Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEMENTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Experimental study of potential wellbore cement carbonation by various phases of carbon dioxide during geologic carbon sequestration

Hydrated Portland cement was reacted with carbon dioxide (CO2) in supercritical, gaseous, and aqueous phases to understand the potential cement alteration processes along the length of a wellbore, extending from deep CO2 storage reservoir to the shallow subsurface during geologic carbon sequestration. The 3-D X-ray microtomography (XMT) images displayed that the cement alteration was significantly more extensive by CO2-saturated synthetic groundwater than dry or wet supercritical CO2 at high P (10 MPa)-T (50°C) conditions. Scanning electron microscopy with energy dispersive spectroscopy (SEM-EDS) analysis also exhibited a systematic Ca depletion and C enrichment in cement matrix exposed to CO2-saturated groundwater. Integrated XMT, XRD, and SEM-EDS analyses identified the formation of extensive carbonated zone filled with CaCO3(s), as well as the porous degradation front and the outermost silica-rich zone in cement after exposure to CO2-saturated groundwater. The cement alteration by CO2-saturated groundwater for 2-8 months overall decreased the porosity from 31% to 22% and the permeability by an order of magnitude. Cement alteration by dry or wet supercritical CO2 was slow and minor compared to CO2-saturated groundwater. A thin single carbonation zone was formed in cement after exposure to wet supercritical CO2 for 8 months or dry supercritical CO2 for 15 months. Extensive calcite coating was formed on the outside surface of a cement sample after exposure to wet gaseous CO2 for 1-3 months. The chemical-physical characterization of hydrated Portland cement after exposure to various phases of carbon dioxide indicates that the extent of cement carbonation can be significantly heterogeneous depending on CO2 phase present in the wellbore environment. Both experimental and geochemical modeling results suggest that wellbore cement exposure to supercritical, gaseous, and aqueous phases of CO2 during geologic carbon sequestration is unlikely to damage the wellbore integrity because cement alteration by all phases of CO2 is dominated by carbonation reaction. This is consistent with previous field studies of wellbore cement with extensive carbonation after exposure to CO2 for 3 decades. However, XMT imaging indicates that preferential cement alteration by supercritical CO2 or CO2-saturated groundwater can occur along the cement-steel or cement-rock interfaces. This highlights the importance of further investigation of cement degradation along the interfaces of wellbore materials to ensure permanent geologic carbon storage.

Calcite↗

Analysis of Energy-Efficiency Opportunities for the Cement Industry in Shandong Province, China

China's cement industry, which produced 1,388 million metric tons (Mt) of cement in 2008, accounts for almost half of the world's total cement production. Nearly 40% of China's cement production is from relatively obsolete vertical shaft kiln (VSK) cement plants, with the remainder from more modern rotary kiln cement plants, including plants equipped with new suspension pre-heater and pre-calciner (NSP) kilns. Shandong Province is the largest cement-producing Province in China, producing 10% of China's total cement output in 2008. This report documents an analysis of the potential to improve the energy efficiency of NSP kiln cement plants in Shandong Province. Sixteen NSP kiln cement plants were surveyed regarding their cement production, energy consumption, and current adoption of 34 energy-efficient technologies and measures. Plant energy use was compared to both domestic (Chinese) and international best practice using the Benchmarking and Energy Saving Tool for Cement (BEST-Cement). This benchmarking exercise indicated an average technical potential primary energy savings of 12% would be possible if the surveyed plants operated at domestic best practice levels in terms of energy use per ton of cement produced. Average technical potential primary energy savings of 23% would be realized if the plants operated at international best practice levels. Energy conservation supply curves for both fuel and electricity savings were then constructed for the 16 surveyed plants. Using the bottom-up electricity conservation supply curve model, the cost-effective electricity efficiency potential for the studied cement plants in 2008 is estimated to be 373 gigawatt hours (GWh), which accounts for 16% of total electricity use in the 16 surveyed cement plants in 2008. Total technical electricity-saving potential is 915 GWh, which accounts for 40% of total electricity use in the studied plants in 2008. The fuel conservation supply curve model shows the total technical fuel efficiency potential equal to 7,949 terajoules (TJ), accounting for 8% of total fuel used in the studied cement plants in 2008. All the fuel efficiency potential is shown to be cost effective. Carbon dioxide (CO{sub 2}) emission reduction potential associated with cost-effective electricity saving is 383 kiloton (kt) CO{sub 2}, while total technical potential for CO{sub 2} emission reduction from electricity-saving is 940 ktCO{sub 2}. The CO{sub 2} emission reduction potentials associated with fuel-saving potentials is 950 ktCO{sub 2}.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of an Improved Cement for Geothermal Wells

After an oil, gas, or geothermal production well has been drilled, the well must be stabilized with a casing (sections of steel pipe that are joined together) in order to prevent the walls of the well from collapsing. The gap between the casing and the walls of the well is filled with cement, which locks the casing into place. The casing and cementing of geothermal wells is complicated by the harsh conditions of high temperature, high pressure, and a chemical environment (brines with high concentrations of carbon dioxide and sulfuric acid) that degrades conventional Portland cement. During the 1990s and early 2000s, the U.S. Department of Energy’s Geothermal Technologies Office (GTO) provided support for the development of fly-ash-modified calcium aluminate phosphate (CaP) cement, which offers improved resistance to degradation compared with conventional cement. However, the use of CaP cements involves some operational constraints that can increase the cost and complexity of well cementing. In some cases, CaP cements are incompatible with chemical additives that are commonly used to adjust cement setting time. Care must also be taken to ensure that CaP cements do not become contaminated with leftover conventional cement in pumping equipment used in conventional well cementing. With assistance from GTO, Trabits Group, LLC has developed a zeolite-containing cement that performs well in harsh geothermal conditions (thermal stability at temperatures of up to 300°C and resistance to carbonation) and is easy to use (can be easily adjusted with additives and eliminates the need to “sterilize” pumping equipment as with CaP cements). This combination of properties reduces the complexity/cost of well cementing, which will help enable the widespread development of geothermal energy in the United States.

15 GEOTHERMAL ENERGY↗

TCF - Sustainable Well Cement for Geothermal, Thermal Recovery, and Carbon Storage wells

Primary cementing is the most important operation performed on a subterranean well. Cement, placed in the annulus between the casing and the formations, serves as a hydraulic seal preventing fluids and gas migrations, protecting steel casing from corrosion, and supporting the well structure. Poor cementing jobs can be directly responsible for wells not reaching their full capacity, casing corrosion, compromised well integrity and, in the worst-case scenarios, well collapse. Geothermal, thermal recovery, and carbon storage wells offer environments that are especially difficult for cements to survive while the required lifespan of these wells can be years. In these wells currently used cements cannot provide durable well integrity, and new solutions are necessary. The necessity of stabilizing the electric grid, increasing its flexibility, and providing energy on demand will further expand the market of durable cement solutions for applications in high-temperature underground reservoir thermal energy storage wells (HT RTES). The design challenges of special cement systems for such wells originate from chemistry limitations of currently used well cements, aggressive environments, temperature and repeated shock conditions associated with them, and very weak formations that are not uncommon in these wells. During the last 70 years the most common systems for thermal-well construction have been Ordinary Portland Cement (OPC) (absolute majority of the wells), silica-lime system, and high aluminum cement-containing formulations. The major issues of calcium-silicate hydrates, that form during the hydration of OPC resulting in hardened material, are their poor chemical resistance to acids due to the calcium interactions with acid anions followed by its eventual dissolution, even in mild acids, such as carbonic acid from CO 2 dissolution, and inadequate bonding to the steel causing serious casing corrosion problems (Sugama & Pyatina, 2019). Performance of OPC-based cement may be significantly improved with organic additives; however, those are limited by their temperature stability. An alternative to calcium-silicate cement was developed by BNL and commercialized by Halliburton as ThermaLock TM cement. Calcium-aluminate-phosphate-based chemistry of the material allowed overcoming acid-resistance problems of OPC, especially in CO 2 -rich geothermal environments. In 2012-2015, building upon this experience, BNL developed Thermal Shock Resistant Cement (TSRC) with the support of Geothermal Technology Office (GTO) of DOE. TSRC has high-temperature stable chemistry, superior properties of cement-metal casing bond and corrosion protection (4-times better than currently used OPC-based formulation), significantly outperforms common well-cements in thermal-shock tests, has self-healing properties, and like ThermaLock TM is CO 2 resistant incorporating carbonate ions into stable hydrates (Gill et al., 2012).

15 GEOTHERMAL ENERGY↗

Computational studies of two-phase cement-CO2-brine interaction in wellbore environments

Wellbore integrity is essential to ensuring long-term isolation of buoyant supercritical CO{sub 2} during geologic sequestration of CO{sub 2}. In this report, we summarize recent progress in numerical simulations of cement-brine-CO{sub 2} interactions with respect to migration of CO{sub 2} outside of casing. Using typical values for the hydrologic properties of cement, caprock (shale) and reservoir materials, we show that the capillary properties of good quality cement will prevent flow of CO{sub 2} into and through cement. Rather, CO{sub 2}, if present, is likely to be confined to the casing-cement or cement-formation interfaces. CO{sub 2} does react with the cement by diffusion from the interface into the cement, in which case it produces distinct carbonation fronts within the cement. This is consistent with observations of cement performance at the CO{sub 2}-enhanced oil recovery SACROC Unit in West Texas (Carey et al. 2007). For poor quality cement, flow through cement may occur and would produce a pattern of uniform carbonation without reaction fronts. We also consider an alternative explanation for cement carbonation reactions as due to CO{sub 2} derived from caprock. We show that carbonation reactions in cement are limited to surficial reactions when CO{sub 2} pressure is low (< 10 bars) as might be expected in many caprock environments. For the case of caprock overlying natural CO{sub 2} reservoirs for millions of years, we consider Scherer and Huet's (2009) hypothesis of diffusive steady-state between CO{sub 2} in the reservoir and in the caprock. We find that in this case, the aqueous CO{sub 2} concentration would differ little from the reservoir and would be expected to produce carbonation reaction fronts in cements that are relatively uniform as a function of depth.

54 ENVIRONMENTAL SCIENCES↗

Air Pollutant Emissions Projections for the Cement and Steel Industry in China and the Impact of Emissions Control Technologies

China’s cement and steel industry accounts for approximately half of the world’s total cement and steel production. These two industries are two of the most energy-intensive and highest carbon dioxide (CO 2 )-emitting industries and two of the key industrial contributors to air pollution in China. For example, the cement industry is the largest source of particulate matter (PM) emissions in China, accounting for 40 percent of its industrial PM emissions and 27 percent of its total national PM emissions. The Chinese steel industry contributed to approximately 20 percent of sulfur dioxide (SO 2) emissions and 27 percent of PM emissions for all key manufacturing industries in China in 2013. In this study, we analyzed and projected the total PM and SO 2 emissions from the Chinese cement and steel industry from 2010–2050 under three different scenarios: a Base Case scenario, an Advanced scenario, and an Advanced EOP (end-of-pipe) scenario. We used bottom-up emissions control technologies data and assumptions to project the emissions. In addition, we conducted an economic analysis to estimate the cost for PM emissions reductions in the Chinese cement industry using EOP control technologies, energy efficiency measures, and product change measures. The results of the emissions projection showed that there is not a substantial difference in PM emissions between the Base Case and Advanced scenarios, for both the cement and steel industries. This is mainly because PM emissions in the cement industry caused mainly by production process and not the fuel use. Since our forecast for the cement production in the Base Case and Advanced scenarios are not too different from each other, this results in only a slight difference in PM emissions forecast for these two scenarios. Also, we assumed a similar share and penetration rate of control technologies from 2010 up to 2050 for these two scenarios for the cement and steel industry. However, the Advanced EOP scenario showed significantly lower PM emissions for the cement industry, reaching to 1.7 million tons of PM in 2050, which is less than half of that in the other two scenarios. The Advanced EOP scenario also has the lowest SO 2 emissions for the cement industry in China, reaching to 212,000 tons of SO 2 in 2050, which is equal to 40 percent of the SO 2 emissions in the Advanced scenario and 30 percent of the emissions in the Base Case scenario. The SO 2 emission is mainly caused by fuel (coal) burning in cement kiln or steel processes. For the steel industry, the SO 2 emissions of the Advanced EOP scenario are significantly lower than the other scenarios, with emissions declining to 323,000 tons in 2050, which is equal to 21 percent and 17 percent of the emissions of Advanced and Base Case scenarios in 2050, respectively. Results of the economic analysis show that for the Chinese cement industry, end-of-pipe PM control technologies have the lowest abatement cost per ton of PM reduced, followed by product change measures and energy efficiency measures, respectively. In summary, in order to meet Chinese national and regional air quality standards, best practice end-of-pipe emissions control technologies must be installed in both cement and steel industry and it must be supplemented by implementation of energy efficiency technologies and reduction of cement and steel production through structural change in industry.

54 ENVIRONMENTAL SCIENCES↗

Defining the Difference Between Laboratory and Field-Generated Foamed Cement

Foamed cement has been used extensively across a variety of applications for oil and gas well cementing, including deepwater riserless cementing, low fracture gradient cementing, horizontal well cementing, steam injection well cementing, and high-pressure/high-temperature (HP/HT) cementing. When using foamed cement, laboratory testing is used to estimate the performance characteristics of foamed cement slurries that are designed for well applications. It is well known that significant differences exist between the methods used to generate foamed cement in the laboratory and those used to generate foamed cement for field applications. The implications of these differences on foamed slurry characteristics (e.g., bubble size distribution) and performance properties (e.g., stability, permeability, mechanical properties) has not been well analyzed or well understood. This paper documents a project that was undertaken through a joint effort between API Sub-Committee 10 and the National Energy Technology Laboratory (NETL) to examine the differences between foamed slurries generated with laboratory equipment and field foamed cementing equipment. Methods for generating and capturing foamed cement samples using field equipment are discussed, as well as analytical methods for evaluating the characteristics of foamed cements. References to the resulting data are provided. Finally, conclusions and recommendations are presented that were developed during the course of the project.

02 PETROLEUM↗

Investigation of Possible Wellbore Cement Failures During Hydraulic Fracturing Operations

We model and assess the possibility of shear failure, using the Mohr-Coulomb model ? along the vertical well by employing a rigorous coupled flow-geomechanic analysis. To this end, we vary the values of cohesion between the well casing and the surrounding cement to representing different quality levels of the cementing operation (low cohesion corresponds to low-quality cement and/or incomplete cementing). The simulation results show that there is very little fracturing when the cement is of high quality.. Conversely, incomplete cementing and/or weak cement can causes significant shear failure and the evolution of long fractures/cracks along the vertical well. Specifically, low cohesion between the well and cemented areas can cause significant shear failure along the well, but the same cohesion as the cemented zone does not cause shear failure. When the hydraulic fracturing pressure is high, low cohesion of the cement can causes fast propagation of shear failure and of the resulting fracture/crack, but a high-quality cement with no weak zones exhibits limited shear failure that is concentrated near the bottom of the vertical part of the well. Thus, high-quality cement and complete cementing along the vertical well appears to be the strongest protection against shear failure of the wellbore cement and, consequently, against contamination hazards to drinking water aquifers during hydraulic fracturing operations.

02 PETROLEUM↗

Cementation of Nuclear Wastes: From Past to Future in a Sustainable Approach - 18266

Cementation of nuclear wastes is a widespread technology due to several factors such as excellent feedback from past experience, simplicity of implementation and versatility. Indeed, as nuclear wastes come in many physical states (bulk wastes, powders, sludges), cementation is the immobilisation process that can easily accommodate this large range of wastes provided the appropriate mixing technology is used: heterogenous cementation (grouting of bulky wastes) or homogenous cementation (intermixing process between the powder or the sludge and the cementitious material). However, nuclear wastes equally present an important chemical variability. This is especially true as New Areva's range of nuclear activities covers the entire fuel cycle: mining, conversion, enrichment and recycling and dismantling and decommissioning. The chemical interactions between the waste and the cement matrix are carefully studied by New Areva's R and D teams in order to provide comprehensive solutions by developing cement formulations which are adapted to wastes characteristics. The aim of the studies is to obtain cement waste-forms that meet the waste acceptance criteria, the final product being thus in perfect adequacy with the disposal requirements. For over 30 years New Areva has been developing cement formulations adapted to the physical and chemical specificities of the wastes accounting for constrains imposed by waste characteristics. The overall approach includes the definition of the appropriate cement composition at laboratory scale, engineering design, equipment manufacturing, testing and commissioning of the cementation facilities. With this strong technical background, a specific methodology has been developed by New Areva teams in order to allow a rapid screening of possible solutions for a given waste (in terms of cement chemistry adapted to the waste) in a learn-fast approach that is based on theoretical analysis and small-scale tests. The methodology was applied for wastes presenting a complex nature (such as reactive metals, ion exchange resins, oils and solvents, mercury, etc), known to interact with Portland cement from a chemical point of view and leading to durability issues of the wasteform (swelling, strength reduction, leaching) and thus reducing the final waste loading. Once the screening process is over, the main drivers for choosing the most appropriate solution to be further developed at pilot scale are: reducing the overall volume and the impact of the final waste package, ensure the waste package performance as defined by the disposal requirements and control the long-term behaviour in final disposal. Moreover, a modelling approach is addressed, aiming to develop a thermo-chemo-mechanical (THM) concrete models that are able to predict the behaviour of the structure (waste form) in time. The aim of the present paper is to describe the main principles within the developed methodology and illustrate it by using a few specific examples. Several distinct cement formulations are developed for complex wastes, limiting the chemical interaction between the cement matrix and the given wastes, obtaining better waste loadings and better overall durability behaviour which facilitates long term behaviour demonstration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Advanced Finite Element Model and Parametric Study to Evaluate Cement Sheath Barrier

Cement failure is known as one of the major causes for loss of well control events. Cement design is considered as one of the top technological knowledge gaps in high-pressure high-temperature oil and gas exploration. The primary objective of this paper is to perform a parametric analysis and identify critical parameters affecting the mechanical integrity of the set cement sheath. To achieve the objective, three-dimensional finite element models consisting of concentric casings and annular cement sheath were created. The finite element model was validated by analytical calculations. Performance of cement sheath was assessed by analyzing radial, hoop, and maximum shear stresses at different loading conditions. A parametric study was conducted by individually varying influencing factors such as cement material properties, sheath dimensions, and wellbore pressure loads. Values of all parameters were normalized and represented on the same plot against mechanical stresses. Such response curves can be used to estimate whether cement will structurally fail because of various operational loads or material aging. The plot can also be utilized to rank various factors in terms of influence on cement’s performance. Sensitivity response reveals that wellbore pressure, cement material properties, and annulus pressure are major parameters influencing mechanical stresses in neat class G cement. The order of importance depends on the type of stress. Results indicate interfacial bond failure and radial cracking to be the more likely modes of failure for class G cement. Cement response curves can help design engineers and regulators alike in quickly evaluating short-term or long-term fitness-for-service of cement sheath from the perspective of structural integrity. Industry standards and guidelines can be improved by adding performance curves for standard cement recipes.

Energy & Fuels↗

Experimental Evaluation of Geopolymer, Nano-Modified, and Neat Class H Cement by Using Diametrically Compressive Tests

Abstract Cement is the prime barrier material to maintain zonal isolation during wellbore life-cycle. Different types of the cement have different performances on sealability. The primary objective of this study is evaluation of three types of cement systems, neat Class H, nano-synthetic graphite, and rock-based geopolymer cements, on interfacial bond integrity. Diametrical compressive tests are used on casing–cement–formation systems. Cement performances are tested in a conventional configuration (Berea Sandstone). A universal testing system is utilized to analyze the relationship applied load–axial strain and the digital image correlation (DIC) technique is used to generate the strain field maps. Based on the relationship and DIC results, bond strengths in different cement systems are evaluated. Additionally, microscope images provide insight explanations of the bond from micro-view. Based on the experimental results, failures of all cases initiate and propagate from the casing–cement interface. Then, radial cracks develop through the formation. This is because the mechanical interlocking bonds are formed only at the cement–sandstone interface to enhance the bond strength. The comparison of geopolymer and nano-modified cements with the conventional cement (neat Class H) shows that the unconventional cements have a lower maximum load and higher axial strain before failure of the samples. It indicates that both the two kinds of cements are more ductile than conventional cement and can support more deformation before the initiation of cracks.

Energy & Fuels↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Alternative Fuel for Portland Cement Processing

The production of cement involves a combination of numerous raw materials, strictly monitored system processes, and temperatures on the order of 1500 °C. Immense quantities of fuel are required for the production of cement. Traditionally, energy from fossil fuels was solely relied upon for the production of cement. The overarching project objective is to evaluate the use of alternative fuels to lessen the dependence on non-renewable resources to produce portland cement. The key objective of using alternative fuels is to continue to produce high-quality cement while decreasing the use of non-renewable fuels and minimizing the impact on the environment. Burn characteristics and thermodynamic parameters were evaluated with a laboratory burn simulator under conditions that mimic those in the preheater where the fuels are brought into a cement plant. A drop-tube furnace and visualization method were developed that show potential for evaluating time- and space-resolved temperature distributions for fuel solid particles and liquid droplets undergoing combustion in various combustion atmospheres. Downdraft gasification has been explored as a means to extract chemical energy from poultry litter while limiting the throughput of potentially deleterious components with regards to use in firing a cement kiln. Results have shown that the clinkering is temperature independent, at least within the controllable temperature range. Limestone also had only a slight effect on the fusion when used to coat the pellets. However, limestone addition did display some promise in regards to chlorine capture, as ash analyses showed chlorine concentrations of more than four times greater in the limestone infused ash as compared to raw poultry litter. A reliable and convenient sampling procedure was developed to estimate the combustion quality of broiler litter that is the best compromise between convenience and reliability by means of statistical analysis. Multi-day trial burns were conducted at a full-scale cement plant with alternative fuels to examine their compatibility with the cement production process. Construction and demolition waste, woodchips, and soybean seeds were used as alternative fuels at a full-scale cement production facility. These fuels were co-fired with coal and waste plastics. The alternative fuels used in this trial accounted for 5 to 16 % of the total energy consumed during these burns. The overall performance of the portland cement produced during the various trial burns performed for practical purposes very similar to the cement produced during the control burn. The cement plant was successful in implementing alternative fuels to produce a consistent, high-quality product that increased cement performance while reducing the environmental footprint of the plant. The utilization of construction and demolition waste, woodchips and soybean seeds proved to be viable replacements for traditional fuels. The future use of these fuels depends on local availability, associated costs, and compatibility with a facility's production process.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Water absorption and shrinkage behaviour of early-age cement in wellbore annulus

Controlling cement shrinkage in a wellbore is well-known as being important in maintaining its integrity. Although numerous laboratory experiments on the water absorption and shrinkage behaviour of oil well cement have been reported in the past, such behaviour in the wellbore annulus with consideration of pore water migration from the surrounding formation has seldom been examined. In this study, using a cement shrinkage model calibrated against available experimental data, a coupled hydromechanical finite element analysis of a cement-formation model is conducted to simulate the water migration, absorption and shrinkage behaviour of early-age cement placed in the annulus of a wellbore. The objectives of this study are (i) to identify the threshold permeability value of the formation above which there is no longer a bottleneck for pore water to flow into the cement and (ii) to estimate a reasonable range of cement bulk shrinkage volume in wellbore annulus geometry. Results show that the threshold permeability of the formation would be around 0.1 mD for three different types of cement examined in this study: Class G cement, rapid setting (RS) cement and Schlumberger optimized particle size distribution (OPSD) technology cement. The bulk shrinkage volume varies from 0.01% to 2.4% depending on cement type and formation permeability (1 mD to 0.1 μD). Finally, the proposed methodology facilitates the simulation of water migration/absorption and shrinkage behaviour of well cement in different formations.

02 PETROLEUM↗

Imaging Wellbore Cement Degradation by Carbon Dioxide under Geologic Sequestration Conditions Using X-ray Computed Microtomography

ABSTRACT: X-ray microtomography (XMT), a nondestructive three-dimensional imaging technique, was applied to demonstrate its capability to visualize the mineralogical alteration and microstructure changes in hydrated Portland cement exposed to carbon dioxide under geologic sequestration conditions. Steel coupons and basalt fragments were added to the cement paste in order to simulate cement-steel and cement-rock interfaces. XMT image analysis showed the changes of material density and porosity in the degradation front (density: 1.98 g/cm3, porosity: 40%) and the carbonated zone (density: 2.27 g/cm3, porosity: 23%) after reaction with CO2- saturated water for 5 months compared to unaltered cement (density: 2.15 g/cm3, porosity: 30%). Three-dimensional XMT imaging was capable of displaying spatially heterogeneous alteration in cement pores, calcium carbonate precipitation in cement cracks, and preferential cement alteration along the cement-steel and cement-rock interfaces. This result also indicates that the interface between cement and host rock or steel casing is likely more vulnerable to a CO2 attack than the cement matrix in a wellbore environment. It is shown here that XMT imaging can potentially provide a new insight into the physical and chemical degradation of wellbore cement by CO2 leakage.

Imaging Wellbore Cement Degradation by Carbon Diox↗

On the Flow of a Cement Suspension: The Effects of Nano-Silica and Fly Ash Particles

Additives such as nano-silica and fly ash are widely used in cement and concrete materials to improve the rheology of fresh cement and concrete and the performance of hardened materials and increase the sustainability of the cement and concrete industry by reducing the usage of Portland cement. Therefore, it is important to study the effect of these additives on the rheological behavior of fresh cement. In this paper, we study the pulsating Poiseuille flow of fresh cement in a horizontal pipe by considering two different additives and when they are combined (nano-silica, fly ash, combined nano-silica, and fly ash). To model the fresh cement suspension, we used a modified form of the power-law model to demonstrate the dependency of the cement viscosity on the shear rate and volume fraction of cement and the additive particles. The convection–diffusion equation was used to solve for the volume fraction. After solving the equations in the dimensionless forms, we conducted a parametric study to analyze the effects of nano-silica, fly ash, and combined nano-silica and fly ash additives on the velocity and volume fraction profiles of the cement suspension. According to the parametric study presented here, larger nano-silica content results in lower centerline velocity of the cement suspension and larger non-uniformity of the volume fraction. Compared to nano-silica, fly ash exhibits an opposite effect on the velocity. Larger fly ash content results in higher centerline velocity, while the effect of the fly ash on the volume fraction is not obvious. For cement suspension containing combined nano-silica and fly ash additives, nano-silica plays a dominant role in the flow behavior of the suspension. The findings of the study can help the design and operation of the pulsating flow of fresh cement mortars and concrete in the 3D printing industry.

36 MATERIALS SCIENCE↗

Portland cement paste behaviour under gamma radiation field in geological repository - 15272

The Radioactive Waste Management Laboratory at the Nuclear and Energy Research Institute in Sao Paulo, Brazil (IPEN-CNEN-SP), is developing the concept of a repository for disposition of disused sealed radioactive sources in a deep borehole in which cement paste is intended to be used as a backfill between the steel casing and the geological formation around the borehole. The cement paste is intended to function as structural material, a blockage against the transport of water between the different strata of the geological setting, and as an additional barrier against the migration of radionuclides. The assessment of the cement paste behaviour in long term is necessary to increase the confidence that the material will perform as required during the service life of the facility. Under radiation, pore water present in cement paste suffers radiolysis and some products can be highly reactive, as electrons and hydroxyl radicals and hydrogen peroxide. These radiolysis products will interact with cement paste and its hydration products, forming a wide range of compounds. Previous work focused on assessing the synergic effects of radiation and environmental conditions, like higher temperature and aggressive groundwater chemicals, on cement paste. Examination of samples detected small differences in mineralogy and microstructure. However, the radiation dose to which samples were exposed (400 kGy) was only a fraction of the expected accumulated dose in cement paste until complete decay of some sealed sources in the repository. Therefore, several thousand kilo-grays must be tested the possibility of radiation to alter cement mineralogy and, as a consequence, its durability The objective of this research is to evaluate the changes in mineralogy and microstructure of irradiated cement paste specimens, in an attempt to establish a relationship between irradiation and durability. Cubic Portland cement specimens were casted and exposed to the gamma radiation of a 60 Co multipurpose irradiator, at IPEN-CNEN/SP. The effects of doses between 1000 kGy and 4000 kGy are evaluated by X-Ray Diffraction, Scanning Electron Microscopy, X-ray micro tomography, neutrongraphy and neutron scattering. This report presents the changes in cement paste mineralogy when samples are examined by XRD. Results indicate that durability can be affected because of the observed changes. Results are expected to indicate the induced changes in cement paste under high radiation doses and to provide hints on its behaviour in the long-term and service-life. The results can be used in safety analysis for deep geological repositories that use cement based materials as engineered barriers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental validation of multiphysics model simulations of the thermal response of a cement clinker rotary kiln at laboratory scale

Abstract An increasing demand for buildings, transportation systems and civil infrastructure development has driven expansion of cement consumption world‐wide, producing a significant increase in related global energy demand. With approximately 7% of the world‐wide industrial energy consumption (10.7 exajoules [EJ]), the cement industry is the third most energy intensive industrial processes and a key component for concrete, the most consumed composite material in the global construction industry. In cement manufacturing, the cement kiln accounts for most of the energy consumption in the production process. As the heart of a cement plant, the cement kiln is where the kiln feed primarily containing calcium oxide (CaO), silica (SiO 2 ), alumina (Al 2 O 3 ), and iron (Fe 2 O 3 ) are thermally and chemically transformed into clinker minerals. The presented work developed a multiphysics model, designed and built a laboratory‐scale rotary cement clinker kiln, and produced cement clinker at laboratory‐scale. The model was developed to study the interaction between the various thermal, fluid dynamic and chemical interactions involved in the sintering process used to form Portland cement clinker in an effort to reduce energy use. The analytical model was validated through experimental testing using a unique laboratory‐scale rotary cement kiln developed during the investigation. Also demonstrated was the feasibility of producing clinker at laboratory scale. This modeling and lab scale tests were designed to better understand the clinker sintering process so that operational and quality decisions can be made to optimize energy consumption without compromising cement clinker quality. The computational fluid dynamics modeling was developed in COMSOL Multiphysics 6.0. The characteristics of the combustion fluid flow, concentration of species, temperature and heat transfer were studied for a turbulent flow of methane (CH 4 ) gas and oxygen (O 2 ). Theory suggests that heat transfer impacts the cement production process but the multiphysics model more accurately describes the convection, conduction, and radiant heat transfer in the kilning process and thus allows for a better understanding of the energy exchange driving the chemical reactions that produce Portland cement. Clinker minerals were formed because of appropriate burning conditions implemented during experimental model validation.

Tabares, Juan David↗