Search NASA⌕ Search

SEARCH · Search NASA

Results for “Artemis program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Artemis Navigation Architecture: Early Capabilities and Long Term Evolvability and Evolution

With the awarding of multiple contracts within the Artemis program and building on the success of Artemis I, NASA is investing in and demonstrating the vehicle capabilities necessary for a return to human crewed Lunar Missions. To support activities on the lunar surface, NASA is also assessing architecture options and approaches to enable high precision in-situ navigation within the lunar sphere of influence. These capabilities build on decades of research and advancements within the field, building and evolving the techniques used during Apollo. To support inter-operability and broad application within its elements, NASA conducted a trade on Orbital and Surface Lunar Architecture for PNT. Time-defined mission requirements were captured across elements to inform a phased approach and deployment of needed capability. The architecture must also address unique aspects of the South Pole lunar environments, specifically in terms of harsh lighting and hazardous terrain. To inform the study, documentation of primary users, operational concepts of operations, driving scenarios, and mission needs were used to define performance constraints and phasing. Multiple technologies were assessed in terms of maturity, applicability, and performance to meet the primary user needs forecast. The results of this study support the utilization of in-situ orbital infrastructure to provide a back-bone for navigation and emphasize the need for a common Lunar Reference System and Lunar Time Reference. This deployment can ensure compatibility and enable a high-accuracy in-situ capability. This provides further justification for the capabilities being invested in and deployed by NASA and other international agencies. In addition to including advancements in terrestrial surface navigation, NASA is also applying lessons learned and innovation in the contractual approach to the individual elements by means of a services-based contract mechanism. This impacts the navigation architecture heavily in terms of government and provider roles, in terms of levels of implementation, interoperability, and verification. These distinctions in roles provide constraints to the architecture approach in terms of implementation and integration and will be discussed. The development, use, and mandate of interoperability standards are being deployed to support cross-element compatibility. This paper will provide a summary of the NASA Lunar Navigation needs across its various elements and the proposed deployment of an integrated navigation architecture to support early mission needs with inherent extensibility towards the future.

Evan Anzalone↗

NASA’s Approach to Lunar Communication and Navigation: Artemis and Beyond

NASA’s Space Communications and Navigation (SCaN) program is developing a support structure of networks, partners, and technologies to provide communication, position, navigation, and timing services at the Moon. In this paper, we describe the progress and status of these diverse efforts and the ways in which they will be used during NASA’s crewed lunar exploration program, Artemis. We provide an update on developments at NASA which are targeted to cislunar space, including the Orion Artemis II Optical Communications System (O2O) demonstration mission, planned Lunar Exploration Ground Sites (LEGS) that will offer a dedicated Direct to Earth (DTE) capability servicing the cislunar region, and a recently released RFP for commercial Lunar Communications Relay and Navigation Services as well as Direct to Earth communications capabilities. We also describe the current status and key role of the LunaNet Interoperability Specification (LNIS), a collaborative standards framework developed by NASA, international partner agencies, and commercial stakeholders. A common thread, weaving these efforts together, is the support of commercial enterprises that can meet the Artemis challenge. Together, these projects and activities will enable safe, robust, and reliable communications and position, navigation, and timing (PNT) services for both crewed and uncrewed missions across cislunar space. SCaN and NASA, with our partners, are helping to build the foundation for a long term, sustainable human presence at the Moon –one that will set the stage for similar efforts at Mars.

LunaNet↗

Moon to Mars

This presentation describes aspects of NASA's "Moon to Mars" strategy and architecture. It is being presented at the North Ridgeville Senior Center on October 6, 2022 as a NASA Speakers Bureau event. The presentation includes a brief overview of the NASA Glenn Research Center, goals of the "Moon to Mars" strategy, and high-level descriptions of the Space Launch System, the Orion spacecraft, and the Artemis program.

Moon to Mars↗

An Overview of the Artemis I Navigation Performance

The goal of NASA’s Artemis Program is to explore the Moon and beyond. The Artemis I Mission which flew in late 2022 was the uncrewed test flight whose goal was to exercise the entire navigation system in an extended duration flight and evaluate its performance over the entire mission, from pre-launch to post-landing. This paper provides an overview of the Artemis I navigation system architecture, examines the reasoning behind the design, and showcases the navigation performance. In particular, it presents systems-level performance of the navigation filters, sensors, and fault detection/isolation/recovery (FDIR). Also provided are glimpses into the lessons-learned during the flight, the run-up to the mission, and the post-flight analyses. Of particular interest are the four navigation Extended Kalman Filters (EKFs): the Atmospheric EKF (ATMEKF), the Earth Orbit EKF (EOEKF), the Attitude EKF (ATTEKF) and the Cislunar EKF (CLEKF). Whereas only the ATMEKF is a coupled translation/rotation filter, the other three are either translation-only (EOEKF, CLEKF) or rotation-only (ATTEKF). Also presented is an overview of the Optical Navigation system performance.

Greg N Holt↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

NASA Space Launch System Completes Key Hotfire Test And Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. As directed by the White House in 2019, the agency team is striving to return humans to the Moon and land the first woman and the first person of color on the lunar surface. NASA and its commercial partners made significant progress in the second half of 2020 and the first half of 2021 on the agency’s Space Launch System (SLS), one of the key parts of the Artemis program. The team is preparing for a 2021 launch of Artemis I, the first integrated launch of the Block 1 variant of SLS with the Orion crew capsule. Hardware for the Artemis II launch, which will be the first to launch crew on SLS and Orion, is progressing through assembly, and hardware for Artemis III has started manufacturing. Artemis IV manufacturing has also started, and engines for Artemis V are in development/manufacturing. This paper will discuss the progress made in the last year and the items currently in work on for future SLS flights and variants.

Bruce R Askins↗

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg↗

NASA's Human Lunar Landing Strategy

In response to the 2018 White House Space Policy Directive-1 to lead an innovative and sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit, and 3) conducting the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of systems, NASA is utilizing public-private engagements to develop and demonstrate capabilities that meet the agency’s human space exploration objectives while stimulating the commercial space industry. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs such as the Science Mission Directorate’s Commercial Lunar Payloads Services program and the Space Technology Mission Directorate’s Tipping Point partnerships for Moon and Mars technologies. This paper will discuss the strategic landscape for NASA's exploration campaign, the agency's approach to accessing the lunar surface with an affordable human-rated landing system, current status and role of U.S. industry, and future plans.

Human landing system↗

Extended Kalman Filter Performance on the Artemis-1 Mission

The Artemis Program is NASA’s campaign to explore the Moon and beyond. Artemis-1, the uncrewed exoLEO test flight of the Orion spacecraft, was completed in 2022. There were four navigation Extended Kalman Filters (EKFs) that are part of the Orion navigation system. The Atmospheric Extended Kalman Filter (ATMEKF) estimates the vehicle position, velocity, and attitude (referred to as the vehicle state) during the ascent and entry phases of flight. Once Orion is outside of Earths atmosphere, the Earth Orbit Extended Kalman Filter (EOEKF) and CisLunar Extended Kalman Filter (CLEKF) estimate the translational states, depending on the phase of flight, while the Attitude Extended Kalman Filter (ATTEKF) estimates the rotational state of the vehicle. The Kalman filters propagate the vehicle state forward in time using a combination of dynamics models and the output data from the Inertial Measurement Unit (IMU). The filters update the vehicle states and associated uncertainties, in the form of the covariance matrix, using pseudorange measurements from GPS (in ATMEKF/EOEKF), optical navigation measurements of the Earth or Moon (in CLEKF), and star tracker measurements (in ATTEKF). Simultaneously, the Kalman filters estimate error sources in the sensors, which are included in the state vectors as Exponentially Correlated Random Variables (ECRVs). This paper will summarize the performance of these filters during the Artemis-1 mission.

Artemis-1↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

Trends in Human Spaceflight: Analysis of Observed Propulsion Failure Modes Following NASA’s Artemis I Mission

In 2022, NASA’s Artemis program returned the agency to lunar space, propelled by the Orion European Service Module (ESM). Through rigorous ground test campaigns for Artemis I and II and the collection and transmission of operational data during the Artemis I flight, the Safety and Mission Assurance (S&MA) team created and maintained a robust database of component nonconformances. This study analyzes in-flight and ground processing findings on the Artemis ESM propulsion subsystem to track reliability and safety metrics, as well as comparing the data to that of previous human spaceflight programs, Apollo and Space Shuttle. In drawing a comparison to the Artemis I flight, recommendations can be made for the Artemis II crewed mission to ensure best practices for flight safety, including redundancy and failure tolerance in the system. The results reinforce a need for robust safety standards and caution against the complacency of a single successful test flight.

human spaceflight safety↗

Trends in Human Spaceflight: Analysis of Observed Propulsion Failure Modes Following NASA’s Artemis I Mission

In 2022, NASA’s Artemis program returned the agency to lunar space, propelled by the Orion European Service Module (ESM). Through rigorous ground test campaigns for Artemis I and II and the collection and transmission of operational data during the Artemis I flight, the Safety and Mission Assurance (S&MA) team created and maintained a robust database of component nonconformances. This study analyzes in-flight and ground processing findings on the Artemis ESM propulsion subsystem to track reliability and safety metrics, as well as comparing the data to that of previous human spaceflight programs, Apollo and Space Shuttle. In drawing a comparison to the Artemis I flight, recommendations can be made for the Artemis II crewed mission to ensure best practices for flight safety, including redundancy and failure tolerance in the system. The results reinforce a need for robust safety standards and caution against the complacency of a single successful test flight.

human spaceflight safety↗

Going South: Warnings from the Largest Project Engineering Failure in Modern History

NASA’s successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America’s gift “for all Mankind.” NASA’s Artemis Program to return humanity to the Moon promises to again reveal America’s leadership in this field. In preparation for the initiation of Artemis and its predecessor project Constellation, NASA thoroughly examined space program precedents. There remains, however, another relevant precedent which has not been examined in this context. Though this project involved technology radically different from that managed by NASA, its scope and environment in many ways parallel NASA’s large programs. This project was initiated by a private sector team that had, ten years before, successfully completed an effort that, at a cost of $275 billion (in 2021 USD), had stimulated new technology, had brought economic growth, had established their country as the world leader in engineering innovation, and, though it was a commercial success, had been broadly accepted as their nation’s gift “to all Mankind.” The new project was inspired by popular belief that private capital could again be marshalled to enhance national prestige and make yet another major contribution to the progress of Humanity. This new effort was predicted to require eight years and $258 billion. However, after the passage of nine years, achievement of only 45% complete on the baseline design, and expenditures 96% beyond the baseline cost, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. While the private sector team that carried out this project was exceptionally well educated and experienced in the field, their efforts resulted in what remains (in terms of the money wasted) the largest project engineering failure in modern history. This paper examines what went wrong.

Project Management↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar Base↗

Lunar Base Construction Planning

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews(NASA Apollo program).Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and theEuropean Union of nations, have all expressed interest in either collaborating or competing with NASA on theMoon. This next phase has an overarching goal of achieving a permanent human presence on theMoon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment.Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity(EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers.The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve.In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give ahistorical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in-situ resources.It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Vacuum Sealable Container (VSC) and Astronaut Lunar Drill (ALD) for Artemis

Introduction: NASA’s Artemis Program is under development to send first woman and next man to the Moon. Artemis will utilize a suite of new technology for Lunar exploration, including new space vehicles, new space suits, and new Astronaut Tools. Honeybee Robotics has been working with NASA JSC to develop a new Vacuum Sealable Container (VSC) and new Astronaut Lunar Drill (ALD) for the upcoming Artemis missions. Vacuum Sealable Container: Sample return continues to be the “Holy Grail” of space exploration, allowing for the analysis of materials using Earth-based laboratories instead of needing to miniaturize and ruggedize instrumentation for space. The Apollo missions to the Moon had several kinds of Sealable Containers which brought back Lunar samples for analysis [1]. These samples are still being analyzed, fifty years later. The VSC requirements are different from that for Apollo containers and as such, new development was required. One major difference between Artemis samples and those from Apollo is the desire to bring back volatiles which may be part of lunar regolith. The VSC is designed to withstand a high-pressure differential caused by sublimating volatiles. Because of the new, stricter sealing requirements, additional features have been added to the VSC. For example, the seal on the container is required to be more robust, thus required more force to actuate, and the seal must be locked in place with a secondary mechanism. Astronaut Lunar Drill: The ALD is designed to be a multi-functional platform for Lunar sample acquisition. The drill builds on lessons learned from the Apollo Lunar Surface Drill (ALSD), as well as Honeybee’s long history of mechanized sample acquisition devices for space [2]. The main functionality of the ALD is Deep Core Regolith Drilling. Additional functionality includes Surface Rock Coring (SRC), and GeoTech Tools (GTT). The ALD is a rotary-percussive drill designed with deep drilling in mind. The ALD is currently designed to have decoupled rotary and percussion subsystems to allow for maximum battery life and reduced fatigue on the crewmember. Honeybee drill technology will automatically engage the percussion when needed to drill at maximum efficiency. The mechanized drill stand helps improve drilling efficiency; the system utilizes advanced drilling algorithms which only require the crewmember to hold a single switch. Additionally, the stand aids in extraction of deep cores, something which was a problem on Apollo. The SRC functionality of the ALD utilizes Honeybee’s Eccentric Tube Core Breakoff technology to collect and retain rock core samples. This technology has also been infused into the Perseverance rover mission. The ALD is removable from the stand to allow crewmembers to collect samples from large boulders. Bringing back rock cores samples instead of full rocks allows for a wider variety of samples to be returned to Earth for study and puts them in a uniform form-factor for effective sealing and analysis. SRC bits will utilize the power of the drill’s percussion system to drill hard Lunar rocks and expedite sample acquisition. The mechanized stand on the ALD allows for additional attachments for taking geotechnical measurements with a Static Cone Penetrometer (SCP) and a Shear Vane (SV). With the stand, the ALD can take SCP measurements with the touch of a button, storing data for return to Earth. SV measurements utilize the ALD’s Rotary motor to spin the vanes in a controlled manner, getting clean data untampered by human error. References: [1] Bar Cohen and Zacny (2009), Drilling in Extreme Environments - Penetration and Sampling on Earth and Other Planets, Wiley. [2] Bar-Cohen and Zacny, Advances in Terrestrial and Extraterrestrial Drilling, CRC Press. [3] Myrick (2003), Core Break-off Mechanism. US Patent No. 6,550,549 Acknowledgements: This work has been supported by NASA via SBIR Phase 3.

Artemis↗