Current status of permanent magnet radiation resiliency studies at CEBAF

One possible future for Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) lies in upgrading its maximum nominal energy using Fixed-Field Alternating-gradient (FFA) technology for its recirculating arcs. The current proposal aims to use permanent magnets to supply the fixed fields. One concern among reviewers is the degradation of these permanent magnets during operation due to the radiation environment in which they will be present. This work, funded by a Laboratory Directed R&D grant, aims to measure the magnet degradation in the CEBAF tunnel enclosure, and extrapolate to the energies expected from the upgrade. We present the latest results of this study, as well as plans moving forward.

Accelerator Physics↗

An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Accelerator Physics↗

PARTICULATE STUDY OF NEG PUMPS IRRADIATED IN THE CEBAF TUNNEL

Non-evaporable getter (NEG) pumps are being used to maintain ultra-high vacuum in the beamline of superconducting radio-frequency (SRF) accelerators, such as the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Because of the sensitivity of the performance of SRF cavities to particulate contamination, it is important to evaluate the integrity of the NEG material after exposure to high radiation during beam operation. The particulate from two NEG pumps based on ZAO® getter alloy was measured with a particle counter in a clean-room. The pumps were assembled onto a hermetically sealed setup which was placed in the CEBAF tunnel. The setup was exposed to 24 h beam operation for ~ 230 days. The total gamma-rays dose measured on the test setup was ~ 1.6 Mrad. The total neutron dose measured at ~ 75 cm of the test setup was ~ 11 krad. The particulate count from the two pumps was measured again in the clean-room after irradiation. Whereas an increase of particulate counts was measured, compared to before irradiation, subsequent measurements indicate the absence of systematically loose particulate. The pumping speed of one of the irradiated pumps was also measured to be consistent with that of a non-irradiated one, corroborating the absence of significant damage to the ZAO® NEG material due to irradiation.

Ciovati, G. [Thomas Jefferson National Accelerator↗

FFA BEAM TRANSPORT DEMONSTRATION DEVELOPMENT FOR THE CEBAF 22 GeV UPGRADE

Jefferson Lab is planning an upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) to deliver highly polarized electron beams up to 22 GeV using Fixed- Field Alternating-gradient (FFA) magnets. As the application of FFA technology in the 10–22 GeV energy range is unprecedented, experimental validation is required prior to full-scale implementation. To support this effort, a dedicated FFA test insert is proposed within the existing CEBAF infrastructure, with candidate locations in the Beam Switchyard (BSY) dump line or the Hall C beamline. The testbed will consist of a half or full FFA cell using combined-function permanent magnets and will enable systematic studies of beam transport, field quality, alignment, and magnet performance under realistic conditions. Operation with polarized beams in the 5–11 GeV range will closely replicate the energy scaling of the full upgrade. This paper presents the current design status and layout options for the proposed FFA beam transport test line.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Status Update of Permanent Magnet Radiation Resiliency Studies at CEBAF

The proposed energy upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) incorporates Fixed-Field Alternating-gradient (FFA) arcs utilizing permanent magnet technology. Given the radiation environment within the CEBAF tunnel enclosure, validating the long-term magnetic stability of these materials is a critical step for the project's technical feasibility. This contribution presents an overview of the ongoing permanent magnet radiation resiliency program at Jefferson Lab. We briefly review the experimental methodology used to monitor demagnetization in situ and summarize the operational experience from the initial data-taking campaign. Furthermore, we discuss the upgrades implemented for the second exposure campaign, currently underway, which aims to refine dose correlation and reduce systematic uncertainties. We report on the general status of the program and the roadmap for certifying permanent magnet optics for the proposed upgrade energies.

Bodenstein, R. [Thomas Jefferson National Accelera↗

OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

CEBAF Photo Gun RF System

During the CEBAF 12 GeV Upgrade at Jefferson Lab, a fourth experimental hall, ?D?, was added to the existing three halls. To produce four beams and deliver them to all halls concurrently requires new frequencies and a new timing pattern of the electron bunches. Since a photo-gun is used to produce electron bunches, the gun?s drive laser pulses need to be synchronized with the required bunch rate frequencies of 499 MHz or 249.5 MHz. To meet these new operational requirements, the new LLRF system has been proposed. Very specific requirements (dual frequency operation) on one side and the simple RF drive mode operation on the other imply the use of a commercial off-the-shelf digital platform rather than a system typical for RF cavity field control. We have chosen the Texas Instruments FPGA board along with a high-speed 8-Channel, 14-Bit board, and a 4-Channel, 16-Bit board. The DAC board includes the clock generator for clocking ADCs, DACs and the FPGA. The only custom design section of the system is the RF Front End board. The complete Gun Laser LLRF system has been designed, built, and recently commissioned in the CEBAF Injector. This paper will detail the design and report on commissioning activities.

Plawski, Tomasz↗

Real-Time Cavity Fault Prediction in CEBAF Using Deep Learning

Data-dri­ven pre­dic­tion of fu­ture faults is a major re­search area for many in­dus­trial ap­pli­ca­tions. In this work, we pre­sent a new pro­ce­dure of real-time fault pre­dic­tion for su­per­con­duct­ing ra­dio-fre­quency (SRF) cav­i­ties at the Con­tin­u­ous Elec­tron Beam Ac­cel­er­a­tor Fa­cil­ity (CEBAF) using deep learn­ing. CEBAF has been af­flicted by fre­quent down­time caused by SRF cav­ity faults. We per­form fault pre­dic­tion using pre-fault RF sig­nals from C100-type cry­omod­ules. Using the pre-fault sig­nal in­for­ma­tion, the new al­go­rithm pre­dicts the type of cav­ity fault be­fore the ac­tual onset. The early pre­dic­tion may en­able po­ten­tial mit­i­ga­tion strate­gies to pre­vent the fault. In our work, we apply a two-stage fault pre­dic­tion pipeline. In the first stage, a model dis­tin­guishes be­tween faulty and nor­mal sig­nals using a U-Net deep learn­ing ar­chi­tec­ture. In the sec­ond stage of the net­work, sig­nals flagged as faulty by the first model are clas­si­fied into one of seven fault types based on learned sig­na­tures in the data. Ini­tial re­sults show that our model can suc­cess­fully pre­dict most fault types 200 ms be­fore onset. We will dis­cuss rea­sons for poor model per­for­mance on spe­cific fault types.

Rahman, M.↗

Final design and first use of in-situ measuring apparatus for measurement of permanent magnet resiliency in CEBAF’s radiation environment

In this work we outline the final design and initial measurement lessons for the holders and measuring apparatus of the permanent magnet resiliency experiment which is a part of the FFA@CEBAF proposed upgrade. The experiment will expose permanent magnets to the radiation environment of CEBAF. Due to safety regulations we need to measure the magnets in the tunnel without bringing them out, so we designed a mobile measuring system as well as a series of protocols to allow us to speedily measure these samples even under adverse conditions. We also designed our system to be capable of taking measurements even with component failures.

Accelerator Physics↗

Upgraded cavities for the CEBAF cryomodule rework program

The CEBAF cryomodule rework program has been a successful tool to recover and maintain the energy reach of the original baseline 6 GeV accelerator. The weakest original modules with eight five-cell cavities assembled in four ?pairs?, with a specification when new of 20 MV per cryomodule (5 MV/m), are disassembled, re-cleaned with modern techniques and re-qualified to at least 50 MV (12.5 MV/m), (leading to the acronym ?C50?). The cost per recovered MV is much less than building new modules. However over time the stock of weak modules is being used up and the voltage gain per rework cycle is diminishing. In an attempt to increase the gain per cycle it is proposed to rework the cavities by replacing the original accelerating cells with new ones of an improved shape and better material. The original CEBAF HOM and FPC end groups are retained. The goal is to achieve up to 75 MV (18.75 MV/m) for the reworked module (?C75?). We report on the fabrication experience and test results of the first trial pair, containing two such reworked cavities.

Rimmer, Robert↗

Cavity Production and Testing of the First C75 Cryomodule for CEBAF

The CEBAF cryomodule rework program was updated over the last few years to increase the energy gain of refurbished cryomodules to 75 MeV. The concept recycles the waveguide end-groups from original CEBAF cavities fabricated in the 1990s and replaces the five elliptical cells in each with a new optimized cell shape fabricated from large-grain, ingot Nb material. Eight cavities were fabricated at Research Instruments, Germany, and two cavities were built at Jefferson Lab. Each cavity was processed by electropolishing and tested at 2.07 K. The best eight cavities were assembled into ’cavity pairs’ and re-tested at 2.07 K, before assembly into the cryomodule. All but one cavity in the cryomodule were within 10% of the target accelerating gradient of 19 MV/m with a quality factor of 8·10⁹. The performance limitations were field emission and multipacting.

Ciovati, G.↗

Copper plating qualification process for the fundamental power coupler waveguides for CEBAF cryomodules

To provide sufficient energy for CEBAF operation, cryomodules and components are being refurbished yearly as necessary. Copper plated fundamental power coupler waveguides are important components of the cryomodules. The integrity and quality of copper plating is critical to reduce the heat load from the waveguides into the He bath at 2.07 K. A search of copper plating resources is underway for plating or re-plating CEBAF-style waveguides. This effort ensures a continuous capability of copper plating on cryomodule components, especially on waveguides. To qualify plating vendors, the waveguide copper plating specifications were revisited, and a thorough plating evaluation process is being developed. The evaluation process ranges from coupon testing to sample waveguide qualification. Recent results are summarized and future work is planned.

Zhao, Liang↗

Feasibility and conceptual design of a C.W. positron source at CEBAF

A feasibility study of a CW positron source for the 12 GeV upgrade at Jefferson Lab (JLAB) is provided. The proposed ≥ 100 nA Continuous Wave (CW) positron source at JLAB has several unique and challenging characteristics: high current incident electron beam at 126 MeV with a high beam power (up to a MW); CW e - beam and CW e + production. The multiple scattering is a dominant process when creating e + in a target, which results a large phase space area of the emitted positrons. An admittance study was done at CEBAF to find the maximum phase space area, which is tolerated in the machine. The measured geometrical transverse admittance (A) were A x =10 and A y = 5 mm∙mrad at the injector. Energy spread measurement was also done at the ARC1. The fractional spread limit in the ARC1 was measured as δ = 3×10 -3 at 653 MeV. By using the optimized results and the CEBAF parameters, three positron injector configurations are proposed; Combined Function Magnet, Two-Dipole and Microtron Dipole configurations. With the assumptions made, by using 126 MeV Ⓧ10 mA e - beam impinging on a 2 mm W target with a 100 μm spot size, we can get up to 3 μA useful e + current at the North Linac connection. One of the biggest challenges is the target design, which the deposited power is about 60 kW. ILC designs project power deposition up to 13 kW, which would allow the creation of a e + beam of up to 650 nA otherwise. The results of analytic and monte carlo simulations of the positron production, capture and acceleration are presented. For the target design, a review is presented of solutions for the high power production target. Portions of this dissertation work have been published in two conference proceedings.

43 PARTICLE ACCELERATORS↗

Bunch Length Measurements at the CEBAF Injector at 130 kV

In this work, we investigated the evolution in bunch length of beams through the CEBAF injector for 8?770 fC charge per bunch. Using the software General Particle Tracer (GPT), we have simulated beams through the beamline of the CEBAF injector to predict bunch lengths at the location of a beam chopper for comparison with measurements and to validate the model. We performed these simulations with the existing injector using a 130 kV gun voltage. The mea- surements have been done using chopper phase scanning technique for two injector laser drive frequencies 499 MHz and 249.5 MHz. Acknowledgement This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

Pokharel, S.↗

Cavity Production and Testing of the First C75 Cryomodule for CEBAF

The CEBAF cryomodule rework program was updated over the last few years to increase the energy gain of refurbished cryomodules to 75 MeV. The concept recycles the waveguide end-groups from original CEBAF cavities fabricated in the 1990s and replaces the five elliptical cells in each with a new optimized cell shape fabricated from large-grain, ingot Nb material. Eight cavities were fabricated at Research Instruments, Germany, and two cavities were built at Jefferson Lab. Each cavity was processed by electropolishing and tested at 2.07 K. The best eight cavities were assembled into ’cavity pairs’ and re-tested at 2.07 K, before assembly into the cryomodule. All but one cavity in the cryomodule were within 10% of the target accelerating gradient of 19 MV/m with a quality factor of 8·10⁹. The performance limitations were field emission and multipacting.

Ciovati, G.↗

Graph Embeddings for CEBAF Operations: Progress and Future Plans

We describe research towards leveraging deep learning on graph representations of the injector beamline at the Continuous Electron Beam Accelerator Facility (CEBAF) in order to create a tool for improving the efficiency of beam tuning tasks. Specifically, we use graphs to represent the injector beamline at any arbitrary date and time and invoke a graph neural network to extract a low-dimensional, informative representation that can be visualized in two-dimensions. By analyzing years of operational data from the CEBAF archiver, good and bad regions of parameter space can be identified. The goal is to exercise this framework as a real-time tool to aid beam tuning, which represents the dominant source of machine downtime.

Tennant, C.↗

Pursuing the Origin and Remediation of Low Q0 observed in the Original CEBAF Cryomodules

We report on results of a new investigation into the Q0 degradation phenomenon observed in original CEBAF cavities when assembled into cryomodules. As a result, the RF dissipation losses increased by roughly a factor of two. The origin of the degradation, first observed in 1994, has remained unresolved up to current period, despite much effort. Recently, a new investigation has been launched, taking advantage of the latest cryomodule to undergo refurbishment. Systematic measurements are conducted with respect to the magnetic shielding effects of the double-layer shields and the magnetic properties of various components within the inner shield. This resulted in the new discovery of strongly magnetized strut springs as a major source of remnant magnetic flux near a cavity inside of all magnetic shielding. New springs with superior magnetic properties have been found, evaluated and implemented into the current cryomodule. Cryogenic RF testing of this module is expected to complete by end of 2013. In this contribution, we will review the data accumulated so far. Options for complete Q0 preservation of assembled cavities and possible Q0 remediation for those 330 cavities already installed in CEBAF will be presented.

Geng, R. L.↗

System Downtime Management at 12 GeV CEBAF

Jefferson Lab?s Accelerator Division uses two independent web based applications for Beam Time Accounting and System Downtime tracking. The Beam Time Accounting application acts as the accelerator time clock, while the Downtime Manager application monitors individual system performance. Accelerator system health is important to quantify in order to effectively and efficiently utilize limited resources for performance improvements. Jefferson Lab?s Accelerator Operability Group has historically tracked System Downtime by gathering failure data via Operator input. A recent overhaul of that process has been implemented which includes failure guidelines, a new web based application/reporting application, and Operator training. The new process was implemented at the start of CEBAF?s 12 GeV Commissioning to document system failures during commissioning, identify ?infant mortality? failures, and improve the Downtime Manager application prior to production running. This discussion will focus on the journey of implementing the modified system downtime process and the vision of future improvements for CEBAF operations.

Michaud, Randy↗