Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Remaining Sites Verification Package for the 100-F-26:12, 1.8-m (72-in.) Main Process Sewer Pipeline, Waste Site Reclassification Form 2007-034

The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-F-19 reactor cooling water effluent pipeline↗

Study on a regeneration process of LiCl-KCl eutectic based waste salt generated from the pyrochemical process

A regeneration process of LiCl-KCl eutectic waste salt generated from the pyrochemical process of spent nuclear fuel has been studied. This regeneration process is composed of a chemical conversion process and a vacuum distillation process. Through the regeneration process, a high efficiency of renewable salt recovery can be obtained from the waste salt and rare earth nuclides in the waste salt can be separated as oxide or phosphate forms. Thus, the regeneration process can contribute greatly to a reduction of the waste volume and a creation of durable final waste forms. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementing a Low Activity Waste Direct Feed Capability in the Hanford Waste Treatment Plant - 17277

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Using this approach, low-activity waste will be pretreated in a Low-Activity Waste Pretreatment System (LAWPS) for cesium and solids separation to meet LAW Facility safety basis requirements and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed waste burial ground located in the Hanford 200-East Area. The primary driver for the DFLAW approach is to enable commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste (HLW) facilities. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the HLW Facility must be refined and modified to enable DFLAW operations. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. For example, liquid effluents from the LAW Facility, primarily melter offgas condensate, will be processed in a new effluent management facility (EMF) within the WTP footprint rather than sending the effluent back to the PT Facility for processing. During DFLAW operations approximately 3 785 m{sup 3} (1 million gallons) of double-shell tank (DST) waste will be delivered to WTP for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the DSTs will support safe tank farm operation and staging of additional waste for treatment. In December 2016, DOE executed a contract modification and approved an incremental change to the project's performance baseline to complete the WTP facilities needed to allow direct feed of low-activity waste to the LAW Facility. The revised performance baseline supports completion and cold commissioning of the WTP facilities needed for DFLAW operations no later than August 2023. The design of modifications to WTP facilities needed to enable DFLAW operations is more that 60 percent complete. DOE approved the preliminary safety basis for DFLAW modifications to WTP based on the 30 percent design package in early 2016. Early construction work for DFLAW modifications to WTP began in mid-2015. Long-lead procurement actions for some of the more complex equipment needed for LAW Facility effluent treatment were initiated in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenhouse gas emissions from home composting of organic household waste

The emission of greenhouse gases (GHGs) is a potential environmental disadvantage of home composting. Because of a lack of reliable GHG emission data, a comprehensive experimental home composting system was set up. The system consisted of six composting units, and a static flux chamber method was used to measure and quantify the GHG emissions for one year composting of organic household waste (OHW). The average OHW input in the six composting units was 2.6-3.5 kg week{sup -1} and the temperature inside the composting units was in all cases only a few degrees (2-10 {sup o}C) higher than the ambient temperature. The emissions of methane (CH{sub 4}) and nitrous oxide (N{sub 2}O) were quantified as 0.4-4.2 kg CH{sub 4} Mg{sup -1} input wet waste (ww) and 0.30-0.55 kg N{sub 2}O Mg{sup -1} ww, depending on the mixing frequency. This corresponds to emission factors (EFs) (including only CH{sub 4} and N{sub 2}O emissions) of 100-239 kg CO{sub 2}-eq. Mg{sup -1} ww. Composting units exposed to weekly mixing had the highest EFs, whereas the units with no mixing during the entire year had the lowest emissions. In addition to the higher emission from the frequently mixed units, there was also an instant release of CH{sub 4} during mixing which was estimated to 8-12% of the total CH{sub 4} emissions. Experiments with higher loads of OHW (up to 20 kg every fortnight) entailed a higher emission and significantly increased overall EFs (in kg substance per Mg{sup -1} ww). However, the temperature development did not change significantly. The GHG emissions (in kg CO{sub 2}-eq. Mg{sup -1} ww) from home composting of OHW were found to be in the same order of magnitude as for centralised composting plants.

54 ENVIRONMENTAL SCIENCES↗

A BIM-based system for demolition and renovation waste estimation and planning

Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A multi-echelon supply chain model for municipal solid waste management system

In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition Plan for the K-1203 Sewage Treatment Plant, East Tennessee Technology Park, Oak Ridge, Tennessee

The K-1203 Sewage Treatment Plant (STP) was previously used to treat and process all sanitary sewage waste from the East Tennessee Technology Park (ETTP). The plant was shut down on May 29, 2008 as a result of the transition of sewage treatment for ETTP to the City of Oak Ridge. The City of Oak Ridge expanded the Rarity Ridge Sewage Treatment Plant (RRSTP) to include capacity to treat the waste from the ETTP and the Community Reuse Organization of East Tennessee (CROET) constructed a new ETTP lift station and force main to RRSTP. In preparation for the shutdown of K-1203, the US Department of Energy (DOE) in conjunction with Operation Management International (OMI) developed a shut down plan to outline actions that need to occur prior to the transition of the facility to Bechtel Jacob Company, LLC (BJC) for decontamination and demolition (D and D). This plan outlines the actions, roles, and responsibilities for BJC in order to support the transition of the K-1203 STP from OMI to the BJC Surveillance and Maintenance (S and M) and D and D programs. The D and D of the K-1203 Facilities is planned under the Comprehensive Environmental Response, Compensation, and Liability Act Remaining Facilities D and D Action Memorandum in the Balance of Site-Utilities D and D Subproject in fiscal year (FY) 2014.

54 ENVIRONMENTAL SCIENCES↗

A Simulation Modeling Approach to Optimizing Nuclear Waste Dispositioning

The dispositioning of nuclear waste generated at facilities across the country is an ongoing battle that affects us all. National laboratories and research centers dealing in medical research, clean energy, and other nuclear activities such as the Department of Energy (DOE) facilities face the need to properly manage and dispose of nuclear waste. A dynamic modeling solution would enable the DOE and others to make decisions on waste disposal and technological options. In doing so, this research explores modeling techniques using available data to address these situations. The focus being on developing an initial robust and adaptable discrete event model using the ExtendSim tool. This modeling effort will target the dispositioning of transuranic waste at the Savannah River National Laboratory (SRNL) which can be expanded to represent the current state of disposition process for waste generated at other DOE facilities. The model aims to assess resource allocation and waste processing options to stabilize productivity and cut the backlog of nuclear waste. By assessing the results of different scenarios, this research aims to provide actionable insights for the DOE. This approach has the potential to significantly improve the management of radioactive waste, offering the capability of evaluating options for optimizing the process for nuclear waste disposal. The findings of this study can serve as a valuable resource for decision-makers and other national laboratories, or research entities engaged in nuclear operations by enabling them to make more informed choices.

Andaverde, Alexis↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Ion Exchange Processes on Industrial Waste Streams for CO 2 Mineralization

Economic development and population growth will lead to an increase in global energy consumption. Large coal-fired power plants (>500 MW) account for almost half of the total CO 2 emissions from fossil fuel combustion, and nearly 26% of the global fossil fuel and industry CO 2 emissions. Long-term management of the more than 36 Gt of CO 2 that is emitted globally per year is urgently needed. CO 2 mineralization is an attractive method of sequestering CO 2 because it captures CO 2 as an insoluble carbonate mineral, mimicking the natural process of rock weathering. Here, we present a pathway for accelerated CO 2 mineralization enabled by divalent cations sourced from liquid streams. In this work, we investigate a mineralization route that converts flue gas CO 2 to precipitated calcium carbonate (PCC) using waste aqueous streams as the calcium source. The proposed mineralization route integrates CO 2 utilization and waste liquid management at coal power plants. Maintaining alkalinity during carbonation is the primary challenge in this process. Instead of relying on the consumption of costly and unsustainable sources of alkalinity (e.g., sodium hydroxide), we used regenerable solids to increase the pH of water by ion exchange. The increase in alkalinity creates a more thermodynamically favorable environment for calcite precipitation. The capacities for ion exchange of various commercially available zeolites and ion exchange resins in CO 2 -saturated water were studied through batch equilibrium and column ion-exchange experiments. During ion exchange, H + in the water exchanges with Na + , Ca 2+ or K + in the zeolite or resin. Batch equilibrium isotherms for H + –Na + exchange were collected by first adding varying amounts of the ion exchange solid (0 – 1.0 kg per kg of water) to CO 2 -saturated water (pCO 2 = 1 atm, pH 4) to determine the maximum H + –Na + exchange achievable. Ion-exchange column studies were performed to determine breakthrough capacity of the system. In both systems, an increase in pH coupled with an increase in Na concentration was observed, demonstrating the feasibility of forward ion exchange. Zeolitic materials increased the alkalinity of the solution from pH 4 to around 10, whereas ion exchange resins containing weakly acidic functional groups (e.g., carboxylic acid) exhibited higher affinity for H + , increasing pH to 11.3 and surpassing the pH shift induced by the zeolitic materials. The extent of calcite precipitation was evaluated by mixing the alkaline CO 3 2- -rich water obtained after passing through the ion-exchange column and a CaCl 2 solution. Calcite yields are as expected from chemical thermodynamics. Calcium carbonate yields found experimentally were about 26 and 8 mmol per kg water for the weakly acidic ion exchange resin and zeolitic materials, respectively. The results from these studies indicate that ion exchange processes can be used as an alternative to the addition of stoichiometric inorganic bases (e.g., sodium hydroxide) to induce alkalinity for the consequent precipitation of CaCO 3 . Instead, weakly acidic ion exchange resins commonly used for water hardness removal were alternatively used to induce pH swings in the aqueous solutions. The high calcium carbonate yields obtained for the materials examined demonstrate the potential application of this process. In addition, the successful operation of the calcium carbonate production process at standard temperature and pressure conditions support its potential for industrial implementation.

Simonetti, Dante↗

Development of cement solidification process for sodium borate waste generated from PWR plants

A cement solidification process for treating sodium borate waste produced in pressurized water reactor (PWR) plants was studied. To obtain high volume reduction and high mechanical strength of the waste, simulated concentrated borate liquid waste with a sodium / boron (Na/B) mole ratio of 0.27 was dehydrated and powdered by using a wiped film evaporator. To investigate the effect of the Na/B mole ratio on the solidification process, a sodium tetraborate decahydrate reagent with a Na/B mole ratio of 0.5 was also used. Ordinary portland cement (OPC) and some additives were used for the solidification. Solidified cement prepared from powdered waste with a Na/B mole ratio 0.24 and having a high silica sand content (silica sand/cement>2) showed to improved uniaxial compressive strength. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Chlorination Process for Cladding Hull Waste and its Combination with Pyroprocessing

The Korea Atomic Energy Research Institute (KAERI) is spending efforts to minimize the amount of radioactive wastes generated during pyro-processing. One of the major issues is management of cladding hull waste owing to its large amount (25 wt.% of fuel) and high radioactivity. Although the cladding hull waste might be classified as an intermediate-level waste according to the Korean regulation, the large amount makes it reasonable to develop a way to reduce the amount of cladding hull waste. Previously performed radioactivation analysis results revealed that selective recovery of zirconium from the cladding hull waste will produce a weak beta-decaying zirconium. As a means of selective Zr recovery, KAERI is working on a chlorination process which employs a chemical reaction between metallic zirconium and chlorine gas. The chlorination process generates zirconium tetrachloride (ZrCl{sub 4}) which sublimes at 331 deg. C leading to an easy separation from other radioactive nuclides. KAERI has started the chlorination process R and D with small quartz reactors with grams of cladding hulls, and now its work is proceeded to fundamental approaches and scale-up. In this work, the progress achieved by KAERI on the chlorination process is reviewed and a recent approach to combine the chlorination process with pyro-processing, so-called MKZP (Min Ku Zirconium Process) is introduced. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Exergy analysis of the Chartherm process for energy valorization and material recuperation of chromated copper arsenate (CCA) treated wood waste

The Chartherm process (Thermya, Bordeaux, France) is a thermochemical conversion process to treat chromated copper arsenate (CCA) impregnated wood waste. The process aims at maximum energy valorization and material recuperation by combining the principles of low-temperature slow pyrolysis and distillation in a smart way. The main objective of the exergy analysis presented in this paper is to find the critical points in the Chartherm process where it is necessary to apply some measures in order to reduce exergy consumption and to make energy use more economic and efficient. It is found that the process efficiency can be increased with 2.3-4.2% by using the heat lost by the reactor, implementing a combined heat and power (CHP) system, or recuperating the waste heat from the exhaust gases to preheat the product gas. Furthermore, a comparison between the exergetic performances of a 'chartherisation' reactor and an idealized gasification reactor shows that both reactors destroy about the same amount of exergy (i.e. 3500 kW kg{sub wood}{sup -1}) during thermochemical conversion of CCA-treated wood. However, the Chartherm process possesses additional capabilities with respect to arsenic and tar treatment, as well as the extra benefit of recuperating materials.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Waste Determination Equivalency - 12172

The Savannah River Site (SRS) is a Department of Energy (DOE) facility encompassing approximately 800 square kilometers near Aiken, South Carolina which began operations in the 1950's with the mission to produce nuclear materials. The SRS contains fifty-one tanks (2 stabilized, 49 yet to be closed) distributed between two liquid radioactive waste storage facilities at SRS containing carbon steel underground tanks with storage capacities ranging from 2,800,000 to 4,900,000 liters. Treatment of the liquid waste from these tanks is essential both to closing older tanks and to maintaining space needed to treat the waste that is eventually vitrified or disposed of onsite. Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005 (NDAA) provides the Secretary of Energy, in consultation with the Nuclear Regulatory Commission (NRC), a methodology to determine that certain waste resulting from prior reprocessing of spent nuclear fuel are not high-level radioactive waste if it can be demonstrated that the waste meets the criteria set forth in Section 3116(a) of the NDAA. The Secretary of Energy, in consultation with the NRC, signed a determination in January 2006, pursuant to Section 3116(a) of the NDAA, for salt waste disposal at the SRS Saltstone Disposal Facility. This determination is based, in part, on the Basis for Section 3116 Determination for Salt Waste Disposal at the Savannah River Site and supporting references, a document that describes the planned methods of liquid waste treatment and the resulting waste streams. The document provides descriptions of the proposed methods for processing salt waste, dividing them into 'Interim Salt Processing' and later processing through the Salt Waste Processing Facility (SWPF). Interim Salt Processing is separated into Deliquification, Dissolution, and Adjustment (DDA) and Actinide Removal Process/Caustic Side Solvent Extraction Unit (ARP/MCU). The Waste Determination was signed by the Secretary of Energy in January of 2006 based on proposed processing techniques with the expectation that it could be revised as new processing capabilities became viable. Once signed, however, it became evident that any changes would require lengthy review and another determination signed by the Secretary of Energy. With the maturation of additional salt removal technologies and the extension of the SWPF start-up date, it becomes necessary to define 'equivalency' to the processes laid out in the original determination. For the purposes of SRS, any waste not processed through Interim Salt Processing must be processed through SWPF or an equivalent process, and therefore a clear statement of the requirements for a process to be equivalent to SWPF becomes necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗