SEARCH · Search NASA
Results for “synchronization”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Virtual Time III: Unification Of Conservative And Optimistic Synchronization In Parallel Discrete Event Simulation
Abstract not provided
On the synchronicity of flash sintering and phase transformation
There is growing evidence that oxides of complex chemistries can be formed in one step by reactive flash sintering of their elemental constituents. We explore the temporal relationship between phase transformation and sintering by combining measurements of sintering with in situ measurements of phase transformation. The experiments are carried out under current rate, where flash is induced by injecting current and increasing it at a constant rate. We show that phase transformation of powders of magnesia and α-alumina into single-phase magnesium aluminate spinel was completed in 45 seconds, whereas sintering to full density required 60 seconds.
Low-synchronization orthogonalization schemes for s-step and pipelined Krylov solvers in Trilinos.
Abstract not provided.
Performance of Low Synchronization Orthogonalization Methods in Anderson Accelerated Fixed Point Solvers
Explore the source record for details and available documents.
Synchronization of Kuramoto Oscillators: Inverse Taylor Expansions
Not provided.
How I Learned to Stop Worrying and Love In Situ Analytics: Leveraging Latent Synchronization in MPI Collective Algorithms.
Abstract not provided.
Ultra-precise timing and synchronization for large-scale scientific instruments
Not Available
UNH TDP - Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time frame. The priority for this measurement campaign was to collect data while the turbine was electrically connected to the grid by means of a rectifier and inverter. The Fall_2021_UNH_Measurement_Timeline.png highlights when each instrument was functioning and the Fall_2021_UNH_Test_Log.jpg indicates the four main regions for analysis available from this measurement campaign. The TDP is a floating structure moored on the Portsmouth facing side of Memorial Bridge pier #2, which spans the Piscataqua River between Portsmouth, NH and Kittery, ME. The Piscataqua River connects the Great Bay Estuary to the Gulf of Maine and the river currents are dominated by tidal forcing with water velocities exceeding 2.5 m/s during spring ebb tides at this site which were previously characterized by Kaelin Chancey (Assessment Of The Localized Flow And Tidal Energy Conversion System At An Estuarine Bridge - UNH MS Thesis 2019). The turbine under test was a modified New Energy Corporation (Calgary, CA) model EVG-025 4-blade H-Darrius type vertical axis cross flow turbine that rotates in the clockwise direction with a rotor diameter of 3.2m and blade length of 1.7m. The hydro-foil profile was a NACA 0021 with a 10 inch chord length and a blade preset pitch angle of +4deg with a positive angle corresponding with the toe in direction. The standard EVG-025 has a rotor diameter of 3.4m and its rated power output is 25kW at 3 m/s. The rotor diameter was reduced to accommodate the size of the existing TDP moon-pool. This project was pursued to quantify device performance for cross flow turbines operating in a marine environment. Accurate physical models, to characterize cross flow turbine performance, require real operational data sets due to the complexity of blade fluid interactions. This data can help support model development which will help predict turbine performance when analyzing perspective project locations in the future. Instrumentation was deployed to measure; water speed/direction, electrical power output, turbine shaft speed, turbine thrust force, and platform motion. Concurrent measurements of these parameters allow for correlations (cause and affect) to be inferred, allowing for characterization of device performance over a range of operating conditions. Water currents were measured using Acoustic Doppler Current Profilers (ADCP's) and Acoustic Doppler Velocimeters (ADV's) directly upstream and downstream of the turbine for inflow, wake and turbulence measurements. Electrical power output was measured using the Voltsys rectifier and the Shark power meter. Shaft speed was calculated based on the Voltsys measurements of the permanent magnet three phase generator AC generation frequency, coupled directly to the cross flow turbine under test (i.e., no gear box). Platform motions were captured using a Yost IMU (inertial measurement unit). Turbine thrust loading was measured using a reaction arm about the turbine deployment platform spanning beam, where two bi-directional load cells were connected to the system via a pinned connection. This submission includes zipped folders for each instrument containing quality controlled (QC'd) data in daily .csv files for the relevant duration specific to each instrument, along with separate .csv file that contains the units for each variable. Some instrument daily files are quite large and can pose a challenge for a visual spreadsheet editor to open. A processing software like MATLAB or Python is recommended. Note the degree of QC varied between each instrument due to time constraints. Particular time and attention was given to perform quality control tests on the acoustic based instruments that are particularly suscep...
Synchronization and phase locking of resonant magnet power supplies for Mu2e experiment at Fermilab
The Mu2e Experiment has stringent beam structure requirements; namely, it requires short (~200 ns) proton bunches separated by 1.5-2.0 $\mu$s. This beam structure will be produced using the Fermilab 8 GeV Booster, the 8 GeV Recycler Ring, and the Delivery Ring, which was formerly part of the antiproton accumulator system. Out of time beam is limited to a fraction of level of no more than $1\times 10^{-10}$, a requirement known as "extinction". Achieving this level of extinction requires a system of resonant magnets and collimators, phased such that only in time particles will pass through. The Mu2e magnet system involves two components: a 300 kHz component, timed such that the 600 kHz beam will pass through the collimators at the nodes, and a 4.5 MHz system to reduce the slewing of the in-time beam. These two systems must be precisely phase locked to the bunch rate coming from the Delivery Ring, which itself must be phased to match beam transfers coming from the Recycler. This poster describes the control system for the magnets, which is based on an Intel Arria FPGA, which handles phase locking of the magnets to the Delivery Ring, including the phase jumps required to match transfers from the Recycler.
Slycat Enables Synchronized 3D Comparison of Surface Mesh Ensembles [Brief]
In support of analyst requests for Mobile Guardian Transport studies, researchers at Sandia National Laboratories have expanded data types for the Slycat ensemble-analysis and visualization tool to include 3D surface meshes. This new capability represents a significant advance in our ability to perform detailed comparative analysis of simulation results. Analyzing mesh data rather than images provides greater flexibility for post-processing exploratory analysis.
Ensuring Timing from Nodal and Network Seismic Systems is Synchronized
Poster to be presented by Cleat Zeiler at the annual meeting of the Seismological Society of America, to be held 19-23 April 2022, in Bellevue, WA. See https://meetings.seismosoc.org/
Synchronous High-Frequency Distributed Readout for Edge Processing at the Fermilab Main Injector and Recycler [Poster]
Explore the source record for details and available documents.
A Self-Synchronizing Underwater Acoustic Network for Mooring Load Monitoring of a Wave Energy Converter.
Abstract not provided.
Challenges and Their Potential Solutions in Implementing Synchronized Waveform Applications.
Abstract not provided.