Search NASA⌕ Search

SEARCH · Search NASA

Results for “WEST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Ventilation planning at Energy West's Deer Creek mine

In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Performance Analysis of the SensorNet's Southeastern Transportation Corridor Pilot Viewer at the Dorchester West Bound Interstate Weigh Station

Since the 9-11 attacks, the United States has increased its focus on developing technologies designed to warn us in the event of another attack and to prevent these attacks from happening in the first place. The SensorNet research group at Oak Ridge National Laboratory's (ORNL) Computer Science and Engineering Division is participating in this effort by developing systems to give critical real-time information to federal, state, and local emergency response decision makers. SensorNet has approached this goal by putting together a system with several sensors and programs called the Southeastern Transportation Corridor Pilot project (SETCP). The SETCP utilizes interstate weigh stations not only to weigh the passing trucks but also to check for gamma and neutron radiation inside the truck without the aid of a human in close proximity. The system also collects additional data that help identify the truck (the truck's length, weight, license plate number, and photographs of the truck). The objective of this research work was to characterize and analyze the data collected from the South Carolina weigh station on I-26W and compare it with previous data analysis on the performance of the Tennessee weigh station on I-40E. The purpose was to find patterns in the trucks with radioactive alarms and, regional truck traffic, as well as to find patterns of inconsistency in the system (illogical length measurements of the truck, inaccurate readings and character recognition of the license plate). During a three-month period, radioactive alarms and traffic patterns were identified and characterized by grouping all of the data and making graphs and charts in Microsoft Excel to show the flow of traffic, the type of truck traffic, the number of alarms and other information. Inconsistence patterns were found by analyzing the data, looking for missing or illogical information, and determining how often it happens. The improvements of these inconsistencies were also analyzed after repairs were made to the system. Given the small number of radiation alarms detected, there were no clear patterns found. Further research has to be done in this area; also, the analysis period needs to be extended from three months to a year. For traffic flow patterns, it was found that the truck traffic was heaviest on Monday, Tuesday, and Wednesday. The inconsistencies found and fixed in the system were the illogical length measurements and the inaccurate reading and character recognition of the license plate. During the summer of 2007, a Florida International University (FIU) student supported this research work under the direct supervision of Mr. David Hill at ORNL's Computer Science and Engineering Division. The 10-week student internship was supported by the DOE/FIU Science and Technology Workforce Initiative, an innovative program developed by the US Department of Energy's Environmental Management (DOE-EM) and FIU's Applied Research Center (FIU-ARC) (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

54 ENVIRONMENTAL SCIENCES↗

Preparation for the Recovery of Spent Nuclear Fuel (SNF) at Andreeva Bay, North West Russia - 13309

Andreeva Bay is located near Murmansk in the Russian Federation close to the Norwegian border. The ex-naval site was used to de-fuel nuclear-powered submarines and icebreakers during the Cold War. Approximately 22,000 fuel assemblies remain in three Dry Storage Units (DSUs) which means that Andreeva Bay has one of the largest stockpiles of highly enriched spent nuclear fuel (SNF) in the world. The high contamination and deteriorating condition of the SNF canisters has made improvements to the management of the SNF a high priority for the international community for safety, security and environmental reasons. International Donors have, since 2002, provided support to projects at Andreeva concerned with improving the management of the SNF. This long-term programme of work has been coordinated between the International Donors and responsible bodies within the Russian Federation. Options for the safe and secure management of SNF at Andreeva Bay were considered in 2004 and developed by a number of Russian Institutes with international participation. This consisted of site investigations, surveys and studies to understand the technical challenges. A principal agreement was reached that the SNF would be removed from the site altogether and transported to Russia's reprocessing facility at Mayak in the Urals. The analytical studies provided the information necessary to develop the construction plan for the site. Following design and regulatory processes, stakeholders endorsed the technical solution in April 2007. This detailed the processes, facilities and equipment required to safely remove the SNF and identified other site services and support facilities required on the site. Implementation of this strategy is now well underway with the facilities in various states of construction. Physical works have been performed to address the most urgent tasks including weather protection over one of the DSUs, installation of shielding over the cells, provision of radiation protection infrastructure and general preparation of the site for construction of the facilities for the removal of the SNF. This paper describes the development and implementation of the strategy and work to improve the safe and secure management of SNF, preparing it for retrieval and removal from Andreeva Bay. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Updated Performance Assessment For A New Low-Level Radioactive Waste Disposal Facility In West Texas - 12192

This Performance Assessment (PA) submittal is an update to the original PA that was developed to support the licensing of the Waste Control Specialists LLC Low-Level Radioactive Waste (LLRW) disposal facility. This update includes both the Compact Waste Facility (CWF) and the Federal Waste Facility (FWF), in accordance with Radioactive Material License (RML) No. R04100, License Condition (LC) 87. While many of the baseline assumptions supporting the initial license application PA were incorporated in this update, a new transport code, GoldSim, and new deterministic groundwater flow codes, including HYDRUS and MODFLOWSURFACT{sup TM}, were employed to demonstrate compliance with the performance objectives codified in the regulations and RML No. R04100, LC 87. A revised source term, provided by the Texas Commission on Environmental Quality staff, was used to match the initial 15 year license term. This updated PA clearly confirms and demonstrates the robustness of the characteristics of the site's geology and the advanced engineering design of the disposal units. Based on the simulations from fate and transport models, the radiation doses to members of the general public and site workers predicted in the initial and updated PA were a small fraction of the criterion doses of 0.25 mSv and 50 mSv, respectively. In a comparison between the results of the updated PA against the one developed in support of the initial license, both clearly demonstrated the robustness of the characteristics of the site's geology and engineering design of the disposal units. Based on the simulations from fate and transport models, the radiation doses to members of the general public predicted in the initial and updated PA were a fraction of the allowable 25 mrem/yr (0.25 m sievert/yr) dose standard for tens-of-thousands of years into the future. Draft Texas guidance on performance assessment (TCEQ, 2004) recommends a period of analysis equal to 1,000 years or until peak doses from the more mobile radionuclides occur. The EPA National Emissions Standards for Hazardous Air Pollutants limits radionuclide doses through the air pathway to 10 mrem/yr. Gaseous radionuclide doses from the CWF and the FWF, due to decomposition gases, are a small fraction of the dose limit. The radon flux from the CWF and FWF were compared to the flux limit of 20 pCi/m{sup 2}-s from 40 CFR 192. Because of the thick cover system, the calculated radon flux was a very small fraction of the limit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Occupied Commercial Property Subject to Widespread Radium-226 Contamination - Confidential Client in the South-West of England - 12570

AMEC was contacted by a company that managed commercial office space in 2010. High Rn- 222 measurements had been observed throughout the facility and the landlord had been advised to commission a radiological survey of the site. The site had been purchased by the client in the 1990's. Initial desk studies found that the building had operated for around 50 years as a compass factory. Non-intrusive investigation identified widespread Ra-226 contamination. Ra-226 was found in the fabric of the building, in attic spaces, buried under floor boards and underlying car parks. Intrusive investigation was undertaken to estimate volume(s) of waste, waste categories, activity concentrations and the total inventory of radioactive materials on site. This work identified the presence of 180 GBq of Ra-226 on site. A programme of work is currently underway to remediate the site tackling areas posing the greatest risk to site occupants as a priority. We have worked closely with Regulators, our client, and tenants, to decontaminate the fabric of the building whilst areas of the building remain occupied. The radiological risk, from irradiation, ingestion and inhalation (of Ra-226 and Rn- 222) has been assessed before, during and after intervention to minimise the risks to site occupants. Tenants were moved from areas of unacceptable radiological risk to areas unaffected by the presence of radioactive materials. Rn-222 mitigation measures were installed during the remedial operations to minimise the hazard from Rn-222 that was liberated as a result of decontamination activities. Decontamination techniques were required to be sympathetic to the building as the ageing structure was in danger of collapse during several phases of work. The first phase of remediation is now complete and the decontaminated building is being returned for use as office space. The radiological risks have been significantly reduced and, in areas where decontamination was not possible (e.g. due to concerns over the structural integrity of the building), mitigation measures have been installed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West

Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West

Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗