing, validation, and qualification of the plug was completed in 2020. Ultimately the plug was successfully run during a multistage stimulation treatment in a fully horizontal EGS well in 2022. Prior to this project, a ball-drop, flow-through stimulation plug had never been used in a geothermal well. At the conclusion of this project, three different types of zonal isolation plugs were evaluated under full-scale operating conditions across 16 stimulation treatment stages in a first-of-a-kind EGS project called Project Red. This trial included the newly designed high-temperature, large-diameter plug. The plugs met all of 5 the technical requirements for commercial viability. Project Red has since been fully commissioned and is generating electricity on the Nevada grid - the first EGS project to successfully deliver power to the grid in the US.

15 GEOTHERMAL ENERGY↗

Planning of distributed data production for High Energy and Nuclear Physics

Modern experiments in High Energy and Nuclear Physics heavily rely on distributed computations using multiple computational facilities across the world. One of the essential types of the computations is a distributed data production where petabytes of raw files from a single source has to be processed once (per production campaign) using thousands of CPUs at distant locations and the output has to be transferred back to that source. The data distribution over a large system does not necessary match the distribution of storage, network and CPU capacity. Therefore, bottlenecks may appear and lead to increased latency and degraded performance. In this paper we propose a new scheduling approach for distributed data production which is based on the network flow maximization model. In our approach a central planner defines how much input and output data should be transferred over each network link in order to maximize the computational throughput. Such plans are created periodically for a fixed planning time interval using up-to-date information on network, storage and CPU resources. The centrally created plans are executed in a distributed manner by dedicated services running at participating sites. In conclusion, our simulations based on the log records from the data production framework of the experiment STAR (Solenoid Tracker at RHIC) have shown that the proposed model systematically provides a better performance compared to the simulated traditional techniques.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Securing Grid-interactive Efficient Buildings (GEB) through Cyber Defense and Resilient System (CYDRES)

The DOE CYDRES project is driven by the urgent need to address critical research gaps in the domain of cyber-physical security of smart buildings, including Grid-interactive Efficient Buildings (GEBs). CYDRES, a real-time advanced building resilient platform, aims to enhance the cyber-attack-immune capabilities of buildings through multi-layered prevention, detection, and adaptation mechanisms. CYDRES consists of five key modules: a multi-layer network analyzer, an Automatic Fault Detection, Diagnosis, and Prognosis (AFDDP) framework, an intelligent mode selector, a cyber-resilient control framework, and a situation awareness platform. The Network Analyzer employs a data-driven framework that includes a protocol state learning tool and a CRF (Conditional Random Field) command validator. In Hardware-In-the-Loop (HIL) testbeds, it achieved 100% detection accuracy with a false alarm rate of 3%, validating its efficacy in identifying selected cyber-attacks. The AFDDP framework leverages pattern matching, PCA (Principal Component Analysis)-based strategies, and a DBN (Dynamic Bayesian Network)-based fault diagnosis approach to pinpoint the causes of physical system abnormalities using Building Automation System (BAS) data. In HIL experiments, the AFDDP module attained a detection accuracy of over 95% with a false alarm rate below 7%. Additionally, the fault detector utilized machine learning (Random Forest) and deep learning (Multi-Layer Perceptron) methods with acoustic sensor data to achieve a 100% fault detection accuracy in Heating, Ventilation, and Air-Conditioning (HVAC) equipment. The Mode Selector offered real-time impact analysis, allowing immediate actions to protect BASs in the face of emerging threats. The cyber-resilient control framework included an adaptive Model Predictive Control (MPC) and a measurement compensator, reducing temperature violations by up to 94% and improving the total demand flexibility by up to 70% in HIL experiments. Such HIL experiments covered a cyber-attack case and a physical fault case, showcasing CYDRES’ efficiency in maintaining operational continuity during threats. The situation awareness platform in Grafana enhanced real-time threat detection and response visualization, augmenting the operational awareness for building operators. CYDRES demonstrated high technical effectiveness in various test scenarios, particularly in HIL environments. The project's phased development approach ensured efficient use of resources, highlighting its practical feasibility and readiness for commercialization. By enhancing the security and resilience of building operations, CYDRES represents a significant advance in mitigating risks associated with cyber-physical systems, thereby enhancing public confidence in the safety of modern building infrastructure. Future directions for the project include expanding testing protocols, refining AFDDP methodologies, exploring more comprehensive resilient control strategies, and testing in real commercial buildings.

42 ENGINEERING↗

The SURE House (Solar Decathlon 2015)

Coastal towns and cities across the Northeastern US, with their high population density, aged utility infrastructure, and unique geography, are increasingly vulnerable to climate change related storm events. In October 2012 superstorm Sandy highlighted the fragility of our current coastal building types and made clear the need for a new model of design and construction which works to understand and mitigate these weaknesses. Dramatic changes in public policy, championed by both The Federal Emergency Management Agency (FEMA) and the National Flood Insurance Program (NFIP) are driving the rebuilding of these shore communities, often resulting in costly renovations, un-sustainable neighborhood configurations and in direct conflict with concurrent government policies such as The American with Disabilities Act (ADA). The SURE HOUSE demonstrates a series of new design solutions to these conflicting public policies and environmental imperatives. At Stevens Institute of Technology, the 2015 Solar Decathlon started with the challenge: Can we design a home for coastal New Jersey that dramatically reduces its energy use while protecting itself from the realities of a changing, more extreme climate? The SURE HOUSE merges the iconic 20th century shore home with 21st century building science. Utilizing innovative renewable energy technologies, a ‘Passive House’ level building envelope, and rugged glass-fiber-composite materials to flood-proof the home, the SURE HOUSE is a high-performance, net-zero-energy home, armored against extreme weather, designed for the contemporary lifestyle of the Jersey Shore and other vulnerable coastal communities. SUSTAINABLE At Stevens, we recognize that energy use in the home and workplace is directly connected to the growing problem of climate change. Reducing our energy consumption by designing higher performing, compact homes that are both functional, comfortable and desirable is the first critical step towards a modern, sustainable architecture for New Jersey and beyond. This is what informed the architectural design of the house. Configured about a compact form, thickly insulated and air-sealed walls eliminate thermal bridging and minimize energy losses while advanced glazing brings in free solar heat during the winter months. As a result of these passive design strategies, the SURE HOUSE has a greatly reduced carbon footprint requiring 91% less energy than a typical New Jersey home. Photovoltaic (PV) arrays on both the rooftop and operable shutters easily provide energy in excess of the home’s modest demands. The Stevens team considers a truly sustainable home in the era of climate change, one that prioritizes low energy use, and integrates right-sized renewable generation to supply the home’s needs. Low consumption, low production. RESILIENT In October of 2012, Hurricane Sandy wreaked havoc along the east coast of the US. In New Jersey alone there was an estimated 29.4 billion dollars in damages, 346,000 homes affected, and almost two and a half million people left without power, in some cases for over 10 days. Recovery from this storm and associated flooding is ongoing to this day, as many New Jersey homeowners grapple with the large costs of rebuilding and struggle to adapt to complicated new home building regulations. Damage from this storm to Hoboken, the home of the Stevens Institute of Technology’s campus, and to the New Jersey shore was extensive and many students on the SURE HOUSE team were directly affected by this historic event. The Stevens design team recognizes that in a world of more frequent and stronger storms, the ability to absorb and adapt to change is more important than ever. Successfully weathering the next storm and its aftermath is one of the primary goals in the design of the SURE HOUSE prototype. The SURE HOUSE introduces unique ‘dry flood-proofing’ methods to residential construction. Innovative wall and floor flood-proofing, utilizing durable composite sheathing materials adapted from the boating industry, were developed by the student team to render the SURE House’s building envelope flood proof up to the FEMA AE 6/7 Zone (+ 6/7 feet of water above sea-level). Designed and fabricated utilizing glass-fiber composite materials, the custom storm shutter system serves to protect the large glazed openings of the home from both air-borne debris impact and water infiltration during a storm event while also providing deterrence from the vandalism that often occurs in the aftermath of a calamitous event. During extended power outages, a ‘resilient’ solar array is capable of supplying critical amounts of energy and hot water to the home, without the use of battery storage or grid infrastructure. PV Description AC GRID-TIED PV SYSTEM The SURE HOUSE solar system consists of two distinct arrays, the grid-tied rooftop array which produces AC Powerand the shutter-mounted array which converts DC power generated by the modules directly into usable heat for the domestic hot water (DHW). The roof-mounted AC grid-tied array is comprised of three strings, two 11 module strings connected to an SMA SB 5000TL-US-223 inverter and a single 10 module string equipped and an SMA SB 3000TL-US-22 central inverter. All modules for the rooftop AC array are LG MonoX 2804 watt solar panels, chosen for their durability and efficiency. Inverter sizing and string size are optimized to the electrical characteristics of the chosen PV modules and the desired energy production, see Appendix 5B. The SURE HOUSE is projected to produce 12,353 kWh per year to meet 6,157 kWh per year of estimated consumption. Solar modules for the two AC grid-tied sub arrays are mounted on the main roof surface of the SURE HOUSE with a 10 degree tilt angle using a partially-ballasted polyethylene roof mounting system made by Renusol, which is particularly suited to the corrosive salt air of a coastal environment. This method was chosen for its installation simplicity and to limit detrimental roof penetrations. The 10 degree tilt optimizes the energy generated per roof area at a lower price, see Appendix 5A, and ensures that there is minimal wind uplift. DC SOLAR ELECTRIC DOMESTIC HOT WATER The SURE HOUSE’s approach to sustainable and resilient domestic hot water (DHW) consists of a unique, custom engineered DC solar electric hot water system. Employing the use of Advanced Energy’s DC electric PV heater (DCPVH)5 to heat domestic water well beyond the draw temperature, the SURE HOUSE is able to obtain a remarkably high solar fraction of 75% or more. The custom modified 80 gallon Vaughn DHW tank acts as a large solar ‘battery’ that stores heat energy in the form of hot water at almost 150 degrees, harvesting energy when the sun is out for use later in the day or overnight. The system, which uses electricity rather than heated fluid, is distinct from traditional ‘solar thermal’ systems by eliminating the dangers and associated maintenance issues of fluid based systems. By forgoing the use of external fluid loops, overheated solar collectors and pipes are not an issue for the SURE HOUSE system which never needs any yearly or seasonal flushing. In weather conditions where the integrated DCPVH unit cannot produce enough hot water via solar energy alone, the Vaughn hot water tank comes factory made with an AC powered 2.6 COP heat pump and a AC heating coil that serve as back-up heating elements. The DCPVH is powered by a DC array consisting of 10 custom-made Solbian by PVilion 180 watt, monocrystalline, flexible solar modules6. The Solbian modules are directly mounted to the top half of the operable storm shutters on the south façade of the SURE HOUSE. The SURE HOUSE team worked closely with PVillion, a PV system designer specializing in flexible architectural photovoltaics, to design an adhesive system that works with the glass-fiber storm shutter surface in a reliable manner over an extended period. Because this system operates in DC-only mode and never connects to the municipal power grid, the system can continue to create hot water safely and effectively even during grid disruption events. This hot water, and the energy stored within it, could be used for a range of activities including washing and cooking to more elaborate hydronic heating systems as desired. See Appendix 6 for system engineering, sizing and modeling.

14 SOLAR ENERGY↗

Power Sector Transformation Pathways: Exploring Objectives, Factors, and Technology Innovations to Inform Power Sector Pathway Decisions

The power and heating sectors are responsible for around 30% of global CO2 emissions and this share is likely to grow as countries move towards electrification of the transportation and building sectors. Therefore, enabling forward-thinking, long term strategies in the power sector is a crucial area for international collaboration and support. The rapid transition of power systems toward modern, low-carbon pathways and technologies will be necessary to meet key climate goals while also enabling other critical objectives such as economic development, energy access, and energy system resiliency, among others. Many developed and developing countries are well-poised to champion power sector transformation (PST), however, further support is needed to identify pathways and implement critical near and long-term actions. To address this need, the Low Emission Development Strategies Global Partnership (LEDS GP) together with an expert team including Agora Energiewende, Energy Innovation, European Climate Foundation, Fraunhofer Institute for Systems and Innovation Research , Prayas Energy Group and LEDS Latin America and Caribbean Platform, developed a framework identifying four key pathways that can be integrated and combined to support low-carbon PST. These four pathways are: (1) Distributed Energy Resource Revolution, (2) Bulk Power Transformation, (3) Transmission and Distribution Interactivity, and (4) Distributed Transactional Future. To support exploration of pathways, this study examines PST objectives and factors that may lead countries or jurisdictions to place a greater relative emphasis on certain pathways as well as a framework and complementary tool for considering the emphasis in a hands on manner. The report provides case studies on application of the approach to bring life to the topic. The case studies include Haiti, Kenya, Mexico, Southeast Asia, and the European Union, among others. The report also presents actions to-be-taken in the near-, medium- and long-term to support the realization of pathways and long-term transformation of the power sector. The report, together with a complementary spreadsheet tool developed under the effort, can be used to enable stakeholder engagement and visioning for the power sector over the long-term, taking into account key factors and potential innovations. It can also be used to understand and inform relevant analysis tools and models based on which pathways are emphasized, and to identify key actions in the near- and medium-term to avoid lock-in of carbon-intensive technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Potosi Reservoir Model 2013c, Property Modeling Update

As part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well #1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. The intention was for 2.2 million tons per annum (2 million tonnes per annum [MTPA]) of CO2 to be injected for 20 years. In the Task Error! Reference source not found., the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010") was re-run using a new injection scenario of 3.5 million tons per annum (3.2 MTPA) for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. The models size was insufficient to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 by 30 mi (48 by 48 km), while preserving all property modeling workflows and layering. This model was retained as the base case. In the preceding Task [1], the Potosi reservoir model was updated to take into account the new data from the Verification Well #2 (VW2) which was drilled in 2012. The porosity and permeability modeling was revised to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This dynamic model was named Potosi Dynamic Model 2013b. In this Task, a new property modeling workflow was applied, where seismic inversion data guided the porosity mapping and geobody extraction. The static reservoir model was fully guided by PorosityCube interpretations and derivations coupled with petrophysical logs from three wells. The two main assumptions are: porosity features in the PorosityCube that correlate with lost circulation zones represent vugular zones, and that these vugular zones are laterally continuous. Extrapolation was done carefully to populate the vugular facies and their corresponding properties outside the seismic footprint up to the boundary of the 30 by 30 mi (48 by 48 km) model. Dynamic simulations were also run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This new dynamic model was named Potosi Dynamic Model 2013c. Reservoir simulation with the latest model gives a cumulative injection of 43 million tons (39 MT) in 30 years with a single well, which corresponds to 40% of the injection target. The injection rate is approx. 3.2 MTPA in the first six months as the well is injecting into the surrounding vugs, and declines rapidly to 1.8 million tons per annum (1.6 MTPA) in year 3 once the surrounding vugs are full and the CO2 start to reach the matrix. After, the injection rate declines gradually to 1.2 million tons per annum (1.1 MTPA) in year 18 and stays constant. This implies that a minimum of three (3) wells could be required in the Potosi to reach the injection target. The injectivity evaluated in this Task was higher compared to the preceding Task, since the current facies modeling (guided by the porosity map from the seismic inversion) indicated a higher density of vugs within the vugular zones. 5 As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. After 30 years of injection, the plume extends 13.7 mi (22 km) in E-W and 9.7 mi (16 km) in N-S directions. After injection finishes, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 60 years post-injection, the plume extends 14.2 mi (22.8 km) in E-W and 10 mi (16 km) in N-S directions, and remains constant as the remaining pressure gradient has become very low. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger plume extent could be expected. The increase of reservoir pressure at the end of injection is approximately 1,200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 10 psia (69 kPa) beyond 14 mi (23 km) away from injector. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger areal pressure increase could be expected. The reservoir pressure declines rapidly during the first 30 years post injection and the initial reservoir pressure is nearly restored after 100 years post-injection. The present evaluation is mainly associated with uncertainty on the vugs permeability and interconnectivity. The use of porosity mapping from seismic inversion might have reduced the uncertainty on the lateral vugs body distributions. However, major uncertainties on the Potosi vugs permeability remains. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells and appropriate spacing to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

The Potosi Reservoir Model 2013

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the VW1 and the CCS1 wells, structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. Intention was for two million tons per annum (MTPA) of CO2 to be injected for 20 years. In the preceding, the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010" in this topical report) was re-run using a new injection scenario; 3.2 MTPA for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. It was not sufficiently large enough to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 miles x 30 miles (48.3km x48.3km), while preserving all property modeling workflows and layering. This model was retained as the base case of Potosi Dynamic Model 2013a. The Potosi reservoir model was updated to take into account the new data from the verification well VW2 which was drilled in 2012. The new porosity and permeability modeling was performed to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.2 MTPA for 30 years. This new dynamic model was named Potosi Dynamic Model 2013b. Due to the major uncertainties on the vugs permeability, two models were built; the Pessimistic and Optimistic Cases. The Optimistic Case assumes vugs permeability of 9,000 mD, which is analog to the vugs permeability identified in the pressure fall off test of a waste water injector in the Tuscola site, approx. 40 miles (64.4km) away from the IBDP area. The Pessimistic Case assumes that the vugs permeability is equal to the log data, which does not take into account the permeability from secondary porosity. The probability of such case is deemed low and could be treated as the worst case scenario, since the contribution of secondary porosity to the permeability is neglected and the loss circulation events might correspond to a much higher permeability. It is considered important, however, to identify the range of possible reservoir performance since there are no rigorous data available for the vugs permeability. The Optimistic Case gives an average CO2 injection rate of 0.8 MTPA and cumulative injection of 26 MT in 30 years, which corresponds to 27% of the injection target. The injection rate is approx. 3.2 MTPA in the first year as the well is injecting into the surrounding vugs, and declines rapidly to 0.8 MTPA in year 4 once the surrounding vugs are full and the CO2 start to reach the matrix. This implies that according to this preliminary model, a minimum of four (4) wells could be required to achieve the injection target. This result is lower than the injectivity estimated in the Potosi Dynamic Model 2013a (43 MT in 30 years), since the permeability model applied in the Potosi Dynamic Model 2013b is more conservative. This revision was deemed necessary to treat the uncertainty in a more appropriate manner. As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. For the Optimistic Case, the plume extends 17 miles (27.4km) in E-W and 14 miles (22.5km) in N-S directions after 30 years. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post injection, the plume extends 20 miles (32.2km) in E-W and 15.5 miles (24.9km) in N-S directions. Should the targeted cumulative injection of 96 MT be achieved; a much larger plume extent could be expected. For the Optimistic Case, the increase of reservoir pressure at the end of injection is approximately 1200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia (206.8 kPa) beyond 14 miles (22.5km) away from injector. Should the targeted cumulative injection of 96 MT be achieved; a much larger areal pressure increase could be expected. The initial reservoir pressure is nearly restored after approximately 100 years post injection. The presence of matrix slows down the pressure dissipations. The Pessimistic Case gives an average CO2 injection rate of 0.2 MTPA and cumulative injection of 7 MT in 30 years, which corresponds to 7% of the injection target. This implies that in the worst case scenario, a minimum of sixteen (16) wells could be required to achieve the injection target. The present evaluation is mainly associated with uncertainty on the vugs permeability, distribution, and interconnectivity. The different results indicated by the Optimistic and Pessimistic Cases signify the importance of vugs permeability characterization. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗