Search NASA⌕ Search

SEARCH · Search NASA

Results for “network scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Verification and validation of developed short-term forecasting models

Recent advancements in machine learning (ML) and artificial intelligence (AI) technologies provide an opportunity for leveraging data-driven algorithms to predict future nuclear power plant (NPP) operating conditions by using recorded plant process data. Successfully implementing these models can lead to cost-reducing, conditioned-based predictive maintenance through optimized maintenance schedules and a reduction of unnecessary maintenance activities. This report discusses the verification and validation of short-term forecasting processes (i.e., data cleaning, feature selection, model optimization, and forecasting) developed in previous reports. The verification and validation (V&V) process demonstrates the expected precision and accuracy when the ML model encounters new datasets from different systems. Shapley additive explanations were used as the primary means of feature selection across these different data set. Individual models were trained for each data set, then validated through a cross-validation procedure. In this report, two different ML models were tasked to predict variables from three different plant process data sets with varying prediction horizons. The results indicate that support vector regression (SVR) outperformed long short-term memory (LSTM) neural networks in regard to each data set and each prediction horizon in this study, but further tuning and optimization could improve long short-term memory results. However, each forecasting model showed reduced performance as the prediction horizon was extended from 1 hour to 1 day ahead. Research is ongoing to evaluate the optimal input variable space, which is based on a given set of process parameters, to further improve forecasting accuracy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance Prediction of Big Data Transfer Through Experimental Analysis and Machine Learning

Big data transfer in next-generation scientific ap- plications is now commonly carried out over connections with guaranteed bandwidth provisioned in High-performance Net- works (HPNs) through advance bandwidth reservation. To use HPN resources efficiently, provisioning agents need to carefully schedule data transfer requests and allocate appropriate band- widths. Such reserved bandwidths, if not fully utilized by the requesting user, could be simply wasted or cause extra overhead and complexity in management due to exclusive access. This calls for the capability of performance prediction to reserve bandwidth resources that match actual needs. Towards this goal, we employ machine learning algorithms to predict big data transfer perfor- mance based on extensive performance measurements, which are collected over a span of several years from a large number of data transfer tests using different protocols and toolkits between various end sites on several real-life physical or emulated HPN testbeds. We first identify a comprehensive list of attributes involved in a typical big data transfer process, including end host system configurations, network connection properties, and control parameters of data transfer methods. We then conduct an in-depth exploratory analysis of their impacts on application- level throughput, which provides insights into big data transfer performance and motivates the use of machine learning. We also investigate the applicability of machine learning algorithms and derive their general performance bounds for performance prediction of big data transfer in HPNs. Experimental results show that, with appropriate data preprocessing, the proposed machine learning-based approach achieves 95% or higher pre- diction accuracy in up to 90% of the cases with very noisy real-life performance measurements.

Yun, Daqing↗

Orbit Determination of Spacecraft in Earth-Moon L1 and L2 Libration Point Orbits

The ARTEMIS mission, part of the THEMIS extended mission, is the first to fly spacecraft in the Earth-Moon Lissajous regions. In 2009, two of the five THEMIS spacecraft were redeployed from Earth-centered orbits to arrive in Earth-Moon Lissajous orbits in late 2010. Starting in August 2010, the ARTEMIS P1 spacecraft executed numerous stationkeeping maneuvers, initially maintaining a lunar L2 Lissajous orbit before transitioning into a lunar L1 orbit. The ARTEMIS P2 spacecraft entered a L1 Lissajous orbit in October 2010. In April 2011, both ARTEMIS spacecraft will suspend Lissajous stationkeeping and will be maneuvered into lunar orbits. The success of the ARTEMIS mission has allowed the science team to gather unprecedented magnetospheric measurements in the lunar Lissajous regions. In order to effectively perform lunar Lissajous stationkeeping maneuvers, the ARTEMIS operations team has provided orbit determination solutions with typical accuracies on the order of 0.1 km in position and 0.1 cm/s in velocity. The ARTEMIS team utilizes the Goddard Trajectory Determination System (GTDS), using a batch least squares method, to process range and Doppler tracking measurements from the NASA Deep Space Network (DSN), Berkeley Ground Station (BGS), Merritt Island (MILA) station, and United Space Network (USN). The team has also investigated processing of the same tracking data measurements using the Orbit Determination Tool Kit (ODTK) software, which uses an extended Kalman filter and recursive smoother to estimate the orbit. The orbit determination results from each of these methods will be presented and we will discuss the advantages and disadvantages associated with using each method in the lunar Lissajous regions. Orbit determination accuracy is dependent on both the quality and quantity of tracking measurements, fidelity of the orbit force models, and the estimation techniques used. Prior to Lissajous operations, the team determined the appropriate quantity of tracking measurements that would be needed to meet the required orbit determination accuracies. Analysts used the Orbit Determination Error Analysis System (ODEAS) to perform covariance analyses using various tracking data schedules. From this analysis, it was determined that 3.5 hours of DSN TRK-2-34 range and Doppler tracking data every other day would suffice to meet the predictive orbit knowledge accuracies in the Lissajous region. The results of this analysis are presented. Both GTDS and ODTK have high-fidelity environmental orbit force models that allow for very accurate orbit estimation in the lunar Lissajous regime. These models include solar radiation pressure, Earth and Moon gravity models, third body gravitational effects from the Sun, and to a lesser extent third body gravitational effects from Jupiter, Venus, Saturn, and Mars. Increased position and velocity uncertainties following each maneuver, due to small execution performance errors, requires that several days of post-maneuver tracking data be processed to converge on an accurate post-maneuver orbit solution. The effects of maneuvers on orbit determination accuracy will be presented, including a comparison of the batch least squares technique to the extended Kalman filter/smoother technique. We will present the maneuver calibration results derived from processing post-maneuver tracking data. A dominant error in the orbit estimation process is the uncertainty in solar radiation pressure and the resultant force on the spacecraft. An estimation of this value can include many related factors, such as the uncertainty in spacecraft reflectivity and surface area which is a function of spacecraft orientation (spin-axis attitude), uncertainty in spacecraft wet mass, and potential seasonal variability due to the changing direction of the Sun line relative to the Earth-Moon Lissajous reference frame. In addition, each spacecraft occasionally enters into Earth or Moon penumbra or umbra and these shadow crossings reduche solar radiation force for several hours. The effects of these events on orbit determination accuracy will be presented. In order to plan for upcoming stationkeeping maneuvers, the maneuver planning team must take the current orbit estimate, propagate it forward to the planned maneuver time, and determine the optimal maneuver to maintain the Lissajous orbit for one or more revolutions. The propagation is performed using a Runge-Kutta 7/8 integrator and typically the position and velocity uncertainty increases with propagation time, increasing the overall uncertainty of the orbit state at the maneuver execution time. The effect of orbit knowledge uncertainty on stationkeeping operations will be presented.

Woodard, Mark↗

An Agile-Like Approach to Hardware Development: The Ejectable Data Recorder (EDR) for Orion's Ascent Abort 2 (AA-2) Test Flight

On July 2, 2019, the Ascent Abort 2 (AA-2) Flight Test Vehicle was launched from Cape Canaveral, with the goal of demonstrating the performance of Orion’s Launch Abort System (LAS) and collecting data from hundreds of sensors throughout the vehicle. The data collected during this test flight is of paramount importance, as it will be used to certify the Orion vehicle for human spaceflight. Originally, the data was to be downlinked via a single string network of antennas on the LAS, with the associated risk of potential data dropouts, as well as loss of data once the LAS was jettisoned. Thus, additional antennas were added onto the crew module (CM) to support data downlink post-LAS jettison, a buffer rebroadcast capability was added to fill in any gaps in data downlink transmissions, and an ejectable data recorder (EDR) subsystem was added to the CM as a redundant measure to collect all the instrumentation data. The EDR subsystem was added to the project about one year after the project commenced, which significantly reduced the available development time when compared with the other subsystems of the AA-2 Test Flight. The project was further accelerated by six months, around the critical design review gate. Due to the schedule compression challenge and the fact that the EDR subsystem was a backup system and not flight critical, the EDR subsystem was further challenged to find a new and more efficient way to develop hardware. Thus, the EDR subsystem experimented with different management and systems engineering processes, team sizes, communication methods, and tools. Some examples are novel uses of SharePoint as a Data-centric Project Management & Systems Engineering environment, a continuous testing approach through the lifecycle, and a Skunkworks approach to managing the team. The EDR subsystem blended Commercial Off The Shelf (COTS) hardware with in-house developed hardware and software to create a novel data retrieval capability. The capability evolved rapidly through a hardware in the loop simulation environment that enabled incremental component updates for not only the EDR subsystem but across the entire Crew Module. This paper will present an overview of how the EDR subsystem was managed and compare it to an Agile approach to managing projects. The paper will further provide a recommended approach to future Agile-like hardware development that incorporates lessons learned from the EDR experience.

Agile↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

LANL Meteorological Program: 2020 Data Completeness/Quality Report

Los Alamos National Laboratory (LANL) operates four mesa-top meteorology towers: Technical Area (TA) 06, TA-49, TA-53, and TA-54. An additional tower is located in Mortandad Canyon (TA-5 MDCN), and a rain gauge at North Community (NCOM). A description of the meteorology monitoring network is found in Dewart and Boggs (2014). Mesa-top towers are instrumented at 1.2 meters (m), 11.5 m, 23 m, and 46 m. In addition, TA-06 is instrumented at 92 m. The TA-5 MDCN tower is 10 m in height and is instrumented at 1.2 m and 10 m. Data are collected every 15 minutes. Range checking is done on each measurement every 15 minutes; data that are beyond normal ranges are eliminated from the data set and replaced by a code for missing data. In addition, data are reviewed weekly by meteorologists to identify bad data not identified by range checking. The data steward eliminates these data from the data set and replaces them with a code for missing data. The instrument technicians also review that data and schedule instrument replacement as required. Data completeness is determined by the number of total 15-minute records available versus the total number of possible measurements for the entire year. As a rule, the meteorologists do not attempt to estimate data that are eliminated as bad data. Original datalogger records, containing bad data, can be recalled from program archival storage.

54 ENVIRONMENTAL SCIENCES↗

Langston University - High Energy Physics (LU-HEP)

This final report is presented by Langston University (LU) for the project entitled "Langston University High Energy Physics" (LUHEP) under the direction of principal investigator (PI) and project director Professor Joel Snow. The project encompassed high energy physics research performed at hadron colliders. The PI is a collaborator on the DZero experiment at Fermi National Accelerator Laboratory in Batavia, IL, USA and the ATLAS experiment at CERN in Geneva, Switzerland and was during the entire project period from April 1, 1999 until May 14, 2012. Both experiments seek to understand the fundamental constituents of the physical universe and the forces that govern their interactions. In 1999 as member of the Online Systems group for Run 2 the PI developed a cross-platform Python-based, Graphical User Interface (GUI) application for monitoring and control of EPICS based devices for control room use. This served as a model for other developers to enhance and build on for further monitoring and control tasks written in Python. Subsequently the PI created and developed a cross-platform C++ GUI utilizing a networked client-server paradigm and based on ROOT, the object oriented analysis framework from CERN. The GUI served as a user interface to the Examine tasks running in the D\O\ control room which monitored the status and integrity of data taking for Run 2. The PI developed the histogram server/control interface to the GUI client for the EXAMINE processes. The histogram server was built from the ROOT framework and was integrated into the D\O\ framework used for online monitoring programs and offline analysis. The PI developed the first implementation of displaying histograms dynamically generated by ROOT in a Web Browser. The PI's work resulted in several talks and papers at international conferences and workshops. The PI established computing software infrastructure at LU and U. Oklahoma (OU) to do analysis of DZero production data and produce simulation data for the experiment. Eventually this included the FNAL SAM data grid system, the SAMGrid (SG) infrastructure, and the Open Science Grid software stacks for computing and storage elements. At the end of 2003 Snow took on the role of global Monte Carlo production coordinator for the DØ experiment. A role which continues til this day. In January of 2004 Snow started working with the SAMGrid development team to help debug, deploy, and integrate SAMGrid with DØ Monte Carlo production. Snow installed and configured SG execution and client sites at LUHEP and OUHEP, and a SG scheduler site at LUHEP. The PI developed a python based GUI (DAJ) that acts as a front end for job submission to SAMGrid. The GUI interfaces to the DZero Mone Carlo (MC) request system that uses SAM to manage MC requests by the physics analysis groups. DAJ significantly simplified SG job submission and was deployed in DZero in an effort to increase the user base of SG. The following year was the advent of SAMGrid job submission to the Open Science Grid (OSG) and LHC Computing Grid (LCG) through a forwarding mechanism. The PI oversaw the integration of these grids into the existing production infrastructure. The PI developed an automatic MC (Automc) request processing system capable of operating without user intervention (other than getting grid credentials), and able to submit to any number of sites on various grids. The system manages production at all but 2 sites. The system was deployed at Fermilab and remains operating there today. The PI's work in distributed computing resulted in several talks at international conferences. UTA, OU, and LU were chosen as the collaborating institutions that form the Southwest Tier 2 Center (SWT2) for ATLAS. During the project period the PI contributed to the online and offline software infrastructure through his work with the Run 2 online group, and played a major role in Monte Carlo production for DZero. During the part of the project period in which the PI served as MC production coordinator MC production increased very significantly. In the first year of the PI's tenure as production coordinator production was 159M events and 6.7~TB of data. During the last year of the project period production was 2,342~M events and 262~TB of data. That is a factor of 15 increase in events and 39 in data volume. The increase occurred with improvements in computer hardware and networks, through the use of grid technology on diverse resources, and through increased automation and efficiency of the production process. LU HEP developed and deployed the automatic MC request processing system in use at FNAL. The complementary strategies of automation and grid production served DZero well. Fermilab has recognized LU HEP's contribution to DZero by allowing the PI to devote full time to research activities by appointing him a guest scientist for the last six years of the project period.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2011

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2011 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2011 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2011 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2011 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2011) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

Interfacing with USSTRATCOM and UTTR during Stardust Earth Return

The Stardust Sample Return Capsule separated from the main spacecraft four hours prior to atmospheric entry. Between this time and the time at which the SRC touched down at the Utah Test and Training Range, two organizations external to JPL were involved in tracking the Sample Return Capsule. Orbit determination for the Stardust spacecraft during deep space cruise, the encounters of asteroid Annefrank and comet Wild 2, and the final approach to Earth used X-band radio metric Doppler and range data obtained through the Deep Space Network. The SRC lacked the electronics needed for coherently transponded radio metric tracking, so the DSN was not able to track the SRC after it separated from the main spacecraft. Although the expected delivery accuracy at atmospheric entry was well within the capability needed to target the SRC to the desired ground location, it was still desirable to obtain direct knowledge of the SRC trajectory in case of anomalies. For this reason U.S. Strategic Command was engaged to track the SRC between separation and atmospheric entry. Once the SRC entered the atmosphere, ground sensors at UTTR were tasked to acquire the descending SRC and maintain track during the descent in order to determine the landing location, to which the ground recovery team was then directed. This paper discusses organizational interfaces, data products, and delivery schedules, and the actual tracking operations are described.

Utah Test and Training Range (UTTR)↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2012

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2012 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2012 is in accordance with the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2012 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2012 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2012) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

Ground-based intercomparisons of SBUV/2 flight instruments the world standard Dobson spectrophotometer 83 and overpass observations from Nimbus-7 TOMS and NOAA-11 SBUV/2

Total ozone data obtained during summers at Mauna Loa Observatory, Hawaii, with Dobson Spectrophotometer 83 are routinely compared with overpass total ozone data from the Total Ozone Mapping Spectrometer (TOMS) and the Solar Backscatter Ultraviolet (SBUV) spectrometer launched aboard the Nimbus 7 satellite in 1978. Results from the TOMS/Dobson instrument comparisons through 1990 have been presented by McPeters and Komhyr (1991). Dobson spectrophotometer 83 was established as the standard instrument for the U.S.A. Dobson instrument station network in 1962. In 1980, the instrument was designated by the World Meteorological Organization (WMO) as the Standard Dobson Spectrophotometer for the World. Long-term ozone measurement precision of the instrument has been maintained at plus or minus 0.5 percent (Komhyr et al., 1989). On an absolute scale, the ozone measurement accuracy of the instrument is estimated to plus or minus 3 percent. In early April, 1990, comparison of total ozone and vertical distribution (Umkehr) observations were made for the first time with Dobson spectrophotometer 8.3. The work was conducted at the NOAA Climate Monitoring and Diagnostics Laboratory (CMDL) in Boulder, Colorado, and at the research and instrument manufacturing facility of the Ball Aerospace System Division located about 2 km east of Boulder. (The SBUV-2 S/N-2 instrument, built by Ball Aerospace Systems Division, is scheduled for launch aboard the NOAA-13 satellite). We present results of the comparisons which include ozone vertical distribution data obtained with a balloon-borne electrochemical concentration cell (ECC) ozonesonde (Komhyr, 1969).

Heath, D. F.↗

Systems Architecture for Fully Autonomous Space Missions

The NASA Goddard Space Flight Center is working to develop a revolutionary new system architecture concept in support of fully autonomous missions. As part of GSFC's contribution to the New Millenium Program (NMP) Space Technology 7 Autonomy and on-Board Processing (ST7-A) Concept Definition Study, the system incorporates the latest commercial Internet and software development ideas and extends them into NASA ground and space segment architectures. The unique challenges facing the exploration of remote and inaccessible locales and the need to incorporate corresponding autonomy technologies within reasonable cost necessitate the re-thinking of traditional mission architectures. A measure of the resiliency of this architecture in its application to a broad range of future autonomy missions will depend on its effectiveness in leveraging from commercial tools developed for the personal computer and Internet markets. Specialized test stations and supporting software come to past as spacecraft take advantage of the extensive tools and research investments of billion-dollar commercial ventures. The projected improvements of the Internet and supporting infrastructure go hand-in-hand with market pressures that provide continuity in research. By taking advantage of consumer-oriented methods and processes, space-flight missions will continue to leverage on investments tailored to provide better services at reduced cost. The application of ground and space segment architectures each based on Local Area Networks (LAN), the use of personal computer-based operating systems, and the execution of activities and operations through a Wide Area Network (Internet) enable a revolution in spacecraft mission formulation, implementation, and flight operations. Hardware and software design, development, integration, test, and flight operations are all tied-in closely to a common thread that enables the smooth transitioning between program phases. The application of commercial software development techniques lays the foundation for delivery of product-oriented flight software modules and models. Software can then be readily applied to support the on-board autonomy required for mission self-management. An on-board intelligent system, based on advanced scripting languages, facilitates the mission autonomy required to offload ground system resources, and enables the spacecraft to manage itself safely through an efficient and effective process of reactive planning, science data acquisition, synthesis, and transmission to the ground. Autonomous ground systems in turn coordinate and support schedule contact times with the spacecraft. Specific autonomy software modules on-board include mission and science planners, instrument and subsystem control, and fault tolerance response software, all residing within a distributed computing environment supported through the flight LAN. Autonomy also requires the minimization of human intervention between users on the ground and the spacecraft, and hence calls for the elimination of the traditional operations control center as a funnel for data manipulation. Basic goal-oriented commands are sent directly from the user to the spacecraft through a distributed internet-based payload operations "center". The ensuing architecture calls for the use of spacecraft as point extensions on the Internet. This paper will detail the system architecture implementation chosen to enable cost-effective autonomous missions with applicability to a broad range of conditions. It will define the structure needed for implementation of such missions, including software and hardware infrastructures. The overall architecture is then laid out as a common thread in the mission life cycle from formulation through implementation and flight operations.

Esper, Jamie↗

mdtmFTP and its evaluation on ESNET SDN testbed

In this paper, to address the high-performance challenges of data transfer in the big data era, we are developing and implementing mdtmFTP: a high-performance data transfer tool for big data. mdtmFTP has four salient features. First, it adopts an I/O centric architecture to execute data transfer tasks. Second, it more efficiently utilizes the underlying multicore platform through optimized thread scheduling. Third, it implements a large virtual file mechanism to address the lots-of-small-files (LOSF) problem. In conclusion, mdtmFTP integrates multiple optimization mechanisms, including–zero copy, asynchronous I/O, pipelining, batch processing, and pre-allocated buffer pools–to enhance performance. mdtmFTP has been extensively tested and evaluated within the ESNET 100G testbed. Evaluations show that mdtmFTP can achieve higher performance than existing data transfer tools, such as GridFTP, FDT, and BBCP.

97 MATHEMATICS AND COMPUTING↗

Cognitive Engine One: A Cross-Layer Framework for Autonomy in Multi-Provider Space Communications Environments

Spacecraft information needs, along with the communications environments in which data transfers occur, are becoming increasingly dynamic. Earth orbit is served by dozens of ground station and relay satellite providers – each with unique protocols and service capabilities. In this context, we present a system to automate end-to-end space communications across the protocol stack for each of several providers. The proposed system schedules contacts with providers, configures point-to-point RF links, and ensures data is transferred to its destination. Data monitoring and rescheduling provide an automated failover capability in the event of unsuccessful contacts. We verify system performance in a high-fidelity emulation testbed. Results from several scenarios demonstrate favorable system performance across a variety of mission use cases.

space communications↗

Possibilities For The LAGUNA Projects At The Frejus Site

The present laboratory (LSM) at the Frejus site and the project of a first extension of it, mainly aimed at the next generation of dark matter and double beta decay experiments, are briefly reviewed. Then the main characteristics of the LAGUNA cooperation and Design Study network are summarized. Seven underground sites in Europe are considered in LAGUNA and are under study as candidates for the installation of Megaton scale detectors using three different techniques: a liquid Argon TPC (GLACIER), a liquid scintillator detector (LENA) and a Water Cerenkov (MEMPHYS), all mainly aimed at investigation of proton decay and properties of neutrinos from SuperNovae and other astrophysical sources as well as from accelerators (Super-beams and/or Beta-beams from CERN). One of the seven sites is located at Frejus, near the present LSM laboratory, and the results of its feasibility study are presented and discussed. Then the physics potential of a MEMPHYS detector installed in this site are emphasized both for non-accelerator and for neutrino beam based configurations. The MEMPHYNO prototype with its R and D programme is presented. Finally a possible schedule is sketched.

79 ASTRONOMY AND ASTROPHYSICS↗

Low-Earth-Orbiter resource allocation and capacity planning for the DSN using LEO4CAST

The Deep Space Network provides tracking and communication services for a number of U.S. and international low-Earth-orbiting (LEO) and near-Earth missions. This service is supplied by the 26-m subnet (located at each of the DSN complexes), the 9-m and the 34-m Antenna Research System antennas at Goldstone, and the 11-m antennas (following the orbital VLBI mission). An increasing number of LEO missions are planned for DSN support, which will result in increasingly complex ground resource allocation and mission support trades. To support TDA decision making on mission support and cost-effective ground system evolution for this 26-m subnet, LEO4CAST has been developed. LEO4CAST is a tool that uses statistical approaches to provide useful information for long-term ground system capacity planning and near-term resource allocation (prior to detailed time-of-day scheduling). LEO4CAST is currently beta-test software and is being exercised by both the Office of Telecommunications and Data Acquisition (TDA) and the JPL Systems Division.

Fox, G.↗