Search NASA⌕ Search

SEARCH · Search NASA

Results for “full scale testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Flight Investigation at Low Angles of Attack to Determine the Longitudinal Stability and Control Characteristics of the Sidewinder Missile at Mach Numbers from 1.2 to 2.1

At the request of the Bureau of Ordnance, Department of the Navy, the Langley Pilotless Aircraft Research Division has initiated a program to investigate the general aerodynamic characteristics of the Naval Ordnance Test Station's SIDEWINDER missile. The model used in the flight test presented herein was a full-scale, rocket-propelled test vehicle. This paper presents the results from a flight test investigation using the pulsed-control technique to determine the static and dynamic longitudinal stability and control derivatives and drag data for a canard-missile configuration. The methods for obtaining these data are presented in references 1 and 2. This investigation was conducted at a small angle-of-attack range and for a Mach number range of 1.2 to 2.1. The model used in this investigation was flight-tested at the Langley Pilotless Aircraft Research Station at Wallops Island, Va.

Brown, Clarence A.↗

HIFiRE Direct-Connect Rig (HDCR) Phase I Scramjet Test Results from the NASA Langley Arc-Heated Scramjet Test Facility

A series of hydrocarbon-fueled direct-connect scramjet ground tests has been completed in the NASA Langley Arc-Heated Scramjet Test Facility (AHSTF) at simulated Mach 8 flight conditions. These experiments were part of an initial test phase to support Flight 2 of the Hypersonic International Flight Research Experimentation (HIFiRE) Program. In this flight experiment, a hydrocarbon-fueled scramjet is intended to demonstrate transition from dual-mode to scramjet-mode operation and verify the scramjet performance prediction and design tools A performance goal is the achievement of a combusted fuel equivalence ratio greater than 0.7 while in scramjet mode. The ground test rig, designated the HIFiRE Direct Connect Rig (HDCR), is a full-scale, heat sink test article that duplicates both the flowpath lines and a majority of the instrumentation layout of the isolator and combustor portion of the flight test hardware. The primary objectives of the HDCR Phase I tests were to verify the operability of the HIFiRE isolator/combustor across the simulated Mach 6-8 flight regime and to establish a fuel distribution schedule to ensure a successful mode transition. Both of these objectives were achieved prior to the HiFIRE Flight 2 payload Critical Design Review. Mach 8 ground test results are presented in this report, including flowpath surface pressure distributions that demonstrate the operation of the flowpath in scramjet-mode over a small range of test conditions around the nominal Mach 8 simulation, as well as over a range of fuel equivalence ratios. Flowpath analysis using ground test data is presented elsewhere; however, limited comparisons with analytical predictions suggest that both scramjet-mode operation and the combustion performance objective are achieved at Mach 8 conditions.

Cabell, Karen↗

Full-Scale Passive Earth Entry Vehicle Landing Tests: Methods and Measurements

During the summer of 2016, a series of drop tests were conducted on two passive earth entry vehicle (EEV) test articles at the Utah Test and Training Range (UTTR). The tests were conducted to evaluate the structural integrity of a realistic EEV vehicle under anticipated landing loads. The test vehicles were lifted to an altitude of approximately 400m via a helicopter and released via release hook into a predesignated 61 m landing zone. Onboard accelerometers were capable of measuring vehicle free flight and impact loads. High-speed cameras on the ground tracked the free-falling vehicles and data was used to calculate critical impact parameters during the final seconds of flight. Additional sets of high definition and ultra-high definition cameras were able to supplement the high-speed data by capturing the release and free flight of the test articles. Three tests were successfully completed and showed that the passive vehicle design was able to withstand the impact loads from nominal and off-nominal impacts at landing velocities of approximately 29 m/s. Two out of three test resulted in off-nominal impacts due to a combination of high winds at altitude and the method used to suspend the vehicle from the helicopter. Both the video and acceleration data captured is examined and discussed. Finally, recommendations for improved release and instrumentation methods are presented.

Littell, Justin D.↗

Shake Test Results and Dynamic Characterization of the Large Rotor Test Apparatus in the NFAC 40- by 80-Foot Wind Tunnel

Prior to the full-scale wind tunnel test of the UH-60A Airloads rotor, a shake test was completed on the Large Rotor Test Apparatus. The goal of the shake test was to characterize the oscillatory response of the test rig and provide a dynamic calibration of the balance to permit accurate measurement of vibratory hub loads. This paper provides a summary of the shake test results, including balance, shaft bending gauge, and accelerometer measurements. Sensitivity to hub mass and angle of attack were investigated during the shake test. Hub mass was found to have an important impact on the vibratory forces and moments measured at the balance, especially near the UH-60A 4/rev frequency. Comparisons were made between the accelerometer data and an existing finite-element model, showing agreement on mode shapes, but not on natural frequencies. The results suggest that the shake test data can be used to correct in-plane loads measurements up to 10 Hz and normal loads up to 30 Hz.

Shake Test↗

Full-scale S-76 rotor performance and loads at low speeds in the NASA Ames 80- by 120-Foot Wind Tunnel

A full-scale helicopter rotor test was conducted in the NASA Ames 80- by 120-Foot Wind Tunnel with a four-bladed S-76 rotor system. Rotor performance and loads data were obtained over a wide range of rotor shaft angles-of-attack and thrust conditions at tunnel speeds ranging from 0 to 100 kt. The primary objectives of this test were (1) to acquire forward flight rotor performance and loads data for comparison with analytical results; (2) to acquire S-76 forward flight rotor performance data in the 80- by 120-Foot Wind Tunnel to compare with existing full-scale 40- by 80-Foot Wind Tunnel test data that were acquired in 1977; (3) to evaluate the acoustic capability of the 80- by 120- Foot Wind Tunnel for acquiring blade vortex interaction (BVI) noise in the low speed range and compare BVI noise with in-flight test data; and (4) to evaluate the capability of the 80- by 120-Foot Wind Tunnel test section as a hover facility. The secondary objectives were (1) to evaluate rotor inflow and wake effects (variations in tunnel speed, shaft angle, and thrust condition) on wind tunnel test section wall and floor pressures; (2) to establish the criteria for the definition of flow breakdown (condition where wall corrections are no longer valid) for this size rotor and wind tunnel cross-sectional area; and (3) to evaluate the wide-field shadowgraph technique for visualizing full-scale rotor wakes. This data base of rotor performance and loads can be used for analytical and experimental comparison studies for full-scale, four-bladed, fully articulated rotor systems. Rotor performance and structural loads data are presented in this report.

Shinoda, Patrick M.↗

Surrogate Assembly 30 cm Drop Test

The 30 cm drop is the remaining NRC normal conditions of transport (NCT) regulatory requirement (10 CFR 71.71) for which there are no data on the actual surrogate fuel. While obtaining data on the actual fuel is not a direct requirement, it provides definitive information which aids in quantifying the risk of fuel breakage resulting from a cask drop from a height of 30 cm or less. The 30 cm drop test with the full-scale surrogate assembly conducted in May 2020 was the last step needed for quantifying the strains on the surrogate assembly rods under NCT. The full-scale surrogate assembly used in the 2020 30 cm drop test was built using a new 17x17 Pressurized Water Reactor (PWR) Westinghouse skeleton filled with the copper rods and 3 zircaloy rods from the full-scale surrogate assembly used in the Multi-Modal Transportation Test (MMTT). Felt pads were attached to the surrogate assembly bottom prior to the 30 cm drop to adequately represent the effects of the impact limiters and the cask. Note that felt "programming material" has been used extensively in past drop tests and is known to be a good material for programming a desired shock pulse. The felt pad configuration was determined during a previous series of tests reported in. The acceleration pulses observed on the surrogate assembly during the test were in good agreement with the expected pulses. This confirmed that during the 30 cm drop the surrogate assembly experienced the same conditions as it would if it was dropped in the cask with the impact limiters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview

The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future. The effort was divided into three areas: Flexible Systems Development (FSD), Mission Advanced Entry Concepts (AEC), and Flight Validation. FSD consists of a Flexible Thermal Protection Systems (FTPS) element, which is investigating high temperature materials, coatings, and additives for use in the bladder, insulator, and heat shield layers; and an Inflatable Structures (IS) element which includes manufacture and testing (laboratory and wind tunnel) of inflatable structures and their associated structural elements. AEC consists of the Mission Applications element developing concepts (including payload interfaces) for missions at multiple destinations for the purpose of demonstrating the benefits and need for the HIAD technology as well as the Next Generation Subsystems element. Ground test development has been pursued in parallel with the Flight Validation IRVE-3 flight test. A larger scale (6m diameter) HIAD inflatable structure was constructed and aerodynamically tested in the National Full-scale Aerodynamics Complex (NFAC) 40ft by 80ft test section along with a duplicate of the IRVE-3 3m article. Both the 6m and 3m articles were tested with instrumented aerodynamic covers which incorporated an array of pressure taps to capture surface pressure distribution to validate Computational Fluid Dynamics (CFD) model predictions of surface pressure distribution. The 3m article also had a duplicate IRVE-3 Thermal Protection System (TPS) to test in addition to testing with the Aerocover configuration. Both the Aerocovers and the TPS were populated with high contrast targets so that photogrammetric solutions of the loaded surface could be created. These solutions both refined the aerodynamic shape for CFD modeling and provided a deformed shape to validate structural Finite Element Analysis (FEA) models. Extensive aerothermal testing has been performed on the TPS candidates. This testing has been conducted in several facilities across the country. The majority of the testing has been conducted in the Boeing Large Core Arc Tunnel (LCAT). HIAD is continuing to mature testing methodology in this facility and is developing new test sample fixtures and control methodologies to improve understanding and quality of the environments to which the samples are subjected. Additional testing has been and continues to be performed in the NASA LaRC 8ft High Temperature Tunnel, where samples up to 2ft by 2ft are being tested over representative underlying structures incorporating construction features such as sewn seams and through-thickness quilting. With the successful completion to the IRVE-3 flight demonstration, mission planning efforts are ramping up on the development of the HIAD Earth Atmospheric Reenty Test (HEART) which will demonstrate a relevant scale vehicle in relevant environments via a large-scale aeroshell (approximately 8.5m) entering at orbital velocity (approximately 7km/sec) with an entry mass on the order of 4MT. Also, the Build to Print (BTP) hardware built as a risk mitigation for the IRVE-3 project to have a "spare" ready to go in the event of a launch vehicle delivery failure is now available for an additional sub-orbital flight experiment. Mission planning is underway to define a mission that can utilize this existing hardware and help the HIAD project further mature this technology.

Hughes, Stephen J.↗

Structural Element Testing in Support of the Design of the NASA Composite Crew Module

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). For the design and manufacturing of the CCM, the team adopted the building block approach where design and manufacturing risks were mitigated through manufacturing trials and structural testing at various levels of complexity. Following NASA's Structural Design Verification Requirements, a further objective was the verification of design analysis methods and the provision of design data for critical structural features. Test articles increasing in complexity from basic material characterization coupons through structural feature elements and large structural components, to full-scale structures were evaluated. This paper discusses only four elements tests three of which include joints and one that includes a tapering honeycomb core detail. For each test series included are specimen details, instrumentation, test results, a brief analysis description, test analysis correlation and conclusions.

Kellas, Sotiris↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

Integrated Heat Exchanger-Phase Change Material Thermal Energy Storage System

The purpose of this study is to experimentally investigate the thermal performance of an innovative thermal energy storage (TES) system that combines the advantages of the phase-change material (PCM)/graphite foam latent heat TES medium developed at Argonne National Laboratory (Argonne) and the internally supported plate-fin (ISPE) cell architecture heat transfer fluid (HTF) flow channels developed at Brayton Energy (Brayton). Several essential tasks were accomplished: (1) Thermal property characterization. Thermal properties of the graphite foam were characterized, providing necessary data for experimental result analysis and numerical simulation. (2) Design and optimization of lab-scale test module. Based on Brayton’s full-scale heat exchanger (HX)-TES system, the experimental test module was designed, optimized, and fabricated. (3) Thermal performance testing and data analysis. Five cycle tests were successfully conducted—including one with approximately 3.5 psig of pressure applied to the diaphragms—to investigate the thermal performance of the experimental test module for charging and discharging. Temperature profiles were generated for each charging test and discharging test as a function of time. The temperature profiles clearly show three TES stages: sensible heat (temperature increase), latent heat (melting), and sensible heat (temperature increase) for the charging process. Similarly, the temperature profiles clearly show three thermal energy release stages: sensible heat (temperature decrease), latent heat (solidification), and sensible heat (temperature decrease). Melting and solidification of the PCM generally occurred in relatively narrow temperature ranges, indicated by the flattened temperature regions in the temperature profiles. These phase changes ranged approximately 3°C for melting and 3.5°C for solidification. The charging and discharging temperature profiles were similar for similar experimental parameter tests whether or not pressure was applied to the diaphragm to eliminate the gap between the HX surface and the TES subsystem. This indicates that the effect of a small gap between the HX surface and the TES subsystem is insignificant for charging and discharging. (4) Comparison of experimental data and simulation results. We compared the experimental data to the numerical simulation results. Numerical simulations were conducted by using the ANSYS FLUENT 2019 R3 commercial computational fluid dynamics software. The predicted phase-change times agreed reasonably well with those from the experimental data. In most cases, the estimated time differences between the relative phase changes were within 16%. The predicted start and end times for the charging process agreed well with those from the experimental data. However, the simulation results showed earlier start and end times than the experimental data for the discharging process. Overall, the experimental data and its comparison with the simulation predictions verified the technical viability of the integrated ISPF HX-PCM/graphite foam latent-heat TES system.

25 ENERGY STORAGE↗

Q-18: Advanced System Development Fact Sheet

Q-18 provides Systems and Design Engineering for Future Weapons Systems and Technology up to Phase 3 or 6.3 with emphasis on improved performance, safety, produceability and agility of the future stockpile. The group regulars engages and partners with DoD customers, NNSA as well as other divisions across the LANL campus including to complete its mission. The group is forward leaning and provides Future System and System Agnostic Design and System Engineering support to a wide range of experiments from internally fielded technology tests to hydrodynamic and subcritical experiments including fabrication for small component level to full scale prototypes and test articles, test article assembly, and mechanical and electrical design.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Of Clouds and Craters: The Incredible Story of U.S. Nuclear Weapons Testing

This report provides brief descriptions of US Nuclear weapons testing between 1945 and 1992. Editor's note: The United States’ last full-scale nuclear weapons test was conducted 30 years ago on Sept. 23, 1992. Divider was a Los Alamos test and took place in Nevada. It was the nation’s 1,054th nuclear test over a 47-year period.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

Reusable Solid Rocket Motor - Accomplishment, Lessons, and a Culture of Success

The Reusable Solid Rocket Motor (RSRM) represents the largest solid rocket motor (SRM) ever flown and the only human-rated solid motor. High reliability of the RSRM has been the result of challenges addressed and lessons learned. Advancements have resulted by applying attention to process control, testing, and postflight through timely and thorough communication in dealing with all issues. A structured and disciplined approach was taken to identify and disposition all concerns. Careful consideration and application of alternate opinions was embraced. Focus was placed on process control, ground test programs, and postflight assessment. Process control is mandatory for an SRM, because an acceptance test of the delivered product is not feasible. The RSRM maintained both full-scale and subscale test articles, which enabled continuous improvement of design and evaluation of process control and material behavior. Additionally RSRM reliability was achieved through attention to detail in post flight assessment to observe any shift in performance. The postflight analysis and inspections provided invaluable reliability data as it enables observation of actual flight performance, most of which would not be available if the motors were not recovered. RSRM reusability offered unique opportunities to learn about the hardware. NASA is moving forward with the Space Launch System that incorporates propulsion systems that takes advantage of the heritage Shuttle and Ares solid motor programs. These unique challenges, features of the RSRM, materials and manufacturing issues, and design improvements will be discussed in the paper.

Moore, D. R.↗

Flow Separation Control on A Full-Scale Vertical Tail Model Using Sweeping Jet Actuators

This paper describes test results of a joint NASA/Boeing research effort to advance Active Flow Control (AFC) technology to enhance aerodynamic efficiency. A full-scale Boeing 757 vertical tail model equipped with sweeping jets AFC was tested at the National Full-Scale Aerodynamics Complex 40- by 80-Foot Wind Tunnel at NASA Ames Research Center. The flow separation control optimization was performed at 100 knots, a maximum rudder deflection of 30deg, and sideslip angles of 0deg and -7.5deg. Greater than 20% increments in side force were achieved at the two sideslip angles with a 31-actuator AFC configuration. Flow physics and flow separation control associated with the AFC are presented in detail. AFC caused significant increases in suction pressure on the actuator side and associated side force enhancement. The momentum coefficient (C sub mu) is shown to be a useful parameter to use for scaling-up sweeping jet AFC from sub-scale tests to full-scale applications. Reducing the number of actuators at a constant total C(sub mu) of approximately 0.5% and tripling the actuator spacing did not significantly affect the flow separation control effectiveness.

Andino, Marlyn Y.↗

An Investigation of the Dragonfly Mission Aeroshell/Parachute Dynamics through Subscale Drop Tests

The Dragonfly mission will place a rotorcraft/lander on Titan by 2034. The entry, descent, and landing system of the Dragonfly mission includes two parachutes: a drogue and a main. To provide needed data, subscale drop tests were used to conduct an experimental investigation of the aeroshell/parachute dynamics. The drop tests used a Disk-Gap-Band drogue parachute and two types of Ringslot main parachutes. All tests used a representative aeroshell which included the heatshield. All models were geometrically scaled to 16.7 percent. The model aeroshell had a diameter of 0.75 m. The model parachute nominal diameters were 0.9 m for the drogue and 2.78 m for the main. The aeroshell’s mass properties were dynamically scaled to simulate flight at an altitude of 4 km at Titan. This dynamic scaling allowed the conversion of model test results to full-scale Titan conditions. Onboard instrumentation on the aeroshell provided data on the rotation rates, from which the Euler angles were determined. Tests were conducted by lifting the models with a drone to an altitude of 350 m and dropping them inverted. Key results from these tests were: 1) the models were able to recover from the extreme inverted initial condition and settle to low-amplitude oscillations; 2) ninety nine percent of the time the oscillation amplitudes observed with the drogue parachute were 11.4 degrees or less; 3) ninety nine percent of the time the oscillation amplitudes observed with the 20 percent porosity main parachute were 15.4 degrees or less.

Parachutes↗

An Investigation of the Dragonfly Mission Aeroshell/Parachute Dynamics through Subscale Drop Tests

The Dragonfly mission will place a rotorcraft/lander on Titan by 2034. The entry, descent, and landing system of the Dragonfly mission includes two parachutes: a drogue and a main. To provide needed data, subscale drop tests were used to conduct an experimental investigation of the aeroshell/parachute dynamics. The drop tests used a Disk-Gap-Band drogue parachute and two types of Ringslot main parachutes. All tests used a representative aeroshell which included the heatshield. All models were geometrically scaled to 16.7 percent. The model aeroshell had a diameter of 0.75 m. The model parachute nominal diameters were 0.9 m for the drogue and 2.78 m for the main. The aeroshell’s mass properties were dynamically scaled to simulate flight at an altitude of 4 km at Titan. This dynamic scaling allowed the conversion of model test results to full-scale Titan conditions. Onboard instrumentation on the aeroshell provided data on the rotation rates, from which the Euler angles were determined. Tests were conducted by lifting the models with a drone to an altitude of 350 m and dropping them inverted. Key results from these tests were: 1) the models were able to recover from the extreme inverted initial condition and settle to low-amplitude oscillations; 2) ninety nine percent of the time the oscillation amplitudes observed with the drogue parachute were 11.4 degrees or less; 3) ninety nine percent of the time the oscillation amplitudes observed with the 20 percent porosity main parachute were 15.4 degrees or less.

Parachutes↗

The LHC magnet system and its status of development

CERN is preparing for the construction of a new high energy accelerator/collider, the Large Hadron Collider (LHC). This new facility will mainly consist of two superconducting magnetic beam channels, 27 km long, to be installed in the existing LEP tunnel. The magnetic system comprises about 1200 twin-aperture dipoles, 13.145 m long, with an operational field of 8.65 T, about 600 quadrupoles, 3 m long, and a very large number of other superconducting magnetic components. A general description of the system is given together with the main features of the design of the regular lattice magnets. The paper also describes the present state of the magnet R & D program. Results from short model work, as well as from full scale prototypes will be presented, including the recently tested 10 m long full-scale prototype dipole manufactured in industry.

Bona, Maurizio↗