Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

A Global Survey of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D): A Guide to Interactive Global Map Layers, Table Database, References and Notes

These associated tables, references, notes, and report present a synthesis of some notable geotechnical and engineering information used to create four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies or disposal facilities 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding “deep underground” facilities, history, activities, and plans. In general, the interactive maps and database provide each facility’s approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not comprehensive, it is representative of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

58 GEOSCIENCES↗

Fiscal Year 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs. The Area 3 RWMS was placed in stand-by in 2006 and remained inactive in FY 2018. Resumption of waste disposal operations is planned for FY 2019. No proposed actions, new information, or discoveries affecting the Area 3 RWMS were identified in FY 2018. No significant changes have occurred since preparation of the most recent special analysis, which indicates a continuing reasonable expectation of meeting the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management.” No changes were made to documents supporting the Radioactive Waste Management Basis (RWMB) including the PA, CA, DAS, waste acceptance criteria (WAC), closure plan, monitoring plan, or maintenance plan. Monitoring results for the most recent year with available data, calendar year (CY) 2017, indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 3 RWMS Drainage Lysimeter Facility continue to be consistent with the conceptual site model (CSM). All Area 3 RWMS DAS conditions and secondary issues were closed in 2002. The Area 5 RWMS continued disposal operations within the Northern Expansion Area in FY 2018. Eighty-six changes involving proposed actions, new information, or discoveries affecting the Area 5 RWMS PA and CA were screened during FY 2018 in the Unreviewed disposal question (UDQ) process. Twenty-two changes required UDQ evaluations and two changes resulted in unreviewed composite analysis question evaluations. None of the proposed actions, new information, or discoveries had significant impacts on the PAs or CAs. All of the planned changes were implemented. No special analyses were performed, and no changes were made to documents supporting the RWMB including the PA, CA, DAS, WAC, closure plan, monitoring plan, or maintenance plan. Planning continued and construction commenced on development of the Western Expansion Area within the Radioactive Waste Management Complex. All Area 5 RWMS DAS conditions and secondary issues were closed in 2002. The cumulative effects of changes occurring since preparation of the Area 5 RWMS PA and CA were assessed with the current baseline PA/CA model. Model results indicate that there is a reasonable expectation that the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management,” can be met. No PA or CA mean result exceeds 50% of its performance objective. Monitoring results and R&D results continue to be consistent with the CSM. Monitoring results for CY 2017 indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 5 RWMS Weighing Lysimeter Facility continue to be consistent with the CSM. The FY 2018 review of Area 3 RWMS and Area 5 RWMS disposal operations supports the following conclusions: The Area 3 and Area 5 RWMS PA and associated CA assumptions and conclusions remain valid based on consideration of all changes identified or planned; The reasonable expectation that the Area 3 and Area 5 RWMSs will meet the performance objectives identified in DOE O 435.1, “Radioactive Waste Management”, remains valid; and The DAS, based on interpretation of the data collected, monitoring results, and other information, continues to be adequate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 6)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 8)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 9)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 10)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 11)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 12)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts have been made to utilize the remaining disposal capacity within MDA G to the greatest extent possible. One approach for doing this has been to dispose of low-activity waste from cleanup operations at LANL in the headspace of selected disposal pits. Waste acceptance criteria (WAC) for the material placed in the headspace of pits 15, 37, and 38 have been developed (LANL, 2010) and the impacts of placing waste in the headspace of these units has been evaluated (LANL, 2012a). The efforts to maximize disposal efficiency have taken on renewed importance because of the disposal demands placed on MDA G by the large volumes of waste that are being generated at LANL by cleanup efforts. For example, large quantities of waste were recently generated by the retrieval of waste formerly disposed of at TA-21, MDA B. A portion of this material has been disposed of in the headspace of pit 38 in compliance with the WAC developed for that disposal strategy; a large amount of waste has also been sent to off-site facilities for disposal. Nevertheless, large quantities of MDA B waste remain that require disposal. An extension of pit 38 was proposed to provide the disposal capacity that will be needed to dispose of institutional waste and MDA B waste through 2013. A special analysis was prepared to evaluate the impacts of the pit extension (LANL, 2012b). The analysis concluded that the disposal unit could be extended with modest increases in the exposures projected for the Area G performance assessment and composite analysis, as long as limits were placed on the radionuclide concentrations in the waste that is placed in the headspace of the pit. Based, in part, on the results of the special analysis, the extension of pit 38 was approved and excavation of the additional disposal capacity was started in May 2012. The special analysis presented here uses performance modeling to identify a disposal plan for the placement of waste in pit 38. The modeling uses a refined design of the disposal unit and updated radionuclide inventories to identify a disposal configuration that promotes efficient utilization of the pit and ensures continued compliance with DOE Order 435.1 performance objectives. Section 2 describes the methods used to conduct the analysis; the results of the evaluation are provided in Section 3. The disposal plan for pit 38 is provided in Section 4 and the conclusions of the investigation are provided in Section 5. Throughout the report, pit 38 is used to refer to the entire disposal unit, including the existing pit and the extension that is currently under construction. Where a distinction between the two portions of the pit is necessary, the existing unit is referred to as pit 38 proper and the new portion of the pit as the pit 38 extension or, more simply, the extension.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the Oak Ridge National Laboratory General Radioactive Sources Low-Level Waste at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Oak Ridge National Laboratory (ORNL) General Radioactive Sources (ORNLSOURCES01, Revision 5 [ORNL 2017]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the ORNL General Radioactive Sources meets all U.S. Department of Energy (DOE) Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P performance objectives (DOE 1999).The ORNL General Radioactive Sources waste stream is recommended for acceptance with the following conditions: The total waste stream tritium (3H) inventory shall not exceed 5E10 Bq. The total waste stream strontium-90 (90Sr) inventory shall not exceed 5E9 Bq. The total waste stream cesium-137 (137Cs) inventory shall not exceed 2E11 Bq. The total waste stream radium-226 (226Ra) inventory shall not exceed 2E10 Bq. The total waste stream protactinium-231 (231Pa) inventory shall not exceed 2E9 Bq. The total waste stream uranium-234 (234U) inventory shall not exceed 5E9 Bq.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Requirements for Using Overweight Vehicles to Ship Spent Nuclear Fuel

The U.S. Department of Energy's (DOE's) Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada, considered a range of options for transportation. In evaluating the impacts of the mostly-legal weight truck scenario, DOE assumed that some shipments would use overweight trucks. The use of overweight trucks is also considered in the Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada, issued for public comment in Fall 2007. With the exception of permit requirements and operating restrictions, the vehicles for overweight shipments would be similar to legal-weight truck shipments but might weigh as much as 52,200 kilograms (115,000 pounds). The use of overweight trucks was determined to be acceptable for the Office of Civilian Radioactive Waste Management (OCRWM) Program because the payload is not divisible and the packaging alone may make shipments overweight. Overweight truck shipments are common, and states routinely issue overweight permits, some for vehicles with a gross vehicle weight up to 58,500 kilograms (129,000 pounds). This paper will present an overview of state overweight truck permitting policies and national and regional approaches to promote safety and uniformity. In conclusion: Overweight truck shipments are made routinely by carriers throughout the country. State permits are obtained by the carriers or by companies that provide permitting services to the carriers. While varying state permit restrictions may add complexity to OCRWM's planning activities, the well-established experience of commercial carriers and efforts to bring uniformity to the permitting process should allow the overweight shipment of SNF to be a viable option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Microwave Technology for TENORM Waste Treatment - 17377

The sludge and scales generated by the oil and gas industry usually contain radionuclides of the thorium and uranium decay chains, the so-called technologically enhanced, naturally occurring radioactive materials (TENORM) waste. The handling of this waste must consider both the radiation risks presented by those radionuclides and its chemical toxicity, due to the decomposition of oil residues, which may generate hydrogen sulfide and other hazardous compounds. In the case of Brazil, Public Law 10.308 limits the management options for radioactive waste generated by offshore oil production rigs to drumming and storage; it prohibits disposal of any radioactive waste in sea-waters, seabed or oceanic islands. This paper describes the results of the work to develop a treatment process using a specially designed microwave oven, which removes simultaneously water and hydrocarbons from the sludge, thus reducing the volume, the chemical toxicity and the chemical reactivity of the waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis for the Disposal of the Portsmouth Uranium Fluoride Solids Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This special analysis (SA) evaluates whether the Portsmouth Gaseous Diffusion Plant (PORT) Uranium (U) Fluoride Solids waste stream is suitable for disposal by shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site (NNSS). The PORT U Fluoride Solids waste stream consists of highly enriched uranium solids. The PORT U Fluoride Solids waste stream requires an SA to resolve whether it is acceptable to dispose of technetium-99 ( 99 Tc), uranium-234 ( 234 U), and thorium-230 ( 230 Th) with activity concentrations exceeding the NNSS Waste Acceptance Criteria Action Levels.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of a Loess-Cement Cushion as an Integral Component of an SL-LILW Repository - 16077

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for short-lived low and intermediate level radioactive waste, the National Disposal Facility (NDF), adjacent to the Kozloduy Nuclear Power Plant (KNPP). The NDF will be constructed as a reinforced concrete vault-type repository system, where prefabricated cubic waste packages (2 m on a side) will be emplaced in large reinforced concrete disposal cells. Waste emplacement operations will be conducted in three phases over a total of 60 years of operations. After the last waste packages have been disposed, an engineered multilayer cover will be installed over the site to further isolate the waste from the accessible environment. The Radiana Site where the NDF will be constructed is a sloping area located between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. The unsaturated zone at the location selected for waste disposal ranges from 13 m to 16 m in thickness. After construction, the unsaturated zone will consist of a 5 m thick, engineered loess-cement cushion installed over naturally occurring Pliocene clays and sandy clayey sediments of the Brusarci Formation with a thickness above the top of groundwater ranging from 8 m to 11 m. The loess-cement cushion is a key component of the 'engineered fill' barrier as identified in the Intermediate Safety Assessment Report (ISAR) for the NDF. This barrier consists of engineered fill both below the disposal cells, i.e., the loess-cement cushion, and above the disposal cells, i.e. the final multilayer cover to be installed at closure of the facility. The loess-cement cushion component of this barrier will act to provide a geo-technically stable foundation for the disposal system. In addition, the barrier will raise the base of the disposal cells and increases the unsaturated zone thickness above the top of the groundwater table, as well as to serve as a chemical barrier that will act to sorb radionuclides thereby retarding their migration to the underlying groundwater. In addition to its assigned barrier functions the loess cement cushion also houses key embedded components required as part of the overall NDF safety concept, including systems necessary for operational and post-closure performance monitoring as well as the support foundation structures required for the mobile roofs, which are designed to handle and protect the waste during emplacement operations. The post-closure monitoring period, i.e., the period of institutional control, is given by as 300 years. While similar although less massive cushions have been previously constructed as foundations for various structures at the KNPP, the loess-cement cushion planned for construction at the NDF including the embedded structures will represent a first of its kind construction in terms of both its physical dimensioning as well as its requirements for long-term performance. This paper describes the design of the cushion, its functions and its construction as planned for the NDF as an integral component of the site safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗