Search NASA⌕ Search

SEARCH · Search NASA

Results for “CDR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

System Engineering on the Use for Ares I,V - the Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt & Whitney Rocketdyne Company. The J-2X is an improved higher power version of the original J-2 engine used during the Apollo program. With higher power and updated requirements for safety and performance, the J-2X becomes a new engine using state-of-the-art design methodology, materials and manufacturing processes. The implementation of Systems Engineering (SE) principles enables the rapid J-2X development program to remain aligned with the ARES I and V vehicle programs, Meeting the aggressive development schedule is a challenge. Coordinating the best expertise thai NASA and PWR have to offer requires effectively utilizing resources at multiple sites. This presents formidable communication challenges. SE allows honest and open discussions of issues and problems. This simple idea is often overlooked in large and complex SE programs. Regular and effective meetings linking SE objectives to component designs are used to voice differences of opinions with customer and contractor in attendance so that the best mutual decisions can be made on the shortest possible schedule. Regular technical interchange meetings on secure program wide computer networks and CM processes are effective,in the "Controlled Change" process that exemplifies good SE. Good communication is a key effective SE implementation. The System of Systems approach is the vision of the Orion program which facilitates the establishment of dynamic SE processes at all levels including the engine. SE enables requirements evolution by facilitating organizational and process agility. Flow down and distribution of requirements is controlled by Allocation Reports which breakdown numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements helps eliminate redundancy and potential mistakes inherent m separated systems. Another tool, the Architecture Design Description, is being used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof is in successful program accomplishment. The SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. The Ares I SE system of systems has delivered according to expectations thus far. All major design reviews (SRR. PDR, CDR) have been successfully conducted to satisfy overall program objectives using SE as the basis for accomplishment. The paper describes SE tools and techniques utilized to achieve this success.

Kelly, William↗

Ares I-X Overview - The First Chapter in the Next Great Adventure

Ares I-X is the first flight of NASA's new Constellation Program. Ares I-X is a development test flight to provide engineering data to inform the design of the Ares I prior to CDR. Ares I will replace the Space Shuttle which is scheduled for 2010 retirement . Ares I-X is an uncrewed, sub-orbital development flight test . Ares I-X will provide opportunity to test ground facilities and operations at NASA's Kennedy Space Center. Ares I-X is on track for May 2009 launch date. Objectives include: (1) Demonstrate control of a dynamically similar, integrated Ares I/Orion, using Ares I relevant ascent control algorithms; (2) Perform an in-flight separation/staging event between a Ares I-similar First Stage and a representative Upper Stage; (3) Demonstrate assembly and recovery of a new Ares I-like First Stage element at KSC; (4) Demonstrate First Stage separation sequencing, and quantify First Stage atmospheric entry dynamics, and parachute performance; and (5) Characterize magnitude of integrated vehicle roll torque throughout First Stage flight.

Leahy, Bart↗

A Reference Model for Software and System Inspections. White Paper

Software Quality Assurance (SQA) is an important component of the software development process. SQA processes provide assurance that the software products and processes in the project life cycle conform to their specified requirements by planning, enacting, and performing a set of activities to provide adequate confidence that quality is being built into the software. Typical techniques include: (1) Testing (2) Simulation (3) Model checking (4) Symbolic execution (5) Management reviews (6) Technical reviews (7) Inspections (8) Walk-throughs (9) Audits (10) Analysis (complexity analysis, control flow analysis, algorithmic analysis) (11) Formal method Our work over the last few years has resulted in substantial knowledge about SQA techniques, especially the areas of technical reviews and inspections. But can we apply the same QA techniques to the system development process? If yes, what kind of tailoring do we need before applying them in the system engineering context? If not, what types of QA techniques are actually used at system level? And, is there any room for improvement.) After a brief examination of the system engineering literature (especially focused on NASA and DoD guidance) we found that: (1) System and software development process interact with each other at different phases through development life cycle (2) Reviews are emphasized in both system and software development. (Figl.3). For some reviews (e.g. SRR, PDR, CDR), there are both system versions and software versions. (3) Analysis techniques are emphasized (e.g. Fault Tree Analysis, Preliminary Hazard Analysis) and some details are given about how to apply them. (4) Reviews are expected to use the outputs of the analysis techniques. In other words, these particular analyses are usually conducted in preparation for (before) reviews. The goal of our work is to explore the interaction between the Quality Assurance (QA) techniques at the system level and the software level.

He, Lulu↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration (NASA) initiated plans to develop the Ares I and Ares V launch vehicles in 2005 to meet the mission objectives for future human exploration of space. Ares I is designed to provide the capability to deliver the Orion crew exploration vehicle (CEV) to low-Earth orbit (LEO), either for docking to the International Space Station (ISS) or docking with an Earth departure stage (EDS) and lunar lander for transit to the Moon. Ares V provides the heavy-lift capability to deliver the EDS and lunar lander to orbit. An integrated test plan was developed for Ares I that includes un-crewed flight validation testing and ground testing to qualify structural components and propulsion systems prior to operational deployment. The overall test program also includes a single development test flight conducted prior to the Ares I critical design review (CDR). Since the Ares V concept was formulated to maximize hardware commonality between the Ares V and Ares I launch vehicles, initial test planning for Ares V has considered the extensibility of test approaches and facilities from Ares I. The Ares V test plan was part of a successful mission concept review (MCR) in 2008.

Cockrell, Charles E.↗

Testing for the J-2X Upper Stage Engine

NASA selected the J-2X Upper Stage Engine in 2006 to power the upper stages of the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Based on the proven Saturn J-2 engine, this new engine will provide 294,000 pounds of thrust and a specific impulse of 448 seconds, making it the most efficient gas generator cycle engine in history. The engine's guiding philosophy emerged from the Exploration Systems Architecture Study (ESAS) in 2005. Goals established then called for vehicles and components based, where feasible, on proven hardware from the Space Shuttle, commercial, and other programs, to perform the mission and provide an order of magnitude greater safety. Since that time, the team has made unprecedented progress. Ahead of the other elements of the Constellation Program architecture, the team has progressed through System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of February 2010, more than 100,000 development engine parts have been ordered and more than 18,000 delivered. Approximately 1,300 of more than 1,600 engine drawings were released for manufacturing. A major factor in the J-2X development approach to this point is testing operations of heritage J-2 engine hardware and new J-2X components to understand heritage performance, validate computer modeling of development components, mitigate risk early in development, and inform design trades. This testing has been performed both by NASA and its J-2X prime contractor, Pratt & Whitney Rocketdyne (PWR). This body of work increases the likelihood of success as the team prepares for testing the J-2X powerpack and first development engine in calendar 2011. This paper will provide highlights of J-2X testing operations, engine test facilities, development hardware, and plans.

Buzzell, James C.↗

From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

In 2006, NASA selected an evolved variant of the proven Saturn/Apollo J-2 upper stage engine to power the Ares I crew launch vehicle upper stage and the Ares V cargo launch vehicle Earth departure stage (EDS) for the Constellation Program. Any design changes needed by the new engine would be based where possible on proven hardware from the Space Shuttle, commercial launchers, and other programs. In addition to the thrust and efficiency requirements needed for the Constellation reference missions, it would be an order of magnitude safer than past engines. It required the J-2X government/industry team to develop the highest performance engine of its type in history and develop it for use in two vehicles for two different missions. In the attempt to achieve these goals in the past five years, the Upper Stage Engine team has made significant progress, successfully passing System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of spring 2010, more than 100,000 experimental and development engine parts have been completed or are in various stages of manufacture. Approximately 1,300 of more than 1,600 engine drawings have been released for manufacturing. This progress has been due to a combination of factors: the heritage hardware starting point, advanced computer analysis, and early heritage and development component testing to understand performance, validate computer modeling, and inform design trades. This work will increase the odds of success as engine team prepares for powerpack and development engine hot fire testing in calendar 2011. This paper will provide an overview of the engine development program and progress to date.

Kynard, Mike↗

From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

The NASA/industry team responsible for developing the J-2X Upper Stage Engine for the Constellation Program's Ares I and Ares V launch vehicles has made significant progress toward moving the design from paper to production during the past year. The J-2X exemplifies the Constellation goal of using proven technology and experience from more than 50 years of United States spaceflight experience and seeking where possible to employ common hardware in the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The J-2X will power the Ares I upper stage to place the Orion crew vehicle in orbit. For the Ares V, the J-2X will place the Earth departure stage (EDS) and lunar lander in orbit and later re-start to send the Orion and lander to the Moon. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J-2X employs a gas generator operating cycle designed to produce 294,000 pounds of thrust in primary operating mode for the Ares I and Ares V ascent phases. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio to perform the TLI burn for the Ares V lunar sortie and lunar cargo missions. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. The team is working toward a first flight of the J-2X on the Orion 1 mission in 2014. This paper will discuss the J-2X development background and provide top-level information on design and testing to date. Details will be provided on overcoming challenges such as gas generator instability, turbine blade life, and nozzle extension selection and materials.

Kynard, Mike↗

CERES FM-5 on the NPP Spacecraft: Continuing the Earth Radiation Budget Climate Data Record

The Clouds and the Earth's Radiant Energy System (CERES) Flight Model-5 (FM-5) instrument will fly on the NPOESS Preparatory Project (NPP) spacecraft, which has a launch-readiness date in June, 2010. This mission will continue the critical Earth Radiation Budget Climate Data Record (CDR) begun by the Earth Radiation Budget Experiment (ERBE) instruments in the mid 1980 s and continued by the CERES instruments currently flying on the EOS Terra and Aqua spacecraft. Ground calibrations have been completed for FM-5 and the instrument has been delivered for integration to the spacecraft Rigorous pre-launch ground calibration is performed on each CERES unit to achieve an accuracy goal of 1% for SW flux and 0.5% for outgoing LW flux. Any ground to flight or in-flight changes in radiometer response is monitored using a protocol employing both onboard and vicarious calibration sources and experiments. Recent studies of FM-1 through FM-4 data have shown that the SW response of space based broadband radiometers can change dramatically due to optical contamination. With these changes having most impact on optical response to blue-to UV radiance, where tungsten lamps are largely devoid of output, such changes are hard to monitor accurately using existing on-board sources. This paper outlines the lessons learned on the existing CERES sensors from 30+ years of flight experience and presents a radiometric protocol to be implemented on the FM-5 instrument to ensure that its performance exceeds the stated calibration and stability goals.

Priestly, Kory↗

CASTOR: Cathode/Anode Satellite Thruster for Orbital Repositioning

The purpose of CASTOR (Cathode/Anode Satellite Thruster for Orbital Repositioning) satellite is to demonstrate in Low Earth Orbit (LEO) a nanosatellite that uses a Divergent Cusped Field Thruster (DCFT) to perform orbital maneuvers representative of an orbital transfer vehicle. Powered by semi-deployable solar arrays generating 165W of power, CASTOR will achieve nearly 1 km/s of velocity increment over one year. As a technology demonstration mission, success of CASTOR in LEO will pave the way for a low cost, high delta-V orbital transfer capability for small military and civilian payloads in support of Air Force and NASA missions. The educational objective is to engage graduate and undergraduate students in critical roles in the design, development, test, carrier integration and on-orbit operations of CASTOR as a supplement to their curricular activities. This program is laying the foundation for a long-term satellite construction program at MIT. The satellite is being designed as a part of AFRL's University Nanosatellite Program, which provides the funding and a framework in which student satellite teams compete for a launch to orbit. To this end, the satellite must fit within an envelope of 50cmx50cmx60cm, have a mass of less than 50kg, and meet stringent structural and other requirements. In this framework, the CASTOR team successfully completed PDR in August 2009 and CDR in April 2010 and will compete at FCR (Flight Competition Review) in January 2011. The complexity of the project requires implementation of many systems engineering techniques which allow for development of CASTOR from conception through FCR and encompass the full design, fabrication, and testing process.

Mruphy, Gloria A.↗

Accelerating NASA GN&C Flight Software Development

When the guidance, navigation, and control (GN&C) system for the Orion crew vehicle undergoes Critical Design Review (CDR), more than 90% of the flight software will already be developed - a first for NASA on a project of this scope and complexity. This achievement is due in large part to a new development approach using Model-Based Design.

Tamblyn, Scott↗

Future Flight Opportunities and Calibration Protocols for CERES: Continuation of Observations in Support of the Long-Term Earth Radiation Budget Climate Data Record

The goal of the Clouds and the Earth s Radiant Energy System (CERES) project is to provide a long-term record of radiation budget at the top-of-atmosphere (TOA), within the atmosphere, and at the surface with consistent cloud and aerosol properties at climate accuracy. CERES consists of an integrated instrument-algorithm validation science team that provides development of higher-level products (Levels 1-3) and investigations. It involves a high level of data fusion, merging inputs from 25 unique input data sources to produce 18 CERES data products. Over 90% of the CERES data product volume involves two or more instruments. Continuation of the Earth Radiation Budget (ERB) Climate Data Record (CDR) has been identified as critical in the 2007 NRC Decadal Survey, the Global Climate Observing System WCRP report, and in an assessment titled Impacts of NPOESS Nunn-McCurdy Certification on Joint NASA-NOAA Climate Goals . Five CERES instruments have flown on three different spacecraft: TRMM, EOS-Terra and EOS-Aqua. In response, NASA, NOAA and NPOESS have agreed to fly the existing CERES Flight Model (FM-5) on the NPP spacecraft in 2011 and to procure an additional CERES Sensor with modest upgrades for flight on the JPSS C1 spacecraft in 2014, followed by a CERES follow-on sensor for flight in 2018. CERES is a scanning broadband radiometer that measures filtered radiance in the SW (0.3-5 m), total (TOT) (0.3-200 m) and WN (8-12 m) regions. Pre-launch calibration is performed on each Flight Model to meet accuracy requirements of 1% for SW and 0.5% for outgoing LW observations. Ground to flight or in-flight changes are monitored using protocols employing onboard and vicarious calibration sources. Studies of flight data show that SW response can change dramatically due to optical contamination. with greatest impact in blue-to UV radiance, where tungsten lamps are largely devoid of output. While science goals remain unchanged for ERB Climate Data Record, it is now understood that achieving these goals is more difficult for two reasons. The first is an increased understanding of the dynamics of the Earth/atmosphere system which demonstrates that separation of natural variability from anthropogenic change on decadal time scales requires observations with higher accuracy and stabilit

Priestley, Kory J.↗

Liquid Oxygen/Liquid Methane Integrated Propulsion System Test Bed

In support of NASA?s Propulsion and Cryogenic Advanced Development (PCAD) project, a liquid oxygen (LO2)/liquid methane (LCH4) Integrated Propulsion System Test Bed (IPSTB) was designed and advanced to the Critical Design Review (CDR) stage at the Johnson Space Center. The IPSTB?s primary objectives are to study LO2/LCH4 propulsion system steady state and transient performance, operational characteristics and to validate fluid and thermal models of a LO2/LCH4 propulsion system for use in future flight design work. Two phase thermal and dynamic fluid flow models of the IPSTB were built to predict the system performance characteristics under a variety of operating modes and to aid in the overall system design work. While at ambient temperature and simulated altitude conditions at the White Sands Test Facility, the IPSTB and its approximately 600 channels of system instrumentation would be operated to perform a variety of integrated main engine and reaction control engine hot fire tests. The pressure, temperature, and flow rate data collected during this testing would then be used to validate the analytical models of the IPSTB?s thermal and dynamic fluid flow performance. An overview of the IPSTB design and analytical model development will be presented.

Flynn, Howard↗

Lunar Wormbot: Design and Development of a Ground Base Robotic Tunneling Worm for Operation in Harsh Environments

From 1969 to 1972, the National Aeronautics and Space Administration (NASA) sent Apollo missions to the moon to conduct various exploration experiment. A few of the missions were directed to the study and sampling of moon soil, otherwise known as lunar regolith. The extent of the sample acquisition was limited due to the astronauts' limited ability to penetrate the moon's surface to a depth greater than three meters. However. the samples obtained were sufficient enough to provide key information pertaining to lunar regolith material properties that would further assist in future exploration endeavors. Analysis of the collected samples showed that the properties of lunar regolith may lead to knowledge of processed materials that will be beneficial for future human exploration or colonization. However, almost 40 years after the last Apollo mission, limited infonnation is known about regions underneath the moon's surface. Future lunar missions will require hardware that possesses the ability to burrow to greater depths in order to collect samples for subsequent analysis. During the summer of 2010, a team (Dr. Jessica Gaskin, Michael Kuhlman. Blaze Sanders, and Lafe Zabowski) from the NASA Robotics Academy at Marshall Space Flight Center (MSFC) was given the task of designing a robot to function as a soil collection and analysis device. Working with the National Space Science and Technology Center (NSSTC), the team was able to propose an initial design, build a prototype, and test the various subsystems of the prototype to be known as the "Lunar Wormbot" (LW). The NASA/NSSTC team then transferred the project to a University of Alabama in Huntsville (UAH) Mechanical and Aerospace Engineering (MAE) senior design class for further development. The UAH team was to utilize the NASA Systems Engineering Engine Design Process in the continuance of the Lunar Wormbot project. This process was implemented in order to coordinate the efforts of the team and guide the design of the project to ensure a high quality product that met requirements within the academic year timeframe. When the transition from the NASA NSSTC team to the UAH team occurred in August 2010, the scope and requirements were provided to the UAH team. The main objective for the UAH team was to design and fabricate a robotic burrowing prototype using peristaltic or earthworm-like motion with the purpose of collecting soil samples. The team was tasked with the design of a sub-system of the LW called the locomotive, or active, segment. Through the design process, the team extensively reviewed the requirements and functions to be performed of the LW, which led to the proposal of a final design. The present paper provides the details of the development of the design up to and including the Critical Design Review (CDR) of the Lunar Wormbot. This document briefly describes thc overall system and its function but primarily focuses on the design and implementation of the locomotive segment. Content presented includes: general design and system functionality, technical drawings, system analysis, manufacturing methods, and general project costs.

Boyles, Charles↗

Use and Limitations of a Climate-Quality Data Record to Study Temperature Trends on the Greenland Ice Sheet

Enhanced melting of the Greenland Ice Sheet has been documented in recent literature along with surface-temperature increases measured using infrared satellite data since 1981. Using a recently-developed climate-quality data record, 11- and 12-year trends in the clear-sky ice-surface temperature (IST) of the Greenland Ice Sheet have been studied using the Moderate-Resolution Imaging Spectroradiometer (MODIS) IST product. Daily and monthly MODIS ISTs of the Greenland Ice Sheet beginning on 1 March 2000 and continuing through 31 December 2010 are now available at 6.25-km spatial resolution on a polar stereographic grid as described in Hall et al. (submitted). This record will be elevated in status to a climate-data record (CDR) when more years of data become available either from the MODIS on the Terra or Aqua satellites, or from the Visible Infrared Imager Radiometer Suite (VIIRS) to be launched in October 2011. Maps showing the maximum extent of melt for the entire ice sheet and for the six major drainage basins have been developed from the MODIS IST dataset. Twelve-year trends of the duration of the melt season on the ice sheet vary in different drainage basins with some basins melting progressively earlier over the course of the study period. Some (but not all) of the basins also show a progressively-longer duration of melt. IST 12-year trends are compared with in-situ data, and climate data from the Modern Era Retrospective-Analysis for Research and Applications (MERRA) Reanalysis.

Hall, Dorothy K.↗

Radiation-Hard SpaceWire/Gigabit Ethernet-Compatible Transponder

A radiation-hard transponder was developed utilizing submicron/nanotechnology from IBM. The device consumes low power and has a low fabrication cost. This device utilizes a Plug-and-Play concept, and can be integrated into intra-satellite networks, supporting SpaceWire and Gigabit Ethernet I/O. A space-qualified, 100-pin package also was developed, allowing space-qualified (class K) transponders to be delivered within a six-month time frame. The novel, optical, radiation-tolerant transponder was implemented as a standalone board, containing the transponder ASIC (application specific integrated circuit) and optical module, with an FPGA (field-programmable gate array) friendly parallel interface. It features improved radiation tolerance; high-data-rate, low-power consumption; and advanced functionality. The transponder utilizes a patented current mode logic library of radiation-hardened-by-architecture cells. The transponder was developed, fabricated, and radhard tested up to 1 MRad. It was fabricated using 90-nm CMOS (complementary metal oxide semiconductor) 9 SF process from IBM, and incorporates full BIT circuitry, allowing a loop back test. The low-speed parallel LVCMOS (lowvoltage complementary metal oxide semiconductor) bus is compatible with Actel FPGA. The output LVDS (low-voltage differential signaling) interface operates up to 1.5 Gb/s. Built-in CDR (clock-data recovery) circuitry provides robust synchronization and incorporates two alarm signals such as synch loss and signal loss. The ultra-linear peak detector scheme allows on-line control of the amplitude of the input signal. Power consumption is less than 300 mW. The developed transponder with a 1.25 Gb/s serial data rate incorporates a 10-to-1 serializer with an internal clock multiplication unit and a 10-1 deserializer with internal clock and data recovery block, which can operate with 8B10B encoded signals. Three loop-back test modes are provided to facilitate the built-in-test functionality. The design is based on a proprietary library of differential current switching logic cells implemented in the standard 90-nm CMOS 9SF technology from IBM. The proprietary low-power LVDS physical interface is fully compatible with the SpaceWire standard, and can be directly connected to the SFP MSA (small form factor pluggable Multiple Source Agreement) optical transponder. The low-speed parallel interfaces are fully compatible with the standard 1.8 V CMOS input/output devices. The utilized proprietary annular CMOS layout structures provide TID tolerance above 1.2 MRad. The complete chip consumes less than 150 mW of power from a single 1.8-V positive supply source.

Katzman, Vladimir↗

From Paper to Production to Test: An Update on NASA's J-2X Engine for Exploration

The NASA/industry team responsible for developing the J-2X upper stage engine for the Space Launch System (SLS) Program has made significant progress toward moving beyond the design phase and into production, assembly, and test of development hardware. The J-2X engine exemplifies the SLS Program goal of using proven technology and experience from more than 50 years of United States spaceflight experience combined with modern manufacturing processes and approaches. It will power the second stage of the fully evolved SLS Program launch vehicle that will enable a return to human exploration of space beyond low earth orbit. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J- 2X employs a gas generator operating cycle designed to produce 294,000 pounds of vacuum thrust in primary operating mode with its full nozzle extension. With a truncated nozzle extension suitable to support engine clustering on the stage, the nominal vacuum thrust level in primary mode is 285,000 pounds. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. Assembly of the first development engine was completed in May 2011 and the first engine test was conducted at the NASA Stennis Space Center (SSC), test stand A2, on 14 July 2011. Testing of the first development engine will continue through the autumn of 2011, be paused for test stand modifications to the passive diffuser, and then restart in the spring of 2012. This testing will be followed by specialized powerpack testing intended to examine the design and operating margins of the engine turbomachinery. The development plan beyond this point leads through more system-level, engine testing of several samples, analytical model validation activities, functional and performance verification, and then ultimate certification to support human spaceflight. This paper will discuss the J-2X development background, provide top-level information on design and development planning, and will explore some of the development challenges and mitigation activities pursued to date.

Kynard, Michael↗

DRAGONS - A Micrometeoroid and Orbital Debris Impact Sensor

The Debris Resistive/Acoustic Grid Orbital Navy Sensor (DRAGONS) is intended to be a large area impact sensor for in-situ measurements of micrometeoroids and orbital debris (MMOD) in the approx.0.2 to 1 mm size regime. These MMOD particles are too small to be detected by groundbased radars and optical telescopes, but still large enough to be a safety concern for human space activities and robotic missions in the low Earth orbit (LEO) region. The nominal detection area of DRAGONS is 1 sq m, consisting of four 0.5 m x 0.5 m independently operated panels. The concept of the DRAGONS design is to combine three different detection technologies to maximize information extracted from each detected impact. The first technology is a resistive grid consisting of 62.5-microns-wide resistive lines, coated in parallel and separated by 62.5 micron gaps on a Kapton film. When a particle a few hundred micrometers or larger strikes the grid, it world penetrate the film and sever some resistive lines. The size of the damage area can be estimated from the increased resistance. The second technology employs a dual-layer, 25-microns-thick Kapton film with a 10 cm separation. By measuring the time difference between impacts on the two films, the impact speed can be calculated. The third technology is based on polyvinylidene fluoride (PVDF) acoustic impact sensors. Multiple PVDF sensors are attached to the backside of both Kapton films to provide impact timing measurements. The impact location on each film can be identified from the triangulation of signals received at different PVDF sensors and provides an estimate of the impact direction. The development of DRAGONS is supported by the NASA Orbital Debris Program Office. The project is led by the U.S. Naval Academy (USNA), with additional collaboration from the U.S. Naval Research Laboratory (NRL), the University of Kent at Canterbury in Great Britain, and Virginia Tech (VT). The short-term goal of DRAGONS is to advance its Technology Readiness Level to 9 and to demonstrate the system capabilities of detecting and characterizing submillimeter MMOD impacts. The long-term goal is to deploy a large detection area (>1 sq m) DRAGONS to 700-1000 km altitude and collect sufficient data for better environment definition of MMOD in the 0.2- to 1-mm size regime. The Preliminary Design Review (PRD) of DRAGONS was held at the USNA in June 2012. The Critical Design Review (CDR) is scheduled for early 2013. A flight-ready unit with a 0.25 sq m detection area will be completed and tested by the end of September 2013. The biggest challenge for the project, however, is to identify a demonstration opportunity on the International Space Station in the coming years.

Liou, J. C.↗

Suomi NPP VIIRS Ocean Color Data Product Early Mission Assessment

Following the launch of the Visible Infrared Imaging Radiometer Suite (VIIRS) aboard the Suomi National Polarorbiting Partnership (NPP) spacecraft, the NASA NPP VIIRS Ocean Science Team (VOST) began an evaluation of ocean color data products to determine whether they could continue the existing NASA ocean color climate data record (CDR). The VOST developed an independent evaluation product based on NASA algorithms with a reprocessing capability. Here we present a preliminary assessment of both the operational ocean color data products and the NASA evaluation data products regarding their applicability to NASA science objectives.

NPP↗