Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

54 ENVIRONMENTAL SCIENCES↗

A Multi-State Model for Catalyzing the National Home Energy Retrofit Market (Final Technical Report)

In the fall of 2010, the Alabama Department of Economic and Community Affairs (ADECA) launched the Multi-State Model for Catalyzing the National Home Energy Retrofit Market Project (Multi-State Project). This residential energy efficiency pilot program was a collaborative effort among the states of Alabama, Massachusetts, Virginia, and Washington, and was funded by competitive State Energy Program (SEP) awards through the U.S. Department of Energy (DOE). The objective of this project was to catalyze the home energy efficiency retrofit market in select areas within the state of Alabama. To achieve this goal, the project addressed a variety of marketplace elements that did not exist, or were underdeveloped, at the outset of the effort. These included establishing minimum standards and credentials for marketplace suppliers, educating and engaging homeowners on the benefits of energy efficiency and addressing real or perceived financial barriers to investments in whole-home energy efficiency, among others. The anticipated effect of the activities would be increased market demand for retrofits, improved audit to retrofit conversion rates and growth in overall community understanding of energy efficiency. The four-state collaborative was created with the intent of accelerating market transformation by allowing each state to learn from their peers, each of whom possessed different starting points, resources, and strategies for achieving the overall objective. The four partner states engaged the National Association of State Energy Officials (NASEO) to oversee a project steering committee and to manage the project evaluation for all four states. The steering committee, comprised of key program partners, met on a regular basis to provide overall project coordination, guidance, and progress assessment. While there were variances in program design among the states, there were several common elements: use of the Energy Performance Score (EPS) platform; an audit and home energy rating tool; emphasis on community based coordination and partnerships; marketing and outreach to increase homeowner participation; training for market actors; access to financing options including rebates, incentives, and loan products; and an in depth process evaluation to support continual program improvement and analysis. In Alabama, Nexus Energy Center operated energy efficiency retrofit programs in Huntsville and Birmingham. In the Huntsville community the AlabamaWISE program was available in five Alabama counties: Cullman, Lawrence, Limestone, Madison, and Morgan. In Birmingham, the program was available to residents in Jefferson and Shelby Counties. In both communities, the program was similar in terms of program design but tailored marketing and partnerships to address the unique local conditions and population of each community. ADECA and the Southeast Energy Efficiency Alliance (SEEA) provided overall project management services and common resources to the local program administrator Nexus Energy Center, including contracted services for contractor training, quality assurance testing, data collection and reporting, and compliance. The fundamental components of the AlabamaWISE program included a vertical contractor-based business model; comprehensive energy assessments; third-party quality assurance; rebates for installation of energy saving measures; accessible, low-interest financing; targeted and inbound marketing; Energy Performance Score (EPS) tool to engage and educate homeowners; training for auditors, contractors, and real estate professionals; and online resources for education and program enrollment. Program participants were eligible to receive rebates or financing toward the assessments and upgrades to their home provided they reached at least 20 percent deemed or modeled energy savings. The design of each program focused on addressing several known barriers including: limited homeowner knowledge on the benefits of energy efficiency, lack of financing options, lack of community support for energy efficiency programs, and lack of trained market actors including contractors and real estate professionals. The programs were able to make progress on addressing all of these barriers and were most successful in offering financing options and training market actors. The most challenging barriers proved to be the act of building a market for energy efficiency where none previously existed, convincing homeowners of the value in investing in energy efficiency (and therefore completing retrofits), engaging electric and natural gas utilities to partner on delivery, and achieving the overall project target of 1,365 completed retrofits. The components that proved to be the most valuable to program success were engaged contractor networks that could promote and endorse the program, partnerships with local business and organizations, and the access to rebates, incentives and financing mechanisms. The programs were successful in building relationships with a variety of community participants including: local contractors, Associations of REALTORS, home builders associations, universities, utilities, local and state governments, and other non-profit organizations. Throughout this program, 933 building audits and 795 building retrofits were completed making homes in Alabama more comfortable, less expensive to operate, more valuable to the marketplace, and safer and healthier for families. Continuing on this momentum, Nexus Energy Center plans to continue operating and expanding operations in Alabama as a Home Performance with ENERGY STAR sponsor and will continue to provide energy services and education to communities in Alabama.

Grimes, Elizabeth M.↗

Trace Metals in Groundwater and Vadose Zone Calcite: In Situ Containment and Stabilization of Stronthium-90 and Other Divalent Metals and Radionuclides at Arid Western DOE Sites: Final Report for Award Number DE-FG07-02ER63486 to the University of Idaho (RW Smith) Environmental Management Science Program Project Number 87016

Radionuclide and metal contaminants are present in the vadose zone and groundwater throughout the U.S. Department of Energy (DOE) energy research and weapons complex. In situ containment and stabilization of these contaminants represents a cost-effective treatment strategy that minimizes workers’ exposure to hazardous substances, does not require removal or transport of contaminants, and generally does not generate a secondary waste stream. We have investigated an in situ bioremediation approach that immobilizes radionuclides or contaminant metals (e.g., strontium-90) by their microbially facilitated co-precipitation with calcium carbonate in groundwater and vadose zone systems. Calcite, a common mineral in many aquifers and vadose zones in the arid west, can incorporate divalent metals such as strontium, cadmium, lead, and cobalt into its crystal structure by the formation of a solid solution. Collaborative research undertaken by the Idaho National Laboratory (INL), University of Idaho, and University of Toronto as part of this Environmental Management Science Program project has focused on in situ microbially-catalyzed urea hydrolysis, which results in an increase in pH, carbonate alkalinity, ammonium, calcite precipitation, and co-precipitation of divalent cations. In calcite-saturated aquifers, microbially facilitated co-precipitation with calcium carbonate represents a potential long-term contaminant sequestration mechanism. Key results of the project include: **Demonstrating the linkage between urea hydrolysis and calcite precipitation in field and laboratory experiments **Observing strontium incorporation into calcite precipitate by urea hydrolyzers with higher distribution coefficient than in abiotic **Developing and applying molecular methods for characterizing microbial urease activity in groundwater including a quantitative PCR method for enumerating ureolytic bacteria **Applying the suite of developed molecular methods to assess the feasibility of the proposed bioremediation technique at a contaminated site located within the 100-N area of the Hanford, Washington site **Assessing the role of nitrification on the persistence of precipitated calcite by modifying primers for identification of the amoA gene region of various ammonia oxidizing bacteria (AOB) for characterizing AOB in the field

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Development of a Small-Scale Project Model for Waste Management at the Port Hope Conversion Facility - 19126

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. Over time, Cameco's ongoing operations contributed to an increase in the volume of low-level radioactive waste managed onsite. Since 2011, Cameco has completed annual waste management campaigns with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations. With disposal options for low-level radioactively contaminated wastes in Canada limited due to cost considerations and no commercially accessible landfills licensed for radioactive material. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill owned by US Ecology in Idaho. Numerous successful campaigns totaling over 1,000 successful shipments, have been completed to transport drummed and/or bagged material by rail in gondola cars to the disposal facility in Idaho since 2011. All shipments have been completed in compliance with all environmental regulations, with a perfect compliance record maintained to date. To achieve this excellent compliance record, the campaigns require careful planning by both organizations, as well as deployment of personnel from the Idaho facility during the campaign for project management, characterization and/or radiation monitoring support. As the accumulated waste inventory has been reduced through these projects, the scope and duration of each campaign has also decreased. In the last few years, road transport directly to the Idaho facility has also been utilized. This option allows for the deployment of small projects that may be completed for a smaller inventory of a specific waste type and to manage newly-generated low-level radioactive wastes on an ongoing basis. These projects have ranged from a single standard van shipment to multiple trucks running continuous loops between the Ontario and Idaho or Ontario and an intermediary site and have been utilized for marginally contaminated wastes (<500 ppm uranium) as well as marginally contaminated wastes with additional hazard classification. Cameco and US Ecology personnel have collaborated to develop characterization and shipment procedures that enable these projects to be executed in full compliance with all Canadian and US regulations, without deployment of personnel from the Idaho facility, while maintaining adequate oversight by both organizations to ensure that the waste is safely and compliantly managed. These protocols have been implemented and optimized for the Port Hope Conversion Facility and will be rolled out to other Cameco facilities in Ontario through 2019. Cameco expects to utilize the small project model for the long term to ensure that eligible marginally contaminated wastes (<500 ppm uranium) are managed appropriately to ensure that once the legacy material is eliminated, it remains so. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling the impact of measured and projected climate and management systems on agricultural fields: Surface runoff, soil moisture, and soil erosion

Abstract As global climate change poses a challenge to crop production, it is imperative to prioritize effective adaptation of agricultural systems based on a scientific understanding of likely impacts. In this study, we applied an integrated watershed modeling framework to examine the impacts of projected climate on runoff, soil moisture, and soil erosion under different management systems in Central Oklahoma. The proposed model uses measured climate data and three downscaled ensembles from the Coupled Model Intercomparison Project Phase 6 (CMIP6) at the water resources and erosion watershed to understand the impact of climate change and various climate conditions under three management systems: (1) continuous winter wheat (Triticum aestivum) under conventional tillage (WW‐CT; baseline system), (2) continuous winter wheat under no‐till (WW‐NT), and (3) cool and warm season forage cover crop mixes under no‐till (CC‐NT). The study indicates that the occurrence of agricultural drought is projected to increase while erosion rates will remain unchanged under the WW‐CT. In contrast, climate simulations imposed on the WW‐NT and CC‐NT systems significantly reduce runoff and sediment while preserving soil moisture levels. Especially, implementing the CC‐NT system can bolster food security and foster sustainable farming practices in Central Oklahoma in the face of a changing climate.

Environmental Sciences & Ecology↗

Recorded Information Management Records Move Project

Throughout the history of Sandia National Laboratories, both federal and corporate records have been stored in 12 structures in remote areas of the lab, none of which are compliant storage facilities under federal regulations. Upon inspection by the National Archives and Records Administration (NARA), findings were levied against Sandia along with recommendations on correcting the issues. The RM Department anticipated over 38,000 boxes of legacy records in Sandia’s current holdings. The current storage areas present an abundance of unknown issues and risks associated with the move project. Along with the large amount of records, and media types, this project faces issues with over 50 years of ever changing filing systems and human error pertaining to data entry, boxes being processed and destroyed. This document presents the final data and results pertaining to the Recorded Information Management Department corrective actions in a well laid out project plan that accommodated safety, security, environmental concerns and of course the records.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Wetland Flow and Salinity Budgets and Elements of a Decision Support System toward Implementation of Real-Time Seasonal Wetland Salinity Management

The project has provided science-based tools for the long-term management of salinity in drainage discharges from wetlands to the San Joaquin River. The results of the project are being used to develop best management practices (BMP) and a decision support system to assist wetland managers adjust the timing of salt loads delivered to the San Joaquin River during spring drawdown. Adaptive drainage management scheduling has the potential to improve environmental compliance with salinity objectives in the Lower San Joaquin River by reducing the frequency of violation of Vernalis salinity standards, especially in dry and critically dry years. The paired approach to project implementation whereby adaptively managed and traditional practices were monitored in a side-by-side fashion has provided a quantitative measure of the impacts of the project on the timing of salt loading to the San Joaquin River. The most significant accomplishments of the project has been the technology transfer to wetland biologists, ditch tenders and water managers within the Grasslands Ecological Area. This “learning by doing” has build local community capacity within the Grassland Water District and California Department of Fish and Game providing these institutions with new capability to assess and effectively manage salinity within their wetlands while simultaneously providing benefits to salinity management of the San Joaquin River.

54 ENVIRONMENTAL SCIENCES↗

K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

K-311-1 was constructed along with the rest of the K-25 Building in the 1943-1945 timeframe. K-311-1 was equipped with Size 3 converters and Size 38 Allis Chalmers{trademark} single-stage centrifugal compressors driven by 3600 rpm electric motors, and the unit operated as the 'bottom' unit flow-wise in K-25. The depleted flow from the bottom stage in K-311-1 passed through booster compressors and flowed to the K-601 Building where the depleted or 'tails' material was removed. In 1948, after the K-27 Building was completed, the decision was made to operate K-27 and K-25 in series rather than operate the two buildings as separate entities. To facilitate this operation, concrete bases were poured and two sets of booster compressors were installed in the extreme West end of the K-311-1 cell floor. These compressors were enclosed in heated housings and consisted of Size 38 compressors. One pair was to boost the 'B' flow between K-25 and K-27, and one pair was to boost the 'A' flow between the buildings. Each station operated with one compressor on-stream and the other in standby. (Reference 9) Each station also was equipped with a Size 2 after-cooler located in the discharge stream downstream of the junction of the onstream and standby compressors. Additional gaseous diffusion capacity was added at Oak Ridge as K-29, K-31, and K-33 were constructed and placed in service in the early 1950s. As a result of the additional process equipment added by these buildings, in-leakage of light gases to the cascade including light gases introduced into the cascade as a result of purging operations threatened to exceed the capacity of the existing K-312 Purge Cascade facilities in the K-25 Building. As a result, in 1954 K-311-1 was converted to a side purge cascade to remove light gases from the process gas stream as the stream entered K-25 from K-27. Low molecular weight gas in-leakage in K-33, K-31, K-29, and K-27 was removed by the K-311-1 Side Purge Facility and a relatively pure stream of UF6 then passed from K-311-1 into the upstream cells in K-25. In-leakage of light gases in the K-25 Building continued to be removed by the K-312 Purge Facilities. K-311-1 operated as a Side Purge Cascade from 1954 until the K-25 Building was shut down in 1964; at that time K-311-1 became the Oak Ridge Gaseous Diffusion Plant (ORGDP) Top (and only) Purge Cascade. The adjacent K-310-3 Unit was operated along with K-311-1 as the top purge cascade and K-310-2 was also operated at times to supplement cells in the K311-1/K-310-3 Purge Cascade. K-311-1 was shut down on February 14, 1977, after the newer, larger capacity K-402-9 Purge Cascade was placed in operation. K-310-3 continued to operate until the K-402-8 Coolant Removal Unit was placed in service, and K-310-3 was shut down on March 14, 1978. Since the K-311-1 and K-310-3 units continued to operate after K-25 shutdown, removal of equipment such as valves and piping for other projects did not occur in this area. As a result, these two units have not been exposed to atmospheric wet air over the years as much of the remainder of K-25 has been exposed. Any deposits or residual gases contained in K-311-1 or K-310-3 are not likely to be fully hydrolyzed.

54 ENVIRONMENTAL SCIENCES↗

DOE-EM/HBCU Projects for Environmental Management Research and Workshop Development at SCSU [Conference Papers/Proceedings]. Final Report

The Department of Energy’s Office of Environmental Management (DOE-EM) established a Memorandum of Understanding (MOU) with nine HBCUs in South Carolina and Northeast Georgia. The nine HBCUs (Allen University, Benedict College, Claflin University, Clinton Junior College, Demark Technical College, Morris College, South Carolina State University, Voorhees College and Paine College of Northeast Georgia) have formulated a consortium to address the technical and workforce development needs of the DOE’s Office of Environmental Management. These institutions have the qualifications and expertise to provide the technical cooperation and operations support in the areas of environmental remediation, nuclear regulatory and transportation safety, modeling, technology transfer and workforce development. Several of the HBCUs have received awards from the DOE to address issues related to ground water, surface water, plant communities, the development of an interdisciplinary waste management institute, and the establishment of an environmental science field station. Also, the acquisition of these grant awards have afforded the participating institutions with the ability to instruct students by providing them with the appropriate skill sets to address the future employment needs of DOE to include: Hands-on field experiences; Classroom demonstrations; and, Research and education experiences. South Carolina State University will build upon its existing relationships with DOE-EM by creating a "pipeline" for minorities in Mathematics, Science & Technology, Engineering, Research, and other related fields. Students will be specifically trained and mentored to enter the DOE workforce in these technical areas of need. The integration of technology in research and education is essential for meeting the demanding need to develop a workable mechanism to optimize the effectiveness of research and education in this nation. This is extremely critical in this age of unprecedented technological advances when information delivery, training, and continuous research to improve performance and skill enhancement hold the key to competition. This development relies on a program of applied science to identify and help implement the technologies, as well as programs that energize and mentor the next generation of scientists and engineers. To foster these goals, SCSU proposes research and educational projects that will support the integration of technology in research and education.

54 ENVIRONMENTAL SCIENCES↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

A high-performance workflow system for subsurface simulation

Subsurface modeling applications typically neglect uncertainty in the conceptual models, past or future scenarios, and attribute most or all uncertainty to errors in model parameters. In this contribution, uncertainty in technetium-99 transport in a heterogeneous, deep vadose zone is explored with respect to the conceptual model using a next generation user environment called Akuna. Akuna provides a range of tools to manage environmental modeling projects, from managing simulation data to visualizing results from high-performance computational simulators. Core toolsets accessible through the user interface include model setup, grid generation, parameter estimation, and uncertainty quantification. The BC Cribs site at Hanford in southeastern Washington State is used to demonstrate Akuna capabilities. At the BC Cribs site, conceptualization of the system is highly uncertain because only sparse information is available for the geologic conceptual model, the physical and chemical properties of the sediments, and the history of waste disposal operations. Using the Akuna toolset to perform an analysis of conservative solute transport, significant prediction uncertainty in simulated concentrations is demonstrated by conceptual model variation. This demonstrates that conceptual model uncertainty is an important consideration in sparse data environments such as BC Cribs. It is also demonstrated that Akuna and the underlying toolset provides an integrated modeling environment that streamlines model setup, parameter optimization, and uncertainty analyses for high-performance computing applications.

Akuna↗

Power Electronics Thermal Management

This project conducts research to develop new power electronics thermal management technologies to increase power density, enable high WBG temperature operation, and decrease cost. One of the main challenges to achieving high power densities is associated with packaging of high-temperature (250°C) WBG devices near lower-temperature-rated components (e.g., electrical boards and capacitors). Additionally, the high junction temperatures of the WBG devices will result in large temperature gradients through the power module layers that will present reliability challenges and require higher-temperature substrates and bonding materials.

47 OTHER INSTRUMENTATION↗

Power Electronics Thermal Management

This project conducts research to develop new power electronics thermal management technologies to increase power density, enable high WBG temperature operation, and decrease cost. One of the main challenges to achieving high power densities is associated with packaging of high-temperature (up to 250 degrees C) WBG devices near lower-temperature-rated components (e.g., electrical boards and capacitors). Additionally, the high junction temperatures of the WBG devices will result in large temperature gradients through the power module layers, which will present reliability challenges and require higher-temperature substrates and bonding materials.

ADVANCED PROPULSION SYSTEMS↗