Search NASA⌕ Search

SEARCH · Search NASA

Results for “Apollo program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Apollo 16 mission report. Supplement 2: Service Propulsion system final flight evaluation

The Apollo 16 Mission was the sixteenth in a series of flights using Apollo flight hardware and included the fifth lunar landing of the Apollo Program. The Apollo 16 Mission utilized CSM 113 which was equipped with SPS Engine S/N 66 (Injector S/N 137). The engine configuration and expected performance characteristics are presented. Since previous flight results of the SPS have consistently shown the existence of a negative mixture ratio shift, SPS Engine S/N 66 was reorificed to increase the mixture ratio for this mission. The propellant unbalance for the two major engine firings is compared with the predicted unbalance. Although the unbalance at the end of the TEI burn is significantly different than the predicted unbalance, the propellant mixture ratio was well within limits. The SPS performed six burns during the mission, with a total burn duration of 575.3 seconds. The ignition time, burn duration and velocity gain for each of the six SPS burns are reported.

Smith, R. J.↗

NASA Technology Applications Team

The contributions of NASA to the advancement of the level of the technology base of the United States are highlighted. Technological transfer from preflight programs, the Viking program, the Apollo program, and the Shuttle and Skylab programs is reported.

Source record↗

Concepts to Automate Fluid Transfer Capability of Low Impact Docking System (LIDS)

The capability to transfer mass between spacecraft is necessary for many mission scenarios. Docking and berthing operations have enabled fluid, electrical, crew and equipment transfers to some degree on all manned space operations since the Gemini program. The Apollo program performed some sophisticated docking maneuvers to land men on the moon and return them safely to Earth. These programs primarily transferred crew, equipment, and pressurized atmosphere between docked spacecraft. The International Space Station (ISS) U.S. modules are connected by Common Berthing Mechanism (CBM) portals. They provide many feed-through ports for electrical, and fluid transfer between modules, as well as a large diameter crew and equipment tunnel. Fluid and electrical jumpers are manually installed after the CBM sealing surfaces have been securely mated to maintain the pressurized cabin environment. CBM berthing and subsequent fluid transfer capability requires a lengthy manual process involving an active interface that mates with a passive half. The Androgynous Peripheral Attach System (MAS) a Russian technology that docked the Russian Zarya module to Unity, or Node 1, is a more complex system that also is capable of fuel transfer, enabling refueling of the Russian re-boost engines on ISS. For several years, a Low Impact Docking System (LIDS) has been under development at Johnson Space Center (JSC). This docking technology has a requirement to be androgynous in order to allow the fabrication of a single configuration that can dock with all other LIDS units. It is desired to make electrical and fluid coupling mating an automated process to enable routine docking and undocking operations to support future exploration missions. It is envisioned that modular design and vehicle assembly will require an efficient LIDS for fuel, electrical, crew, and equipment transfer. Marshall Space Flight Center (MSFC) has joined the LIDS development effort and plans to employ fluid transfer concepts and technology from previous development programs, such as the Automated Fluid Interface System (AFIS) and the Ohital Fluid Transfer System (OFTS) that were developed and tested by MSFC. Orbital Expressderived robotic satellite servicing technology is scheduled to fly soon to demonstrate fluid transfer technology developed for the Air Force. This paper will compare known technology against possible fluid transfer requirements for LIDS to develop design strategies for automated fluid transfer.

Miernik, Janie H.↗

The Affording Mars Workshop: Background and Recommendations

A human mission to Mars is the stated "ultimate" goal for NASA and is widely believed by the public to be the most compelling destination for America's space program. However, widely cited enormous costs - perhaps as much as a trillion dollars for a many-decade campaign - seem to be an impossible hurdle, although political and budget instability over many years may be equally challenging. More recently, a handful of increasingly detailed architectures for initial Mars missions have been developed by commercial companies that have estimated costs much less than widely believed and roughly comparable with previous major human space flight programs: the Apollo Program, the International Space Station, and the space shuttle. Several of these studies are listed in the bibliography to the workshop report. As a consequence of these new scenarios, beginning in spring, 2013 a multiinstitutional planning team began developing the content and invitee list for a winter workshop that would critically assess concepts, initiatives, technology priorities, and programmatic options to reduce significantly the costs of human exploration of Mars. The output of the workshop - findings and recommendations - would be presented in a number of forums and discussed with national leaders in human space flight. It would also be made available to potential international partners. This workshop was planned from the start to be the first in a series. Subsequent meetings, conferences, and symposia will concentrate on topics not able to be covered in December. In addition, to make progress in short meeting, a handful of ground rules were adopted by the planning team and agreed to by the participants. Perhaps the two most notable such ground rules were (1) the Space Launch System (SLS) and Orion would be available during the time frame considered by the participants and (2) the International Space Station (ISS) would remain the early linchpin in preparing for Mars exploration over the coming decade. The workshop was organized around three topical breakout sessions: 1. The ISS and the path to Mars: The critical coming decade 2. Affordability and sustainability: what does it mean and what are its implications within guidelines established at the start of the workshop? 3. Notional sequence(s) of cost-achievable missions for the 2020s to 2030s, including capability objectives at each stage and opportunities for coordinated robotic partnerships.

background↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

Management and control of Skylab missions

The flight operations task, as developed in support of the Skylab Program, was evolutionary in nature and, to a great extent, was an orderly extension of the flight control concepts used in the Apollo Program, tempered by the nature of the Skylab Program. During the terminal portion of the Apollo Program, many of the operating concepts proposed for Skylab were tested and used for Apollo support to obtain a realistic evaluation of these new techniques. The principal concept developed in the Apollo Program and augmented in support of the Skylab Program was one wherein a professional operations team would provide support to the scientists in the areas of mission integration, experiment, and experiment support systems, monitoring and control, and data retrieval.

Roach, J. W.↗

Challenges of CPAS Flight Testing

The Crew Exploration Vehicle Parachute Assembly System (CPAS) is being designed to land the Orion Crew Module (CM) at a safe rate of descent at splashdown via a series of Drogue, Pilot, and Main parachutes. Because Orion is considerably larger and heavier than Apollo, many of the flight test techniques developed during the Apollo program must be modified. The Apollo program had a dedicated C-133 aircraft, which was modified to allow a simple airdrop of "boilerplate" flight test vehicles. However, the CPAS program must use either commercial or military assets with minimal modifications to airframes or procedures. Conceptual envelopes from 2-Degree Of Freedom trajectories are presented for several existing and novel architectures. Ideally, the technique would deliver a representative capsule shape to the desired altitude and dynamic pressure at test initiation. However, compromises must be made on the characteristics of trajectories or the fidelity of test articles to production hardware. Most of the tests to date have used traditional pallet and weight tub or missile-shaped test vehicles. New test vehicles are being designed to better incorporate Orion structural components and deploy parachutes in a more representative fashion. The first attempt to test a capsule-shaped vehicle failed due to unexpected events while setting up the test condition through a series of complex procedures. In order to avoid the loss of another expensive test article which will delay the program, simpler deployment methods are being examined and more positive control of the vehicle will be maintained. Existing challenges include interfacing with parent aircraft, separating test vehicles, achieving test conditions, and landing within limited test ranges. All these challenges must be met within cost and schedule limits.

Ray, Eric S.↗