Search NASA⌕ Search

SEARCH · Search NASA

Results for “compressor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

Method of construction for internally cooled diaphragms for centrifugal compressor

An internally-cooled compressor is provided including a casing and a diaphragm disposed in the casing. The diaphragm includes a diaphragm box defining a plurality of box channels and a bulb defining a plurality of bulb channels. A plurality of return channel vanes connect the diaphragm box and bulb in fluid communication, such that each return channel vane defines a plurality of return vane conduits coupled in fluid communication with the plurality of box channels and the plurality of bulb channels thereby forming a section of a cooling pathway. The cooling pathway is configured such that a cooling agent introduced from an external coolant source into the diaphragm box and flowing through a box channel flows through a return vane conduit into and through a bulb channel and back through another return vane conduit into another box channel before flowing back to the external coolant source.

42 ENGINEERING↗

Radial Compressor Design and Off-Design for Trans-critical CO2 Operating Conditions

Presentation for the The 7th International Supercritical CO2 Power Cycles Symposium, February 21 – 24, 2022, San Antonio, Texas. A multi-staged intercooled centrifugal compressor design is performed for an indirect-fired sCO2 cycle and the design point data are used to generate the performance maps using a 2D mean-line analysis code. Fluid and turbomachinery similarity laws are applied to find an appropriate surrogate ideal gas fluid to be used in the design and performance map generation codes. The performance maps are then scaled back for the sCO2 fluid case using the affinity laws.

Uysal, Selcuk Can↗

Apparatus and system for controlling power to an air conditioning compressor for a vehicle

A climate control system for vehicles includes an internal combustion engine that may be coupled to selectively power a first motor generator, and an air conditioning compressor that may be selectively powered by one or both of the first motor generator and a second motor generator, or by the internal combustion engine. The system may include a rechargeable battery, and a vehicle controller having a vehicle state circuit structured to determine a vehicle operating condition value and a state-of-charge value of the rechargeable battery, and a coupling determination circuit structured to provide an internal combustion engine-first motor generator coupling command in response to the vehicle operating condition value and the state-of-charge value. In response to the internal combustion engine-first motor generator coupling command being provided as coupled, the internal combustion engine may power the first motor generator.

Kumar, Mahesh Madurai↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

Fuel driven near isothermal compressor

A gas compressor system includes a compression liquid holding tank in fluid communication with a combustion tank. A combustible fluid is directed to the combustion tank. An ignition system is provided for igniting the combustible fluid. A compression liquid flows between the liquid holding tank, the combustion tank, and a compression tank. A compressible gas is provided in the compression tank. The ignition of the combustible fluid drives the compression liquid from the combustion tank to the compression tank, compressing the compressible liquid. An HVAC&R system and a method of compressing gas are also disclosed.

Momen, Ayyoub Mehdizadeh↗