FLTSATCOM-D
A press release concerning the FLTSATCOM-D communications satellite launching is presented. The satellite system and the Atlas Centaur launch vehicle are described.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A press release concerning the FLTSATCOM-D communications satellite launching is presented. The satellite system and the Atlas Centaur launch vehicle are described.
The largest and heaviest spacecraft yet to be launched into geosynchronous orbit by an Atlas Centaur launch vehicle, FLTSATCOM D is part of a versatile military satellite communication system which includes terminals at Navy land bases, and on naval aircraft, ships, and submarines. The design and capabilities of the launch vehicle are described as well as those of the satellite. Information relative to launch windows, flight plan, radar and telemetry coverage, selected trajectory information is presented. A brief sequence of flight events is included.
With 12,000 voice circuits and 2 television channels, intelsat 5, the first of a new generation of international telecommunication satellites, has almost double the communication capability of early satellites in the series. The 1,928 kilogram (at a lunch) satellite will be placed into geosynchronous orbit over the Atlantic Ocean to provide communications between North America and Europe. The characteristics of the Atlas Centaur launch vehicle to be used are described and the flights events of the launch sequence are tabulated.
The technology and capability of the INTELSAT 5 series satellites and the Atlas-Centaur launch vehicle are described. Data relative to launch windows, flight plans, radar, and telemetry are included along with selected trajectory information and a sequence of flight events.
The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.
Launch of the FLTSATOOM-E, into an elliptical orbit by the Atlas Centaur launch vehicle is announced. The launch and relevant launch operations are described. A chart of the launch sequence for FLTSATCOM-E communication satellite is given.
The launch sequence of the Intelsat 5-C satellite is announced. A brief description of the satellite and the Atlas Centaur launch vehicle is given. Prelaunch operations are included.
Plans for the Intelsat 5D (F4) satellite launch are presented. The spacecraft and its subsystems are described and the mission is summarized. The Atlas Centaur launch vehicle is also described.
The design of an unmanned Martian polar exploration system is presented. The system elements include subsystems for transportation of material from earth to Mars, study of the Martian north pole, power generation, and communications. Early next century, three Atlas 2AS launch vehicles will be used to insert three Earth-Mars transfer vehicles, or buses, into a low-energy transfer orbit. Capture at Mars will be accomplished by aerobraking into a circular orbit. Each bus contains four landers and a communications satellite. Six of the twelve total landers will be deployed at 60 deg intervals along 80 deg N, and the remaining six landers at 5 deg intervals along 30 deg E from 65 deg N to 90 deg N by a combination of retrorockets and parachutes. The three communications satellites will be deployed at altitudes of 500 km in circular polar orbits that are 120 deg out of phase. These placements maximize the polar coverage of the science and communications subsystems. Each lander contains scientific equipment, two microrovers, power supplies, communications equipment, and a science computer. The lander scientific equipment includes a microweather station, seismometer, thermal probe, x-ray spectrometer, camera, and sounding rockets. One rover, designed for short-range (less than 2 km) excursions from the lander, includes a mass spectrometer for mineral analysis, an auger/borescope system for depth profiling, a deployable thermal probe, and charge coupled device cameras for terrain visualization/navigation. The second rover, designed for longer-range (2-5 km) excursions from the lander, includes radar sounding/mapping equipment, a seismometer, and laser ranging devices. Power for all subsystems is supplied by a combination of solar cells, Ni-H batteries, and radioisotope thermoelectric generators. Communications are sequenced from rovers, sounding rockets, and remote sensors to the lander, then to the satellites, through the Deep Space Network to and from earth.
The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.
ORION F1 was launched on 29th November 1994 on an Atlas IIA launch vehicle. It was designed, built and delivered in-orbit by Matra Marconi Space Systems Plc and was handed over to ORION Satellite Corporation on 20th January 1995 at its on-station longitude of 37.5 deg W. The mission differed significantly from that of any other geostationary communications satellite in that the Transfer Orbit apogee altitude of 123,507 km was over three times geosynchronous (GEO) altitude and one third of the way to the moon. The SuperSynchronous Transfer Orbit (SSTO) mission is significantly different from the standard Geostationary Transfer Orbit (GTO)mission in a number of ways. This paper discusses the essential features of the mission design through its evolution since 1987 and the details of the highly successful mission itself including a detailed account of the attitude determination achieved using the Galileo Earth and Sun Sensor (ESS).
In 1995, an Atlas IIAS launch vehicle will loft the Solar and Heliospheric Observatory (SOHO) as part of the International Solar and Terrestrial Physics program. The operational phase of the SOHO mission will be conducted from a `halo orbit' about the Sun-Earth interior libration point. Depending on the time of the year of launch, the optimal transfer requires a parking orbit of variable duration to satisfy widely varying inertial targets. A simulation capability has been developed that optimizes the launch vehicle ascent and spacecraft transfer phases of flight together, subject to both launch vehicle and spacecraft constraints. It will be shown that this `ground-up' simulation removes the need for an intermediate target vector at Centaur upper stage/spacecraft separation. Although providing only a modest gain in deliverable satellite mass, this capability substantially improves the mission integration process by removing the strict reliance on near-Earth target vectors. Trajectory data from several cases are presented and future applications of this capability are also discussed.
The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.
The Next Generation Space Telescope (NGST) is currently in a Pre Phase A study effort to prove feasibility of design and to show that the design can be implemented within cost constraint guidelines and meet the requirements of the science community. In an effort to achieve the science communities goals as outlined in "HST and Beyond" the NGST team has developed a government "yardstick" design of an eight meter diameter segmented telescope which would be launched in an Atlas IIAS launch vehicle to a L2 (Lagrange Point) orbit. This paper will discuss the design of the Optical Telescope Assembly (OTA) and the various issues and complications of designing lightweight optics to be placed in the environment that the NGST will encounter both during launch and during its operational mission at L2. The OTA must be lightweight but structurally must withstand the launch environment and transfer to its final L2 orbit. The OTA must be stable at L2 to provide high quality science at the cryogenic temperatures it will experience. The OTA segmented petal concept is to develop lightweight optics which can either be manipulated to achieve and maintain a desired figure or be rigid enough so that change in shape is only necessary for phasing and alignment. The secondary mirror structural mast must also be rigid with frequency responses which are not coupled to spacecraft modes in order to maintain and decenter and despace requirements.
The footage shows the Solar and Heliospheric Observatory's (SOHO) payload mating with the Atlas Centaur launch vehicle in the Spacecraft Assembly and Encapsulation Facility (SAEF-2).
Live footage of the Solar and Heliospheric Observatory (SOHO) Spacecraft located at the Spacecraft Assembly and Encapsulation Facility (SAEF 2) is presented. A representative from the European Space Agency (ESA) SOHO project, and Kenneth Sizemore, Project Manager Goddard Space Flight Center, discuss the objectives of the SOHO mission, which are to provide an understanding of how the sun works and also its interaction with the Earth's environment. SOHO will be positioned between the sun and the Earth and will give the scientist an unobstructed view of the Sun for two years. SOHO will be positioned along with Atlas IIAS which is an Atlas Centaur launch vehicle featuring two solid rocket boosters. Launch is set for November 1995.
The Earth Observing System (EOS), managed by NASA's Goddard Space Flight Center (GSFC), Greenbelt, Maryland, is the centerpiece of the Earth Science Enterprise (formerly called "Mission to Planet Earth"), a long-term coordinated research effort to study the Earth as a global system. Terra was launched on December 18, 1999 aboard an ATLAS-IIAS launch vehicle from Vandenberg Air Force Base, California. Terra is a near-polar orbiting spacecraft that will cross the equator at 10:30 AM local time. Terra will collect data simultaneously from a complement of five instruments: CERES (Clouds and the Earth's Radiant Energy System), MISR (Multi-angle Imaging SpectroRadiometer) and MODIS (Moderate-resolution Imaging Spectroradiometer) are provided by the United States; MOPITT (Measurements Of Pollution In The Troposphere) by Canada; and ASTER (Advanced Spaceborne Thermal Emission and Reflection radiometer) by Japan. Researchers around the world will use data from these instruments to study how the atmosphere, land, ocean, and life interact with each other on a global scale. This interactive CD introduces Terra's overall objectives and its instruments, the new technologies developed for Terra, the launch of Terra, and its flight dynamics.
The Earth Observing System (EOS) is managed by NASA's Goddard Space Flight Center (GSFC), Greenbelt, MD, is the centerpiece of the Earth Science Enterprise (formerly called 'Mission to Planet Earth'), a long-term coordinated research effort to study the Earth as a global system. Terra was launched on December 18, 1999 aboard an ATLAS-IIAS launch vehicle from Vandenberg Air Force Base, CA. Terra is a near-polar orbiting spacecraft that will cross the equator at 10:30 am local time. Terra will collect data simultaneously from a complement of five instruments: CERES, MISR, and MODIS are proved by the US; MOPITT by Canada; and ASTER by Japan. Researchers around the world will use data from these instruments to study how the atmosphere, land, ocean, and life interact with each other on a global scale.