Search NASA⌕ Search

SEARCH · Search NASA

Results for “Announcement of Opportunity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Science Mission Definition Studies for TROPIX

This document summarizes the results of mission definition studies for solar electric propulsion missions that have been carried out over the last approximately three years. The major output from the studies has been two proposals which were submitted to NASA in response to Announcements of Opportunity for missions and an ongoing Global Magnetospheric Dynamics mission study. The bulk of this report consists of copies of the proposals and preliminary materials from the GMD study that will be completed in the coming months.

Fennell, J. F.↗

[Instrument Designs for SOFIA: FOCUS and FORCAST]

As a result of these studies a proposal for FORCAST was submitted to the SOFIA Announcement of Opportunity for Instruments. FORCAST, a facility instrument, was one of the winning proposals. A short description of FORCAST follows: (1) FORCAST is a dual-channel, high-sensitivity, wide-field camera designed to perform continuum imaging in the mid-infrared (4-8 microns) and far-infrared (16-40 microns). The pixels map to 0.75 sec. on the sky and the total field-of-view is 3.2 min. During normal operation a cold MgO dichroic allows imaging in two bands (16-25 and 25-40 microns) enabling high efficiency, simultaneous observations. For imaging at shorter wavelengths (4-8 microns), a mirror replaces the dichroic. FORCAST simultaneously operates two 256 x 256 Si BIB hybrid arrays from Boeing (formerly Rockwell). A Si:As BIB array is used for lambda less than 25 microns while a Si:Sb BIB array is use for lambda greater than 25 microns, FORCAST allows selection of the bandpass independently for each channel via filter wheels. Several specific filters are needed for the Pi science program. Selection of other filters will be based on input from the SOFIA science community. These can include filters to cover specific lines or dust features (such as the PAH features in the 4-8 microns regime). Future upgrades could include a polarimetric capability. The Pi team has extensive experience with all of the technologies used in FORCAST. FORCAST uses mature, low-risk, state-of-the-art technology ensuring highly reliability. In addition, FORCAST will be easy to set up for an observing run and easy to operate (with an intuitive graphical interface). We feel that we can virtually guarantee success on the first flight with FORCAST. FORCAST is designed to complement SIRTF (ISO will no longer be functional). While it cannot achieve the sensitivity levels of SIRTF, FORCAST covers sections of phase space not planned for SIRTF (30-40 microns imaging) and has significantly higher spatial resolution than SIRTF at all wavelengths.

Source record↗

Collaboration on SEP Missions to the Moon and Small Bodies

In response to the Discovery announcement of opportunity a team consisting of TRW Lewis Research Center, JPL and UCLA with scientific co-investigators from government and University laboratories have proposed to fly the first planetary solar electric propulsion (SEP) mission. Diana is designed to carry an X-ray and gamma ray spectrometer, and imaging spectrometer, a framing camera, a laser altimer an ion spectrometer and a magnetometer. In order to obtain lunar gravity data from the far side of the moon a relay satellite is placed into high polar orbit about the moon to relay the Doppler-shifted telemetry to Earth. Diana will spend two months in a 700 km polar orbit obtaining mineralogical data from a full spectral map of the lunar surface, and then spend a year in a 100 km (or below) polar orbit mapping the lunar elemental composition, its topography, gravity field, ions from its atmosphere and its permanent and induced magnetic fields. After the low altitude mapping phase the ion thrusters propel the spacecraft out of the lunar sphere of influence and onto a heloioscentric trajectory to rendezvous with dormant comet Wilson-Harrington. The ground truth provided by the returned lunar samples to validate the remote sensing instruments for lunar studies will also serve to validate the Wilson-Harrington observations since the same instruments will be used at both bodies.

Pieters, C. M.↗

HEDS Goals

In November of 1996, NASA made the decision to fully integrate several areas of robotic and human Mars exploration study and planning. As a result of this decision, requirements for unmanned robotic missions to support human Mars exploration were identified and a plan to meet these requirements was developed. Concrete progress in the implementation of this plan has been made. Three experiments have been selected and are in development for the Mars Surveyor Program 2001 Orbiter and Lander missions which will provide critical data for the planning of human missions to Mars. An Announcement of Opportunity for the Mars Surveyor Program 2003 Lander mission has recently been released which solicited proposals related to planning for a human mission. In order to define HEDS objectives for Mars robotic missions, it is important to understand what information is required as a foundation for mounting a program of exploration of this magnitude. We identify areas of research on robotic missions that will enable future human missions. These areas include Site Selection for Human Missions, Hazards to Human Explorers, Living off the Land, and Testing Critical Technologies in the Mars Environment.

Pline, A.↗

Demographics of Investigators Involved in OSSA-Funded Research

The birth of the U.S. civil space program and the subsequent, dramatic growth in the ranks of the space science research population occurred in the 1950s and 1960s'. The large, post- Sputnik/ Apollo buildup in space program manpower is now approximately one career-lifetime in the past. It is therefore natural to anticipate that a large fraction of the space program engineers, scientists, and managers who pioneered the early exploration of space are approaching retirement. Such a "retirement wave" bodes both a loss of manpower and, more fundamentally, a loss of experience from the civil-space manpower base. Such losses could play a critical role constraining in NASA's ability to expand or maintain its technical capabilities. If this indeed applies to the NASA space science research population, then the potential for problems is exacerbated by the anticipated growth in flight rates, data volume, and data-set diversity which will accompany the planned expansion in the OSSA science effort during the 1990s and 2000s. The purpose of this study was to describe the OSSA PI/Co-I population and to determine the degree to which the OSSA space science investigator population faces a retirement wave, and to estimate the future population of PIs in the 1990-2010 era. To conduct such a study, we investigated the present demographics of the PI and Co-1 population contained in the NASA/OSSA Announcement of Opportunity (AO) mailing list. PIs represent the "leadership" class of the OSSA scientific researcher population, and Co-Is represent one important, oncoming component of the "replacement" generation. Using the PI population data, we then make projection estimates of the future PI population from 1991 through 2010, under various NASA growth/PI demand scenarios.

Stern, S. Alan↗

Keeping the Deal

On the 4th of July 1997, I lay on a blanket with my family at a fireworks display near our home in Los Angeles, California. The pyrotechnics, they tell me, were dazzling. I wouldn't know. My attention was fixed on a tiny orange dot in the sky - Mars. A month earlier, NASA had released an Announcement of Opportunity for a supplementary payload on the Mars Surveyor Lander mission scheduled for launch in 2001. The Human Exploration and Development of Space (HEDS) organization had been authorized to make the most preliminary of investigations into the feasibility of sending humans to Mars. Among the requested investigations was an opportunity to study the dust and soil of the Red Planet, emphasizing possible hazards to human explorers. I spent that summer of '97 working on a proposal for the project I would eventually lead, the Mars Environmental Compatibility Assessment (MECA). MECA was selected in February of '98. We promised to deliver four new instruments by April 2000 with a modest budget of $5M. This is a story about some of the people who created MECA.

Hecht, Michael↗

The Neurolab Spacelab Mission: Neuroscience Research in Space: Results from the STS-90, Neurolab Spacelab Mission

Neurolab (STS-90) represents a major scientific achievement that built upon the knowledge and capabilities developed during the preceding 15 successful Spacelab module missions. NASA proposed a dedicated neuroscience research flight in response to a Presidential declaration that the 1990's be the Decade of the Brain. Criteria were established for selecting research proposals in partnership with the National Institutes of Health (NM), the National Science Foundation, the Department of Defense, and a number of the International Space Agencies. The resulting Announcement of Opportunity for Neurolab in 1993 resulted in 172 proposals from scientists worldwide. After an NIH-managed peer review, NASA ultimately selected 26 proposals for flight on the Neurolab mission.

Buckey, Jay C., Jr.↗

The MARSIS Science Mission

The Mars Advanced Radar for Subsurface and Ionospheric Sounding (MARSIS) is an integral component of the Mars Express mission. A low-frequency sounding radar was carried on the Russian Mars 96 spacecraft, and in keeping with the concept of re-flying the science experiments lost on that mission, a call for a radar sounder was part of the Announcement of Opportunity for the 2003 ESA Mars Express mission. MARSIS is the only totally new instrument on Mars Express. The instrument was developed, delivered and operated as a joint effort between the Italian Space Agency and the U.S space agency NASA. The MARSIS science mission has been delayed due to concerns about the safety of the antenna deployment. As a testament to the importance placed on the

Plaut, J J.↗

(abstract) A Solar Electric Propulsion Mission to the Moon and Beyond!

The technological development of solar electric propulsion has advanced significantly over the last few years. Mission planners are now seriously studying which missions would benefit most from solar electric propulsion (SEP) and NASA's Solar System Exploration Division is contributing funding to ground and space qualification tests. In response to the impending release of NASA's Announcement of Opportunity for Discovery class planetary missions, we have undertaken a pre-Phase A study of a SEP mission to the Moon. This mission will not only return a wealth of new scientific data but will open up a whole new era of planetary exploration.

solar electric propulsion SEP Moon↗

Technology Readiness of the NEXT Ion Propulsion System

The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system has been in advanced technology development under the NASA In-Space Propulsion Technology project. The highest fidelity hardware planned has now been completed by the government/industry team, including: a flight prototype model (PM) thruster, an engineering model (EM) power processing unit, EM propellant management assemblies, a breadboard gimbal, and control unit simulators. Subsystem and system level technology validation testing is in progress. To achieve the objective Technology Readiness Level 6, environmental testing is being conducted to qualification levels in ground facilities simulating the space environment. Additional tests have been conducted to characterize the performance range and life capability of the NEXT thruster. This paper presents the status and results of technology validation testing accomplished to date, the validated subsystem and system capabilities, and the plans for completion of this phase of NEXT development. The next round of competed planetary science mission announcements of opportunity, and directed mission decisions, are anticipated to occur in 2008 and 2009. Progress to date, and the success of on-going technology validation, indicate that the NEXT ion propulsion system will be a primary candidate for mission consideration in these upcoming opportunities.

Benson, Scott W.↗

LCROSS: A High Return, Small Satellite Mission

Early in 2006, the NASA Exploration Systems Mission Directorate (ESMD) held a competition for NASA Centers to propose innovative ideas for a secondary payload mission to launch with the Lunar Reconnaissance Orbiter (LRO) to the Moon. The successful proposal could cost no more than $80 million dollars (less was preferred), would have to be ready to launch with the LRO in 31 months, could weigh no more than 1000 kg (fuelled), and would be designated a risk-tolerant "Class D" mission. In effect, NASA was offering a fixed-price contract to the winning NASA team to stay within a cost and schedule cap by accepting an unusually elevated risk position. To address this Announcement of Opportunity to develop a cost-and-schedule-capped secondary payload mission to fly with LRO, NASA Ames Research Center (ARC) in Moffett Field, CA, USA embarked on a brainstorming effort termed "Blue Ice" in which a small team was asked to explore a number of mission scenarios that might have a good chance for success and still fit within the stated programmatic constraints. From this work, ARC developed and submitted six of the nineteen mission proposals received by ESMD from throughout the Agency, one of which was LCROSS - a collaborative effort between ARC and its industrial partner, Northrop-Grumman (NG) in Redondo Beach, CA, USA.

Andrews, Daniel R.↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗

The Potential for Hosted Payloads at NASA

The 2010 National Space Policy encourages federal agencies to actively explore the use of inventive, nontraditional arrangements for acquiring commercial space goods and services to meet United States Government requirements, including...hosting government capabilities on commercial spacecraft. NASA's Science Mission Directorate has taken an important step towards this goal by adding an option for hosted payload responses to its recent Announcement of Opportunity (AO) for Earth Venture-2 missions. Since NASA selects a significant portion of its science missions through a competitive process, it is useful to understand the implications that this process has on the feasibility of successfully proposing a commercially hosted payload mission. This paper describes some of the impediments associated with proposing a hosted payload mission to NASA, and offers suggestions on how these impediments might be addressed. Commercially hosted payloads provide a novel way to serve the needs of the science and technology demonstration communities at a fraction of the cost of a traditional Geostationary Earth Orbit (GEO) mission. The commercial communications industry launches over 20 satellites to GEO each year. By exercising this repeatable commercial paradigm of privately financed access to space with proven vendors, NASA can achieve science goals at a significantly lower cost than the current dedicated spacecraft and launch vehicle approach affords. Commercial hosting could open up a new realm of opportunities for NASA science missions to make measurements from GEO. This paper also briefly describes two GEO missions recommended by the National Academies of Science Earth Science Decadal Survey, the Geostationary Coastal and Air Pollution Events (GEO-CAPE) mission and the Precipitation and All-weather Temperature and Humidity (PATH) mission. Hosted payload missions recently selected for implementation by the Office of the Chief Technologist are also discussed. Finally, there are technical differences specific to hosted payloads and the GEO environment that must be considered when planning and developing a hosted payload mission. This paper addresses some of payload accommodation differences from the typical NASA LEO mission, including spacecraft interfaces, attitude control and knowledge, communications, data handling, mission operations, ground systems, and the thermal, radiation, and electromagnetic environment. The paper also discusses technical and programmatic differences such as limits to NASA's involvement with commercial quality assurance processes to conform to the commercial schedule and minimizing the price that makes hosted payloads an attractive option.

Andraschko, Mark↗

Electrostatic Levitation Furnace for the ISS

JAXA (Japan Aerospace Exploration Agency) has just started the development of Electrostatic Levitation Furnace to be launched in 2014 for the ISS. This furnace can control the sample position with electrostatic force and heat it above 2000 degree Celsius using semiconductor laser from four different directions. The announcement of Opportunity will be issued soon for this furnace. In this paper, we will show the specifications of this furnace and also the development schedule

Murakami, Keiji↗

Mars Atmosphere Resource Verification INsitu (MARVIN) - In Situ Resource Demonstration for the Mars 2020 Mission

The making of oxygen from resources in the Martian atmosphere, known as In Situ Resource Utilization (ISRU), has the potential to provide substantial benefits for future robotic and human exploration. In particular, the ability to produce oxygen on Mars for use in propulsion, life support, and power systems can provide significant mission benefits such as a reducing launch mass, lander size, and mission and crew risk. To advance ISRU for possible incorporation into future human missions to Mars, NASA proposed including an ISRU instrument on the Mars 2020 rover mission, through an announcement of opportunity (AO). The purpose of the the Mars Atmosphere Resource Verification INsitu or (MARVIN) instrument is to provide the first demonstration on Mars of oxygen production from acquired and stored Martian atmospheric carbon dioxide, as well as take measurements of atmospheric pressure and temperature, and of suspended dust particle sizes and amounts entrained in collected atmosphere gases at different times of the Mars day and year. The hardware performance and environmental data obtained will be critical for future ISRU systems that will reduce the mass of propellants and other consumables launched from Earth for robotic and human exploration, for better understanding of Mars dust and mitigation techniques to improve crew safety, and to help further define Mars global circulation models and better understand the regional atmospheric dynamics on Mars. The technologies selected for MARVIN are also scalable for future robotic sample return and human missions to Mars using ISRU.

Sanders, Gerald B.↗

AVIATR - Aerial Vehicle for In-situ and Airborne Titan Reconnaissance A Titan Airplane Mission Concept

We describe a mission concept for a stand-alone Titan airplane mission: Aerial Vehicle for In-situ and Airborne Titan Reconnaissance (AVIATR). With independent delivery and direct-to-Earth communications, AVIATR could contribute to Titan science either alone or as part of a sustained Titan Exploration Program. As a focused mission, AVIATR as we have envisioned it would concentrate on the science that an airplane can do best: exploration of Titan's global diversity. We focus on surface geology/hydrology and lower-atmospheric structure and dynamics. With a carefully chosen set of seven instruments-2 near-IR cameras, 1 near-IR spectrometer, a RADAR altimeter, an atmospheric structure suite, a haze sensor, and a raindrop detector-AVIATR could accomplish a significant subset of the scientific objectives of the aerial element of flagship studies. The AVIATR spacecraft stack is composed of a Space Vehicle (SV) for cruise, an Entry Vehicle (EV) for entry and descent, and the Air Vehicle (AV) to fly in Titan's atmosphere. Using an Earth-Jupiter gravity assist trajectory delivers the spacecraft to Titan in 7.5 years, after which the AVIATR AV would operate for a 1-Earth-year nominal mission. We propose a novel 'gravity battery' climb-then-glide strategy to store energy for optimal use during telecommunications sessions. We would optimize our science by using the flexibility of the airplane platform, generating context data and stereo pairs by flying and banking the AV instead of using gimbaled cameras. AVIATR would climb up to 14 km altitude and descend down to 3.5 km altitude once per Earth day, allowing for repeated atmospheric structure and wind measurements all over the globe. An initial Team-X run at JPL priced the AVIATR mission at FY10 $715M based on the rules stipulated in the recent Discovery announcement of opportunity. Hence we find that a standalone Titan airplane mission can achieve important science building on Cassini's discoveries and can likely do so within a New Frontiers budget.

UAV↗

IXPE - The Imaging X-Ray Polarimetry Explorer

The Imaging X-ray Polarimetry Explorer (IXPE) is a Small Explorer Mission that will be proposed in response to NASA's upcoming Announcement of Opportunity. IXPE will transform our understanding of the most energetic and exotic astrophysical objects, especially neutron stars and black holes, by measuring the linear polarization of astronomical objects as a function of energy, time and, where relevant, position. As the first dedicated polarimetry observatory IXPE will add a new dimension to the study of cosmic sources, enlarging the observational phase space and providing answers to fundamental questions. IXPE will feature x-ray optics fabricated at NASA/MSFC and gas pixel focal plane detectors provided by team members in Italy (INAF and INFN). This presentation will give an overview of the proposed IXPE mission, detailing the payload configuration, the expected sensitivity, and a typical observing program.

Ramsey, Brian↗