Search NASASearch

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Summary and evaluation of the conceptual design study of a potential early commercial MHD power plant (CSPEC)

The conceptual design study of a potential early commercial MHD power plant (CSPEC) is described and the results are summarized. Each of two contractors did a conceptual design of an approximtely 1000 MWe open-cycle MHD/steam plant with oxygen enriched combustion air preheated to an intermediate temperatue in a metallic heat exchanger. The contractors were close in their overall plant efficiency estimates but differed in their capital cost and cost of electricity estimates, primarily because of differences in balance-of-plant material, contingency, and operating and maintenance cost estimates. One contractor concluded that its MHD plant design compared favorably in cost of electricity with conventional coal-fired steam plants. The other contractor is making such a comparison as part of a follow-on study. Each contractor did a preliminary investigation of part-load performance and plant availability. The results of NASA studies investigating the effect of plant size and oxidizer preheat temperature on the performance of CSPEC-type MHD plants are also described. The efficiency of a 1000 MWe plant is about three points higher than of a 200 MWe plant. Preheating to 1600 F gives an efficiency about one and one-half points higher than preheating to 800 F for all plant sizes. For each plant size and preheat temperature there is an oxidizer enrichment level and MHD generator length that gives the highest plant efficiency.

Staiger, P. J.

Safety, reliability, maintainability and quality provisions for the Space Shuttle program

This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

M S Malkin

Realizing the Residential Electrification Opportunity: One Heat Pump at a Time

Space and water heating in residential buildings is a major contributor of greenhouse gas (GHG) emissions in the United States. Advanced electric heat pumps (HP) and heat pump water heaters (HPWH) are poised to provide a low carbon alternative to traditional fossil-based space and water heating. Widespread deployment of heat pumps could help address the significant portion of building emissions and primary energy used in American households, however much work needs to be done to close the knowledge gap between like-for-like fossil equipment replacement and switching to HPs for the average contractor. The Pacific Northwest National Laboratory (PNNL) has been working on closing this knowledge gap through the development of decision tools and resources targeted towards contractors and installers. Developed in coordination with stakeholders and experienced contractors from a variety of geographic regions, these tools help streamline the process of sizing and selecting residential HPs and HPWHs for key use cases. Along with the complementary Retrofit Decision Tool developed by PNNL, the decision tools will help contractors understand the importance of whole building considerations when choosing HPs including envelope upgrades, duct assessments, and electrical assessments to ensure optimal selection and performance of the HP or HPWH. They also provide direct links to resources and best practices developed by PNNL as well as external entities to further help contractor education and training. This paper describes the development of these tools, and their role in moving the existing space and water heating market towards HPs to help realize the country’s decarbonization goals.

heat pump, heat pump water heater, Residential bui

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record

Panel to review EOSDIS plans

Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

Source record

The advantages of cost plus award fee contracts

A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

Keathley, William C.

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn

Independent Review of Non-Destructive Assay for the K-25/K-27 D&D Project: November 30-December 3, 2004, Oak Ridge, TN

The DOE with concurrence from the D&D contractor has chartered an assessment of the methods and procedures used to obtain the original NDA results of holdup deposits at the K-25 and K-27 uranium gaseous diffusion facilities in Oak Ridge. The assessment has been performed by an external review team with the participation of the D&D contractor, DOE, and DOE/OR. This document is the final report for the assessment. The DOE provided the charter for this review. The review team spent a week in Oak Ridge attending meetings and participating in discussions with expert contractor staff. Substantial additional input for the review came from numerous written materials, unpublished and published. This final report of observations, findings, and recommendations in areas defined by the charter is based on information from the meetings, discussions, and documents. The assessment of the Review Team is that the DOE/OR and BJC approach in using historical NDA data for the D&D of K-25 and K-27 is appropriate and generally acceptable. Resolving issues, addressing findings, and implementing the recommendations documented in this report will reconcile specific technical concerns.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects (Final Technical Report)

The number of commercial coal, gas, and nuclear projects built over the past 100 years number in the thousands. As such, there is a large database, available to a wide range of commercial engineering contractors, on proven designs. In essence, unsuccessful designs have, through generations of iterations, been identified and then deleted from further consideration. In contrast, the number of commercial parabolic trough projects using nitrate salt for the thermal storage media is perhaps 60. Further, the number of commercial central receiver projects using nitrate salt as the working fluid is on the order of 20, including estimates for China. Given the relative immaturity of salt technology, and commercial pressures to successfully bid new solar projects into a mature electricity market, solar projects often promise more than has been delivered. The Design Basis Document / Owner’s Technical Specification is a first step in the iteration process. The report describes the successful features of commercial projects, outlines a range equipment and system failures in projects that didn’t operate as intended, and provides a draft set of design changes intended to correct the known problems. The product of the study is 3 volumes of technical material; one volume is on parabolic trough technologies; a second is on central receiver technologies, and the third is on potential design changes to parabolic trough and central receiver projects. The 3 volumes, which total some 590 pages, can be found at https://www.solardynllc.com/csp-plant-technologies. One of the principal topics in the report is the use of functional or prescriptive specifications. Functional specifications describe what the equipment needs to do, consistent with the minimum legal requirements of the local jurisdictions. The details of how this is to be accomplished is developed by the engineering contractor. Prescriptive specifications, which are developed by the Owner, prescribe to the engineering contractor how the functional requirements are to be met. This arrangement ensures that the favorable experience from a previous project is repeated. One example is the design code for the hot salt tank in central receiver projects. The closest design basis is API Standard 650 Welded Steel Tanks for Oil Storage. However, the maximum design temperature in API 650 is 260 °C. As such, solar projects have typically adopted a hybrid Code approach, in which allowable material stresses are taken from ASME Section II Materials. Further, since the tanks experience daily changes in temperature and in (static) pressure, and since portions of the tank can operate at stresses beyond the elastic range, the low cycle fatigue life of the tank is conducted using the rules of Section VIII Division 2. However, in a recent study by NREL, the principal damage mechanism was identified as creep rather than fatigue. Further, design stresses permitted under Section VIII Division 2, corresponding to a fatigue life of 30 years, result in projected creep lifetimes of only 2 to 5 years. An alternate design approach, prescribed by the Owner, would be based on Code sections intended for high temperature service in the creep regime. A candidate is Section III Division 5. Granted, this is a nuclear code section, and it’s use would not likely be mandated by local jurisdictions. However, the effects of creep have been deemed to be of sufficient importance that one nuclear project developer, and one central receiver project developer, have stipulated in the tank design specification that the equipment be designed to the requirements of Section III Division 5.

14 SOLAR ENERGY

Flexible Fuel Electric Hybrid Glass Furnace Demonstration

The furnace contractor completed General Arrangement (GA) layouts and Piping and Instrumentation Diagrams (P&ID) for both furnaces during this reporting period. Preliminary equipment lists accompanied this work. Control system architecture in progress. Key furnace design elements and deliverables on track to be complete by end of phase. The facilities design and integration contractor completed a 3D scan and modeling of the facility. The work during this period focused on preliminary design with a focus on overall project scope and feasibility. This key work supports the overall project deliverables for 30% preliminary engineering and Preliminary Design Report (PDR) which are on track to be complete by the end of the phase. These deliverables are approximately 50% complete through the end of this reporting period. The batch house operations design contractor continues development of site plan and General Arrangement (GA) layout to support the 30% preliminary engineering and design package. This work is 60% complete by the end of this reporting period and is on track to be complete by the end of the phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Staged Z-Pinch Modeling with Hydra and Chicago Codes (CRADA Final Report)

This was a collaborative effort between Lawrence Livermore National Security, LLC (“Contractor”), as manager and operator of Lawrence Livermore National Laboratory (“LLNL”) and Magneto Inertial Fusion Technologies, Inc. ("MIFTI" or "Participant"), to develop staged Z-pinch (SZP) modeling with HYDRA and CHICAGO codes. The contractor performed numerical simulations of the SZP to reproduce and validate Participant’s MACH2 simulations. Contractor used the state-of-the-art, radiation-magneto-hydrodynamic code HYDRA, as well as the hybrid particle-in-cell code CHICAGO. This work helped assess the physical and numerical uncertainties associated with the simulations and the overall fusion scheme. HYDRA is a well-established and validated code. This work has helped to independently assess the SZP concept to give confidence to the Participant and to the broader fusion community.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Development of a Space Vehicle Electromagnetic Interference/compatibility Specification. Volume 3 - System Specification

This specification represents a new approach to controlling electromagnetic interference. In this approach the system integration contractor will be responsible for the development of discrete specification limits to be utilized on the program to which this specification is applied. The specification limits imposed upon subsystem contractors will be developed by the use of a computer program, available from the procuring agency, which is designed to consider the total system electromagnetic environment in the computation of these limits. The integration contractor will be required to mathematically model those circuits which represent required emitters and receptors of electromagnetic energy on the space vehicle. There are contained herein, a list of available computer models into which must be inserted particular parameters of the spacecraft subsystems. These functional models, when inserted into the computer program, will develop discrete specification limits based upon the requirements of the particular system modelled.

Cooperstein, B. D.

Skylab checkout operations

The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

Timmons, K. P.

Summary and evaluation of the parametric study of potential early commercial MHD power plants (PSPEC)

Two parallel contracted studies were conducted. Each contractor investigated three base cases and parametric variations about these base cases. Each contractor concluded that two of the base cases (a plant using separate firing of an advanced high temperature regenerative air heater with fuel from an advanced coal gasifier and a plant using an intermediate temperature metallic recuperative heat exchanger to heat oxygen enriched combustion air) were comparable in both performance and cost of electricity. The contractors differed in the level of their cost estimates with the capital cost estimates for the MHD topping cycle and the magnet subsystem in particular accounting for a significant part of the difference. The impact of the study on the decision to pursue a course which leads to an oxygen enriched plant as the first commercial MHD plant is described.

Staigner, P. J.

A correlation study of X-29A aircraft and associated analytical development

Results of the contractor structural and aerodynamic analysis of the X-29A aircraft are verified. A brief history and potential advantages of the X-29A aircraft are discussed. The NASA developed computer package, STARS (STructures, Aerodynamics, and Related Systems), which is used in verifying contractor results is discussed. Enhancements of the STARS package are described, particularly the incorporation of the FASTEX computer program under STARS, and the development of a complete computer graphics system. A comparative study of free vibration and aerodynamic analysis of the X-29A aircraft is given. This study has shown that the natural frequencies and modeshapes determined analytically by STARS and the contractor compare relatively well with experimentally determined data. Also included in the study is the formulation and development of the higher-order plane-stress finite dynamic triangular element.

Ahmadi, Ali

Multi-megawatt inverter/converter technology for space power applications

Large power conditioning mass reductions will be required to enable megawatt power systems envisioned by the Strategic Defense Initiative, the Air Force, and NASA. Phase 1 of a proposed two phase interagency program has been completed to develop an 0.1 kg/kW DC/DC converter technology base for these future space applications. Three contractors, Hughes, General Electric (GE), and Maxwell were Phase 1 contractors in a competitive program to develop a megawatt lightweight DC/DC converter. Researchers at NASA Lewis Research Center and the University of Wisconsin also investigated technology in topology and control. All three contractors, as well as the University of Wisconsin, concluded at the end of the Phase 1 study, which included some critical laboratory work, that 0.1-kg/kW megawatt DC/DC converters can be built. This is an order of magnitude lower specific weight than is presently available. A brief description of each of the concepts used to meet the ambitious goals of this program are presented.

Myers, Ira T.

Orbital transfer rocket engine technology: Advanced engine study

An advanced LOX/LH2 engine study for the use of NASA and vehicle prime contractors in developing concepts for manned missions to the Moon, Mars, and Phobos is documented. Parametric design data was obtained at five engine thrusts from 7.5K lbf to 50K lbf. Also, a separate task evaluated engine throttling over a 20:1 range and operation at a mixture ratio of 12 plus or minus 1 versus the 6 plus or minus 1 nominal. Cost data was also generated for DDT&E, first unit production, and factors in other life cycle costs. The major limitation of the study was lack of contact with vehicle prime contractors to resolve the issues in vehicle/engine interfaces. The baseline Aerojet dual propellant expander cycle was shown capable of meeting all performance requirements with an expected long operational life due to the high thermal margins. The basic engine design readily accommodated the 20:1 throttling requirement and operation up to a mixture ratio of 10 without change. By using platinum for baffled injector construction the increased thermal margin allowed operation up to mixture ratio 13. An initial engine modeling with an Aerojet transient simulation code (named MLETS) indicates stable engine operation with the baseline control system. A throttle ratio of 4 to 5 seconds from 10 percent to 100 percent thrust is also predicted. Performance predictions are 483.1 sec at 7.5K lbf, 487.3 sec at 20K lbf, and 485.2 sec at 50K lbf with a mixture ratio of 6 and an area ratio of 1200. Engine envelopes varied from 120 in. length/53 in. exit diameter at 7.5K lbf to 305 in. length/136 in. exit diameter at 50 K lbf. Packaging will be an important consideration. Continued work is recommended to include more vehicle prime contractor/engine contractor joint assessment of the interface issues.

Hayden, Warren R.