Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Dynamics and controls flight testing of the X-29A airplane

A brief description of the flight control system of the X-29A forward-swept-wing flight demonstrator is followed by a discussion of the flight test techniques and procedures in the area of flight dynamics and control. These techniques, which evolved during the initial few months of flight testing, are based on integrating flight testing with simulation and analysis on a flight-by-flight basis. A limited amount of flight test results in dynamic stability and handling qualities is also presented.

Gera, J.↗

Dynamics and controls flight testing of the X-29A airplane

A brief description of the flight control system of the X-29A forward-swept-wing flight demonstrator is followed by a discussion of the flight test techniques and procedures in the area of flight dynamics and control. These techniques, which evolved during the initial few months of flight testing, are based on integrating flight testing with simulation and analysis on a flight-by-flight basis. A limited amount of flight test results in dynamic stability and handling qualities is also presented.

Gera, J.↗

A Thermal Expert System (TEXSYS) development overview - AI-based control of a Space Station prototype thermal bus

A knowledge-based control system for real-time control and fault detection, isolation and recovery (FDIR) of a prototype two-phase Space Station Freedom external thermal control system (TCS) is discussed in this paper. The Thermal Expert System (TEXSYS) has been demonstrated in recent tests to be capable of both fault anticipation and detection and real-time control of the thermal bus. Performance requirements were achieved by using a symbolic control approach, layering model-based expert system software on a conventional numerical data acquisition and control system. The model-based capabilities of TEXSYS were shown to be advantageous during software development and testing. One representative example is given from on-line TCS tests of TEXSYS. The integration and testing of TEXSYS with a live TCS testbed provides some insight on the use of formal software design, development and documentation methodologies to qualify knowledge-based systems for on-line or flight applications.

Glass, B. J.↗

ATLAS Flight Science Receiver Algorithms

This is the basis document for the ATLAS Receiver Algorithms. ATLAS is the single instrument on the ICESat-2 mission. The Receiver (Rx) Algorithms select the signal location in real-time and instruct the hardware to telemeter a vertical band of received time-tags about this signal location. The algorithms are implemented in the Flight Software (FSW) and in the hardware of the Photon Counting Electronics (PCE) cards. The sole purpose of the algorithms is to reduce the telemetry data volume to fit within the downlink constraint while maximizing the probability of downlinking surface signal. All versions of the Receiver Algorithms from version 2.8 onward incorporate our best knowledge of the ATLAS hardware at this time. It presents algorithms that, based on current Simulator testing, satisfy all of the requirements for the Rx Algorithms. Testing during ATLAS Instrument Integration and Testing with the hardware and software implementation of the Rx Algorithms revealed characteristics and responses that required changes to the Rx Algorithms and this document, which are captured in the change record below.All relevant documentation for the Receiver Algorithms can be found on the ICESat-2 Technical Data Management System (TDMS) under the ATLAS Algorithms subsystem.The launch version of the FSW (version 3.1.0) is based upon version 3.7c of this document.

Mcgarry, Jan L.↗

Status of the James Webb Space Telescope Mission

The James Webb Space Telescope ( Webb) is the largest space telescope realized to-date, with a 6.5 m segmented primary mirror that must be folded to fit within its Ariane 5 launcher fairing. This infrared telescope is passively cooled using a five-layer sunshield that will keep the optical telescope and its four science instruments in the shade throughout the lifetime of the mission in an L2 orbit. Webb's science instruments include near- and mid­ infrared imagers and spectrometers that cover the spectral range from 0.6-28.5 µm. The Webb mission has a long history with numerous first of its kind technology developments, ground support equipment innovations, and algorithmic characterization advances. This conference proceeding summarizes the technical progress over the past two years, from the Spacecraft Element environmental testing to the Observatory integration and testing, and the final Observatory test plans leading up to launch, on-orbit commissioning, and science operations.

Michael W McElwain↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

The "Very Cool" James Webb Space Telescope!

For over twenty years, scientists, engineers, technicians, and other personnel have been working on the next generation space telescope. As a partnership between NASA (National Aeronautics and Space Administration), CSA (Canadian Space Agency), and ESA (European Space Angency), the James Webb Space Telescope will complement the previous research performed by the Hubble by utilizing a larger primary mirror, which will also be optimized for infrared wavelengths. This combination will allow JWST to collect data and take images of light having traveled over 13.7 billion light years. This presentation will focus on the mission, as well as the contamination control challenges during the integration and testing in the NASA Goddard Spacecraft Systems Development and Integration Facility (SSDIF), one of the largest cleanrooms in the world. Additional information will be presented regarding space simulation testing down to a cool 20 degrees Kelvin [-424 degrees Fahrenheit] that will occur at Johnson Space Center in Houston, TX, and more testing and integration to happen at Northrop Grumman Corp., in Redondo Beach, CA. Launch of the JWST is currently scheduled for the spring of 2019 at Ariane Spaceport in French Guiana, South America.

space sciences↗

xEMU Thermal Vacuum Testing Overview

The Exploration Extravehicular Mobility Unit (xEMU) project was the culimation of over a decade of spacesuit development that was performed in-house at the NASA Johnson Space Center. This project reached a level where almost fully completed development fidelity spacesuits had been designed, assembled and tested in an integrated configuration. The xEMU Development-Verification-Test (DVT) hardware was assembled into two different xEMU test articles and underwent a series of thermal-vacuum tests at the Johnson Space Center’s Chamber B. These tests not only gathered data on thermal performance, but also exercised the life support system, communication system, suit information systems, and suit avionics. This complex test has and will continue to produce many meaningful reports ranging from component level test results (for example on spacesuit boots), test design of heater cages to simulate thermal environments for a spacesuit test article, and higher level thermal performance of subsystems (such as the Portable Life Support System) or the entire assembly. This paper provides an overview of the test configuration and also top level results from this highly successful integrated test of the xEMU.

PLSS↗

xEMU Thermal Vacuum Testing Overview

The Exploration Extravehicular Mobility Unit (xEMU) project was the culimation of over a decade of spacesuit development that was performed in-house at the NASA Johnson Space Center. This project reached a level where almost fully completed development fidelity spacesuits had been designed, assembled and tested in an integrated configuration. The xEMU Development-Verification-Test (DVT) hardware was assembled into two different xEMU test articles and underwent a series of thermal-vacuum tests at the Johnson Space Center’s Chamber B. These tests not only gathered data on thermal performance, but also exercised the life support system, communication system, suit information systems, and suit avionics. This complex test has and will continue to produce many meaningful reports ranging from component level test results (for example on spacesuit boots), test design of heater cages to simulate thermal environments for a spacesuit test article, and higher level thermal performance of subsystems (such as the Portable Life Support System) or the entire assembly. This paper provides an overview of the test configuration and also top level results from this highly successful integrated test of the xEMU.

PLSS↗

VLSI-Chip Tester

Compact test set integrated in computer-aided design system. Test set performs functional tests on very-large-scale integrated (VLSI) circuits. Makes tests from points within VLSI chip as well as at input and output pins. Used for quality control and design; in latter capacity, checks internal logic functions on chip and feed results directly to computer-aided design system for correction. Also simulates operation of chip design before chip is made. VLSI Tester contains three power supplies, control logic, and standard multibus circuit board in aluminum chassis. Chassis fits under platform of microprobe station. Multibus board links tester to interactive terminals and to host computer.

Deutsch, Leslie J.↗

Capturing flight system test engineering expertise: Lessons learned

Within a few years, JPL will be challenged by the most active mission set in history. Concurrently, flight systems are increasingly more complex. Presently, the knowledge to conduct integration and test of spacecraft and large instruments is held by a few key people, each with many years of experience. JPL is in danger of losing a significant amount of this critical expertise, through retirement, during a period when demand for this expertise is rapidly increasing. The most critical issue at hand is to collect and retain this expertise and develop tools that would ensure the ability to successfully perform the integration and test of future spacecraft and large instruments. The proposed solution was to capture and codity a subset of existing knowledge, and to utilize this captured expertise in knowledge-based systems. First year results and activities planned for the second year of this on-going effort are described. Topics discussed include lessons learned in knowledge acquisition and elicitation techniques, life-cycle paradigms, and rapid prototyping of a knowledge-based advisor (Spacecraft Test Assistant) and a hypermedia browser (Test Engineering Browser). The prototype Spacecraft Test Assistant supports a subset of integration and test activities for flight systems. Browser is a hypermedia tool that allows users easy perusal of spacecraft test topics. A knowledge acquisition tool called ConceptFinder which was developed to search through large volumes of data for related concepts is also described and is modified to semi-automate the process of creating hypertext links.

Woerner, Irene Wong↗

Semantic integration of clinical laboratory tests from electronic health records for deep phenotyping and biomarker discovery

Electronic Health Record (EHR) systems typically define laboratory test results using the Laboratory Observation Identifier Names and Codes (LOINC) and can transmit them using Fast Healthcare Interoperability Resource (FHIR) standards. LOINC has not yet been semantically integrated with computational resources for phenotype analysis. Here, we provide a method for mapping LOINC-encoded laboratory test results transmitted in FHIR standards to Human Phenotype Ontology (HPO) terms. We annotated the medical implications of 2923 commonly used laboratory tests with HPO terms. Using these annotations, our software assesses laboratory test results and converts each result into an HPO term. We validated our approach with EHR data from 15,681 patients with respiratory complaints and identified known biomarkers for asthma. Finally, we provide a freely available SMART on FHIR application that can be used within EHR systems. Our approach allows readily available laboratory tests in EHR to be reused for deep phenotyping and exploits the hierarchical structure of HPO to integrate distinct tests that have comparable medical interpretations for association studies.

60 APPLIED LIFE SCIENCES↗

RESOLVE Project

The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis conducted include: pneumatic analysis to calculate the WDD's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. Since LAVA is a scientific subsystem, the near-infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.

Parker, Ray↗

Extended life testing evaluation of complementary MOS integrated circuits

The purpose of the extended life testing evaluation of complementary MOS integrated circuits was twofold: (1) To ascertain the long life capability of complementary MOS devices. (2) To assess the objectivity and reliability of various accelerated life test methods as an indication or prediction tool. In addition, the determination of a suitable life test sequence for these devices was of importance. Conclusions reached based on the parts tested and the test results obtained was that the devices were not acceptable.

Brosnan, T. E.↗

Determining failure properties of as-received and hydrided unirradiated Zircaloy-4 from ring compression tests

An integrated experimental and computational approach was developed to determine the plastic strain at fracture and to investigate the fracture energy of as-received and hydrided unirradiated Zircaloy-4 nuclear cladding tubes in the hoop direction at room temperature from ring compression testing (RCT). This work builds on previous methods in the literature that were developed to obtain the mechanical properties of nuclear cladding before fracture (Young’s modulus, yield stress, and strain-hardening parameters) from experimental RCT results and extends the characterization of this material class to include material failure properties. Furthermore, a ductile damage approach was developed and implemented in a validated finite element model to predict material failure, evaluate fracture energy, and quantify the plastic strain at fracture initiation. The hydrogen content of the Zircaloy-4 specimens was varied up to 610 wppm when the failure became brittle. As expected, increasing hydrogen content caused embrittlement of the Zircaloy-4 samples tested and the plastic strain at fracture and fracture energy to decrease.

36 MATERIALS SCIENCE↗

Mariner Mars 1971 battery design, test, and flight performance

The design, integration, fabrication, test results, and flight performance of the battery system for the Mariner Mars spacecraft launched in May 1971 are presented. The battery consists of 26 20-Ah hermetically sealed nickel-cadmium cells housed in a machined magnesium chassis. The battery package weighs 29.5 kg and is unique in that the chassis also serves as part of the spacecraft structure. Active thermal control is accomplished by louvers mounted to the battery baseplate. Battery charge is accomplished by C/10 and C/30 constant current chargers. The switch from the high-rate to low-rate charge is automatic, based on terminal voltage. Additional control is possible by ground command or onboard computer. The performance data from the flight battery is compared to the data from various battery tests in the laboratory. Flight battery data was predictable based on ground test data.

Bogner, R. S.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Structural testing of the technology integration box beam

A full scale section of a transport aircraft wing box was designed, analyzed, fabricated, and tested. The wing box section, which was called the technology integration box beam, contained blade stiffened covers and T-stiffened channel spars constructed using graphite-epoxy materials. Covers, spars, and the aluminum ribs were assembled using mechanical fasteners. The box beam was statically tested for several loading conditions to verify the stiffness and strength characteristics of the composite wing design. Failure of the box beam occurred at 125 pct. of design limit load during the combined unbending and torsion ultimate design load test. It appears that the failure initiated at a stiffener runout location in the upper cover which resulted in rupture of the upper cover and portions of both spars.

Griffin, C. F.↗