Search NASA⌕ Search

SEARCH · Search NASA

Results for “Architecture Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Field Tested Service Oriented Robotic Architecture: Case Study

This paper presents the lessons learned from six years of experiments with planetary rover prototypes running the Service Oriented Robotic Architecture (SORA) developed by the Intelligent Robotics Group (IRG) at NASA Ames Research Center. SORA relies on proven software methods and technologies applied to the robotic world. Based on a Service Oriented Architecture and robust middleware, SORA extends its reach beyond the on-board robot controller and supports the full suite of software tools used during mission scenarios from ground control to remote robotic sites. SORA has been field tested in numerous scenarios of robotic lunar and planetary exploration. The results of these high fidelity experiments are illustrated through concrete examples that have shown the benefits of using SORA as well as its limitations.

Flueckiger, Lorenzo↗

Design of a modular digital computer system, CDRL no. D001, final design plan

The engineering breadboard implementation for the CDRL no. D001 modular digital computer system developed during design of the logic system was documented. This effort followed the architecture study completed and documented previously, and was intended to verify the concepts of a fault tolerant, automatically reconfigurable, modular version of the computer system conceived during the architecture study. The system has a microprogrammed 32 bit word length, general register architecture and an instruction set consisting of a subset of the IBM System 360 instruction set plus additional fault tolerance firmware. The following areas were covered: breadboard packaging, central control element, central processing element, memory, input/output processor, and maintenance/status panel and electronics.

Easton, R. A.↗

Aerial Explorers

This paper presents recent results from a mission architecture study of planetary aerial explorers. In this study, several mission scenarios were developed in simulation and evaluated on success in meeting mission goals. This aerial explorer mission architecture study is unique in comparison with previous Mars airplane research activities. The study examines how aerial vehicles can find and gain access to otherwise inaccessible terrain features of interest. The aerial explorer also engages in a high-level of (indirect) surface interaction, despite not typically being able to takeoff and land or to engage in multiple flights/sorties. To achieve this goal, a new mission paradigm is proposed: aerial explorers should be considered as an additional element in the overall Entry, Descent, Landing System (EDLS) process. Further, aerial vehicles should be considered primarily as carrier/utility platforms whose purpose is to deliver air-deployed sensors and robotic devices, or symbiotes, to those high-value terrain features of interest.

Young, Larry A.↗

Space Station needs, attributes, and architectural option study

Potential user interest and requirements for a manned space station are examined for space and applications missions, commercial missions, technology demonstration missions, space operations missions, and national security missions. Approaches to architectural options, candidate payloads, and technology drivers are considered. Mission imposed requirements for the space operations center are also considered.

Source record↗

Summary of Space Environment Magnetometer and Particle Replacement Experiment (SEMPRE) Study

As part of the GOES-R series follow on architecture study following the NOAA Satellite Observing System Architecture (NSOSA) study, a study team evaluated the feasibility of accommodating the GOES in-situ instruments (Magnetometer and Particle Detectors) on a dedicated spacecraft with no impact to the overall baseline mission cost assuming two large observatories. The accommodations cost on a primary operational type observatory are non-negligible requiring: a large non-magnetic boom to reduce the impact of the spacecraft interference on the magnetometer; and strict contamination control and magnetic cleanliness to prevent magnetic contamination near the magnetometers. These, along with the additional interface complexities greatly increase the cost of larger spacecraft by extending integration time with a large marching army. By contrast, a dedicated mission provides flexibility in location and refresh rate not afforded when these sensors are launched as secondary payloads. This study performed an informal industry survey of small form-factor instruments currently flying or in process of being developed. The study identified three potential particle detector suites and multiple magnetometers that will satisfy the requirements while having low enough volume and mass to allow accommodation on a rideshare class spacecraft. Using the largest of the identified particle detector suites, the Goddard Space Flight Center Mission Design Lab developed a design for a rideshare spacecraft that will accommodate the particle detector suite and magnetometer. The cost of the spacecraft, based on multiple cost models, is comparable to the cost of accommodating the magnetometer and particle detector suite on two (East and West) larger main observatories.

Todirita, Monica↗

Terrestrial Planet Finder Coronagraph : technology and mission design studies

The Terrestrial Planet Finder (TPF) coronagraph study involves exploring the technologies that enable a coronagraph style instrument to image and characterize earth-like planets orbiting nearby stars. Testbeds have been developed to demonstrate the emerging technologies needed for this effort and an architecture study has resulted in designs of a facility that will provide the environment needed for the technology to function in this role. A broad community of participants is involved in this work through studies, analyses, fabrication of components, and participation in the design effort. The scope of activities - both on the technology side and in the architecture study side - will be presented in this paper. The status and the future plans of the activities will be reviewed.

space↗

ATHLETE: Lunar Cargo Handling for International Lunar Exploration

As part of the Human-Robot Systems Project within the NASA Exploration Technology Development Program, the Jet Propulsion Laboratory is developing a vehicle called ATHLETE: the All-Terrain Hex-Limbed Extra-Terrestrial Explorer. The basic idea of ATHLETE is to have six relatively small wheels on the ends of legs. The small wheels and associated drive actuators are much less massive than the larger wheels and gears needed for an "all terrain" vehicle that cannot "walk" out of extreme terrain. The mass savings for the wheels and wheel actuators is greater than the mass penalty of the legs, for a net mass savings. Starting in 2009, NASA became engaged in detailed architectural studies for international discussions with the European Space Agency (ESA), the Japanese Space Agency (JAXA), and the Canadian Space Agency (CSA) under the auspices of the International Architecture Working Group (IAWG). ATHLETE is considered in most of the campaign options considered, providing a way to offload cargo from large Altair-class landers (having a cargo deck 6+ meters above the surface) as well as offloading international landers launched on Ariane-5 or H-2 launch vehicles. These international landers would carry provisions as well as scientific instruments and/or small rovers that would be used by international astronauts as part of an international effort to explore the moon.Work described in this paper includes architectural studies in support of the international missions as well as field testing of a half-scale ATHLETE prototype performing cargo offloading from a lander mockup, along with multi-kilometer traverse, climbing over greater than 1 m rocks, tool use, etc.

International Collaboration in Space↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability for Orion. The EVAs will involve a two-person crew for approximately four hours. Currently, two EVAs are planned with one contingency EVA in reserve. Providing this EVA capability is very challenging due to system level constraints and a new and unknown environment. The goal of the EVA architecture for ARCM is one that builds upon previously developed technologies and lessons learned, and that accomplishes the ARCM mission while providing a stepping stone to future missions and destinations. The primary system level constraints are to 1) minimize system mass and volume and 2) minimize the interfacing impacts to the baseline Orion design. In order to minimize the interfacing impacts and to not perturb the baseline Orion schedule, the concept of adding "kits" to the baseline system is proposed. These kits consist of: an EVA kit (converts LEA suit to EVA suit), EVA Servicing and Recharge Kit (provides suit consumables), the EVA Tools, Translation Aids & Sample Container Kit (the tools and mobility aids to complete the tasks), the EVA Communications Kit (interface between the EVA radio and the MPCV), and the Cabin Repress Kit (represses the MPCV between EVAs). This paper will focus on the trade space, analysis, and testing regarding the space suit (pressure garment and life support system). Historical approaches and lessons learned from all past EVA operations were researched. Previous and current, successfully operated EVA hardware and high technology readiness level (TRL) hardware were evaluated, and a trade study was conducted for all possible pressure garment and life support options. Testing and analysis was conducted and a recommended EVA system architecture was proposed. Pressure garment options that were considered for this mission include the currently in-use ISS EVA Mobility Unit (EMU), all variations of the Advanced Crew Escape Suit (ACES), and the Exploration Z-suit. For this mission, the pressure garment that was selected is the Modified ACES (MACES) with EVA enhancements. Life support options that were considered included short closed-loop umbilicals, long open-loop umbilicals, the currently in-use ISS EMU Portable Life Support System (PLSS), and the currently in development Exploration PLSS. For this mission, the life support option that was selected is the Exploration PLSS. The greatest risk in the proposed architecture is viewed to be the comfort and mobility of the baseline MACES and the delicate balance between adding more mobility features while not compromising landing safety. Feasibility testing was accomplished in low fidelity analogs and in the JSC Neutral Buoyancy Laboratory (NBL) to validate the concept before a final recommendation on the architecture was made. The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work and further definition of the remaining kits will be conducted in government fiscal year 14.

Blanco, Raul A.↗

Space station needs, attributes and architectural options study costing working group briefing

The interface between tasks and the sequence of information flow are charted. The mission model and the requirements of each mission. These requirements along with the mission model schedule resulted in a further definition of the mission payloads, the Space Station architecture and the STS requirements was developed in task 2. The information was used to estimate the cost parameters necessary to generate cost estimates for the system with the aid of cost models for the Missions, Space Station and Space Transportation.

Source record↗

Technologies to Enable the Next Great Observatory

The Large Ultraviolet/Optical/Infrared Surveyor (LUVOIR) is one of four mission concepts being studied by NASA for the 2020 Decadal Survey in Astronomy and Astrophysics. Enabling a mission as ambitious as LUVOIR requires an array of technologies. Critically, a systems-level approach must be taken to developing these technologies, guided by architecture studies to place each technology in the appropriate system context. Three technology systems enable the LUVOIR science objectives: the system, the system, and the system. Each of the technology systems comprise the individual technology components that must be developed and demonstrated as a system. Supporting engineering manufacturing development efforts are also identified for early risk reduction. It is important to note that the high-contrast coronagraph instrument and ultra-stable segmented telescope technology systems are tightly coupled; the performance capabilities of one system drive the requirements of the other. Similarly, the ultraviolet instrumentation technology system is loosely coupled to the other two; while the relative performance affects each system, they do not necessarily drive one another. This coupling between systems requires continuous cross-validation between the technology development paths. It is therefore critical that the technology development plan be executed in parallel with a detailed Pre-Phase A Architecture Study to provide the necessary systems-level perspective and cross-validation.

Bolcar, Matthew R.↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability from the Orion spacecraft. For this mission, the pressure garment selected for both functions is the Modified Advanced Crew Escape Suit (MACES) with EVA enhancements and the life support option that was selected is the Exploration Portable Life Support System (PLSS) currently under development for Advanced Exploration Systems (AES). The proposed architecture meets the ARCM constraints, but much more work is required to determine the details of the suit upgrades, the integration with the PLSS, and the tools and equipment necessary to accomplish the mission. This work has continued over the last year to better define the operations and hardware maturation of these systems. EVA simulations were completed in the Neutral Buoyancy Lab (NBL) and interfacing options were prototyped and analyzed with testing planned for late 2014. This paper discusses the work done over the last year on the MACES enhancements, the use of tools while using the suit, and the integration of the PLSS with the MACES.

Bowie, Jonathan↗

Systems Analysis and Structural Design of an Unpressurized Cargo Delivery Vehicle

The International Space Station will require a continuous supply of replacement parts for ongoing maintenance and repair after the planned retirement of the Space Shuttle in 2010. These parts are existing line-replaceable items collectively called Orbital Replacement Units, and include heavy and oversized items such as Control Moment Gyroscopes and stowed radiator arrays originally intended for delivery aboard the Space Shuttle. Current resupply spacecraft have limited to no capability to deliver these external logistics. In support of NASA's Exploration Systems Architecture Study, a team at Langley Research Center designed an Unpressurized Cargo Delivery Vehicle to deliver bulk cargo to the Space Station. The Unpressurized Cargo Delivery Vehicle was required to deliver at least 13,200 lbs of cargo mounted on at least 18 Flight Releasable Attachment Mechanisms. The Crew Launch Vehicle design recommended in the Exploration Systems Architecture Study would be used to launch one annual resupply flight to the International Space Station. The baseline vehicle design developed here has a cargo capacity of 16,000 lbs mounted on up to 20 Flight Releasable Attachment Mechanisms. Major vehicle components are a 5.5m-diameter cargo module containing two detachable cargo pallets with the payload, a Service Module to provide propulsion and power, and an aerodynamic nose cone. To reduce cost and risk, the Service Module is identical to the one used for the Crew Exploration Vehicle design.

Wu, K. Chauncey↗

Automation Hooks Architecture Trade Study for Flexible Test Orchestration

We describe the conclusions of a technology and communities survey supported by concurrent and follow-on proof-of-concept prototyping to evaluate feasibility of defining a durable, versatile, reliable, visible software interface to support strategic modularization of test software development. The objective is that test sets and support software with diverse origins, ages, and abilities can be reliably integrated into test configurations that assemble and tear down and reassemble with scalable complexity in order to conduct both parametric tests and monitored trial runs. The resulting approach is based on integration of three recognized technologies that are currently gaining acceptance within the test industry and when combined provide a simple, open and scalable test orchestration architecture that addresses the objectives of the Automation Hooks task. The technologies are automated discovery using multicast DNS Zero Configuration Networking (zeroconf), commanding and data retrieval using resource-oriented Restful Web Services, and XML data transfer formats based on Automatic Test Markup Language (ATML). This open-source standards-based approach provides direct integration with existing commercial off-the-shelf (COTS) analysis software tools.

Lansdowne, Chatwin A.↗

Space station needs, attributes and architectural options study. Briefing material: Final review and executive summary

Advantages and disadvantages were assessed for configuration options for a modular 14' diameter space station, a modular aft cargo carrier and a shuttle derived vehicle. Early, intermediate, and mature configurations were defined as well as power requirements, heat rejection, hydrazine usage, and the external scavenging concept. Subsystems were analyzed for propulsion, attitude control, data processing, and communications. Areas of uncertainties, associated costs and benefits, and the cost by phase of the modular and shuttle derived vehicle configurations were identified. Technologies assessed included solar vs nuclear; gravity gradient vs active control; heat pipe radiators vs fluid loops; distributed processors vs centralized, and modular vs shuttle derived configuration. It was determined that the early space station architecture should include: (1) reusable OTV with aerobraking; (2) TMS with telepresence services; (3) OTV/TMS refueling and servicing capability; and (4) attached research laboratories for life sciences and materials processing.

Source record↗

TPSAS-NF1676L-13680-DND

The International Space Station will require a continuous supply of replacement parts for ongoing maintenance and repair after the retirement of the Space Shuttle. These parts, existing line-replaceable items collectively called Orbital Replacement Units, include heavy and oversized items such as Control Moment Gyroscopes and stowed radiator arrays originally intended for delivery aboard the Space Shuttle. Current resupply spacecraft have limited to no capability to deliver these external logistics. In support of NASA?s Exploration Systems Architecture Study, a team at Langley Research Center designed an Unpressurized Cargo Delivery Vehicle to deliver bulk cargo to the Space Station. The Unpressurized Cargo Delivery Vehicle was required to deliver at least 13,200 lb of cargo mounted on at least 18 Flight Releasable Attachment Mechanisms. The baseline vehicle design developed here has a cargo capacity of 16,000 lbs mounted on up to 20 Flight Releasable Attachment Mechanisms. Major vehicle components are a 5.5m-diameter cargo module containing two detachable cargo pallets with the payload, a Service Module to provide propulsion and power, and an aerodynamic nose cone. To reduce cost and risk, the Service Module is identical to the one used for the Crew Exploration Vehicle design. The Crew Launch Vehicle design recommended in the Exploration Systems Architecture Study was used to launch one annual resupply flight to the International Space Station.

K Chauncey Wu↗

From ESAS to Ares: A Chronology

Throughout my career, I have observed many launch vehicle efforts come and go. Although it may appear on the surface that those were dead-end streets, the knowledge we gained through them actually informs the work in progress. Following the tragic loss of the Space Shuttle Columbia's crew, the administration took the Columbia Accident Investigation Board's findings to heart and united the Agency behind the Vision for Space Exploration, with clear goals and objectives, including fielding a new generation of safe, reliable, and affordable space transportation. The genesis of the Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle activities now under way by a nationwide Government and industry team was the confirmation of the current NASA Administrator in April 2005. Shortly thereafter, he commissioned a team of aerospace experts to conduct the Exploration Systems Architecture Study (ESAS), which gave shape to launch vehicles that will empower America's resurgence in scientific discovery through human and robotic space exploration. In October 2005, I was asked to lead this effort, building the team and forming the partnerships that will, in turn, build America's next human-rated space transportation system. In November 2006, the Ares I team began conducting the System Requirements Review milestone, just 1 year after its formation. We are gaining momentum toward the first test flight of the integrated vehicle system in 2009, just a few short years away. The Agency is now poised to deliver on the commitment this nation has made to advance our interests in space. In its inaugural year, the Ares team has conducted the first human-rated launch vehicle major milestone in over 30 years. Using the Exploration Systems Architecture Study recommendations as a starting point, the vehicle designs have been evolved to best meet customer and stakeholder requirements to fulfill the strategic goals outlined in the Vision for Space Exploration.

Cook, Stephen A.↗

The 30/20 GHz mixed user architecture development study

A mixed-user system is described which provides cost-effective communications services to a wide range of user terminal classes, ranging from one or two voice channel support in a direct-to-user mode, to multiple 500 mbps trunking channel support. Advanced satellite capabilities are utilized to minimize the cost of small terminals. In a system with thousands of small terminals, this approach results in minimum system cost.

Source record↗