Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Collaboration in long-term stewardship at DOE Hanford Site

The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan, DOE/RL-2010-35 Rev 1. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. This paper highlights the accomplishments and collaborative efforts to address the challenges faced as work progresses from the cleanup to transitioning of land parcels to LTS Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford External Dosimetry Technical Basis Manual PNL-MA-842

The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Maintenance and distribution of controlled hard copies of the manual by PNNL was discontinued beginning with Revision 0.2.

61 RADIATION PROTECTION AND DOSIMETRY↗

Hanford External Dosimetry Technical Basis Manual PNL-MA-842

The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at Hanford. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with 10 CFR 835, DOELAP, DOE-RL, ORP, PNSO, and Hanford contractor requirements. The dosimetry system is operated by PNNL’s Hanford External Dosimetry Program (HEDP) which provides dosimetry services to all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee (HPDAC) which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture (ERICA) database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Maintenance and distribution of controlled hard copies of the manual by PNNL was discontinued beginning with Revision 0.2. Revision Log: Rev. 0 (2/25/2005) Major revision and expansion. Rev. 0.1 (3/12/2007) Updated Chapters 5, 6 and 9 to reflect change in default ring calibration factor used in HEDP dose calculation software. Factor changed from 1.5 to 2.0 beginning January 1, 2007. Pages on which changes were made are as follows: 5.23, 5.69, 5.78, 5.80, 5.82, 6.3, 6.5, 6.29, and 9.2. Rev 0.2 (8/28/2009) Updated Chapters 3, 5, 6, 8 and 9. Chapters 6 and 8 were significantly expanded. References in the Preface and Chapters 1, 2, 4, and 7 were updated to reflect updates to DOE documents. Approved by HPDAC on 6/2/2009. Rev 1.0 (1/1/2010) Major revision. Updated all chapters to reflect the Hanford site wide implementation on January 1, 2010 of new DOE requirements for occupational radiation protection. The new requirements are given in the June 8, 2007 amendment to 10 CFR 835 Occupational Radiation Protection (Federal Register, June 8, 2007. Title 10 Part 835. U.S., Code of Federal Regulations, Vol. 72, No. 110, 31904-31941). Revision 1.0 to the manual replaces ICRP 26 dosimetry concepts and terminology with ICRP 60 dosimetry concepts and terminology and replaces external dose conversion factors from ICRP 51 with those from ICRP 74 for use in measurement of operational quantities with dosimeters. Descriptions of dose algorithms and dosimeter response characteristics, and field performance were updated to reflect changes in the neutron quality factors used in the measurement of operational quantities.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Hanford Site Beryllium Program: Past, Present, and Future - 12428

The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Site-Specific Studies for Removing SNF from Six Shutdown Sites - 18042

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational. To provide an understanding of the tasks and interfaces required for the complete de-inventory of particular sites where SNF is stored, DOE solicited bids from integrating contractors to develop initial site-specific de-inventory reports. The reports were developed for several nuclear power plant sites selected to represent a range of geographic locations, existing on-site SNF storage systems, and expected transportation modal options. Each report is presented in a self-contained narrative describing a potential campaign for removing all SNF and greater-than-class-C low-level radioactive waste (GTCC waste) from each specified site. Each study narrative includes site information; an analysis of the near-site transportation infrastructure; a concept of operations for the de-inventory; an estimated budget and schedule for the duration of operations; and a safety and security plan with site-specific considerations, emergency response considerations, and recommendations for the next steps DOE could take to de-inventory the site. The reports provide cost estimates for analytical purposes only; they do not attempt to specify the party or parties responsible for the costs. These reports present a first look at how an integrating contractor might recommend removing SNF from particular sites. They are written from the perspective of the contractor and do not represent DOE's plans. At this writing, six sites have been studied: - Connecticut Yankee, - Big Rock Point, - Humboldt Bay, - Maine Yankee, - Trojan, - Kewaunee. DOE may develop de-inventory reports for all reactor sites, with an initial focus on shutdown reactor sites. The order in which sites have been selected for study should not be considered an indicator of the order used by DOE to remove SNF from the sites. Since the SNF's destination is not important for the purpose of this work, DOE tasked the contractor with planning transportation of the SNF from the site to a generic railroad location in the approximate geographical center of the United States. These reports represent an initial study of the specific sites. Per the terms of the contract, the contractor was not permitted to engage in dialogue with power plant site personnel; near-site railroad personnel; or any local, state, or regional stakeholders about the studies. DOE provided site-specific data. The contractor was tasked to rely on past corporate experience, data available from DOE, and publicly available data when making site-specific recommendations for removing all SNF from each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energize New York -- Residential Energy Efficiency Market Transformation in New York

Energize New York (ENY) is focused on addressing known barriers to widespread energy efficiency (EE) adoption by property owners. In simple terms ENY works to; 1) increase homeowner trust by using known and trusted community leaders to communicate their own positive experiences with EE and ENY, 2) reduce friction points by integrating support staff and creative use of technology that ease a homeowner’s way forward through the EE upgrade process, 3) increase homeowner knowledge and trust of specific EE benefits through access to the ENY energy coach, 4) provide information on available financing options that show benefits (e.g. positive cash flow), and 5) provide tools and mechanisms that give homeowners greater comfort in evaluating and selecting the right contractor. These five fundamental program aspects are supported by a hyper-local communications and outreach model and a “lead by example” philosophy that requires community leaders to step forward and model energy efficiency behavior by example. In the communities where the program has successfully engaged local leadership and “trusted community sources” there has been a significant increase in the uptake of energy efficiency work. Quantitatively this growth translated into an increase of 240% in completed Home Performance projects from the two year pre-pilot period (2009-10) to the two year post-pilot period (2012-13). Additionally, the program has seen measureable increases in the output and performance of contractors who are members of the Energize Comfort Corps, a program innovation which included a subset of the NYSERDA approved and Building Performance Institute accredited home performance contractors. This innovation, launched in the later stages of the pilot, is paired with the Energize Contractor Ratings Index (CRI) and helps frame the provider market by giving homeowners a mechanism to provide and receive feedback on their contractor experience. The data incorporated into the CRI along with the ECC selection process, has measurably reduced a key decision barrier (“which contractor should I use”) for homeowners engaged in the EE decision making process.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Multi-State Model for Catalyzing the National Home Energy Retrofit Market (Final Technical Report)

In the fall of 2010, the Alabama Department of Economic and Community Affairs (ADECA) launched the Multi-State Model for Catalyzing the National Home Energy Retrofit Market Project (Multi-State Project). This residential energy efficiency pilot program was a collaborative effort among the states of Alabama, Massachusetts, Virginia, and Washington, and was funded by competitive State Energy Program (SEP) awards through the U.S. Department of Energy (DOE). The objective of this project was to catalyze the home energy efficiency retrofit market in select areas within the state of Alabama. To achieve this goal, the project addressed a variety of marketplace elements that did not exist, or were underdeveloped, at the outset of the effort. These included establishing minimum standards and credentials for marketplace suppliers, educating and engaging homeowners on the benefits of energy efficiency and addressing real or perceived financial barriers to investments in whole-home energy efficiency, among others. The anticipated effect of the activities would be increased market demand for retrofits, improved audit to retrofit conversion rates and growth in overall community understanding of energy efficiency. The four-state collaborative was created with the intent of accelerating market transformation by allowing each state to learn from their peers, each of whom possessed different starting points, resources, and strategies for achieving the overall objective. The four partner states engaged the National Association of State Energy Officials (NASEO) to oversee a project steering committee and to manage the project evaluation for all four states. The steering committee, comprised of key program partners, met on a regular basis to provide overall project coordination, guidance, and progress assessment. While there were variances in program design among the states, there were several common elements: use of the Energy Performance Score (EPS) platform; an audit and home energy rating tool; emphasis on community based coordination and partnerships; marketing and outreach to increase homeowner participation; training for market actors; access to financing options including rebates, incentives, and loan products; and an in depth process evaluation to support continual program improvement and analysis. In Alabama, Nexus Energy Center operated energy efficiency retrofit programs in Huntsville and Birmingham. In the Huntsville community the AlabamaWISE program was available in five Alabama counties: Cullman, Lawrence, Limestone, Madison, and Morgan. In Birmingham, the program was available to residents in Jefferson and Shelby Counties. In both communities, the program was similar in terms of program design but tailored marketing and partnerships to address the unique local conditions and population of each community. ADECA and the Southeast Energy Efficiency Alliance (SEEA) provided overall project management services and common resources to the local program administrator Nexus Energy Center, including contracted services for contractor training, quality assurance testing, data collection and reporting, and compliance. The fundamental components of the AlabamaWISE program included a vertical contractor-based business model; comprehensive energy assessments; third-party quality assurance; rebates for installation of energy saving measures; accessible, low-interest financing; targeted and inbound marketing; Energy Performance Score (EPS) tool to engage and educate homeowners; training for auditors, contractors, and real estate professionals; and online resources for education and program enrollment. Program participants were eligible to receive rebates or financing toward the assessments and upgrades to their home provided they reached at least 20 percent deemed or modeled energy savings. The design of each program focused on addressing several known barriers including: limited homeowner knowledge on the benefits of energy efficiency, lack of financing options, lack of community support for energy efficiency programs, and lack of trained market actors including contractors and real estate professionals. The programs were able to make progress on addressing all of these barriers and were most successful in offering financing options and training market actors. The most challenging barriers proved to be the act of building a market for energy efficiency where none previously existed, convincing homeowners of the value in investing in energy efficiency (and therefore completing retrofits), engaging electric and natural gas utilities to partner on delivery, and achieving the overall project target of 1,365 completed retrofits. The components that proved to be the most valuable to program success were engaged contractor networks that could promote and endorse the program, partnerships with local business and organizations, and the access to rebates, incentives and financing mechanisms. The programs were successful in building relationships with a variety of community participants including: local contractors, Associations of REALTORS, home builders associations, universities, utilities, local and state governments, and other non-profit organizations. Throughout this program, 933 building audits and 795 building retrofits were completed making homes in Alabama more comfortable, less expensive to operate, more valuable to the marketplace, and safer and healthier for families. Continuing on this momentum, Nexus Energy Center plans to continue operating and expanding operations in Alabama as a Home Performance with ENERGY STAR sponsor and will continue to provide energy services and education to communities in Alabama.

Grimes, Elizabeth M.↗

A Survey of Direct Heating Equipment Market Actors in California

Direct Heating Equipment (DHE) is a category of ductless space heating appliances that provide warm air directly to the space where they are installed. We investigate, from the perspective of the DHE supply chain in California, what types of DHE are marketed in the state, how they are sold and serviced, and whether any potential barriers to adoption of high-efficiency DHE exist. We find that the market for DHE in the state is almost exclusively a replacement market, with some additional repair and maintenance services. We also find that, even though manufacturers sell high-efficiency DHE models in California, most contractors report installing baseline models most of the time. Contractors say their customers do not see any value in high-efficiency units, and they (contractors) do not believe that high-efficiency DHE is worth the additional cost to their customers. In addition, the majority of contractors purchase DHE from distributors and, therefore, distributors are a key piece of the supply chain that can constrain DHE purchase choice. Distributors do not see a demand for high-efficiency DHE and, hence, do not keep stock of these units. They argue that, since the market is driven mostly by replacements and these replacements occur typically in an unplanned way, homeowners are unwilling to pay for any additional costs associated with a high-efficiency model. Rather, homeowners usually prefer to replace the failed unit with a new unit that can fit in the same location with no- or minimal additional replacement costs. Considering that most DHE purchases are made by contractors, on behalf of their customers, informing contractors (and homeowners) of the potential cost-effectiveness of efficient DHE could help mitigate some of the barriers to the adoption of high-efficiency DHE in the state. In addition, monetary incentives and more stringent building codes that apply to DHE replacements can contribute to increasing adoption of high-efficiency DHE in California. This will not only reduce energy costs, but also increase safety and comfort to DHE users.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hanford External Dosimetry Technical Basis Manual PNL-MA-842

The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at Hanford. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with 10 CFR 835, DOELAP, DOE-RL, ORP, PNSO, and Hanford contractor requirements. The dosimetry system is operated by PNNL’s Hanford External Dosimetry Program (HEDP) which provides dosimetry services to all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee (HPDAC) which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture (ERICA) database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document.

61 RADIATION PROTECTION AND DOSIMETRY↗

Hanford External Dosimetry Technical Basis Manual PNL-MA-842

The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Maintenance and distribution of controlled hard copies of the manual by PNNL was discontinued beginning with Revision 0.2.

DOE↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Environmental Compliance at the Savannah River Site - 13024

The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an interagency 'SRS Regulatory Integration Team (SRIT)'. The SRIT is a partnership comprised of representatives from DOE-SR (with contractor support), EPA Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC) and is chartered to develop a consensus understanding of SRS regulatory issues and activities. These forums and a formal environmental compliance integration process improve timely cross-functional decision making, problem solving, information sharing, and issue resolution. The SRS internal process has been formally documented in an Environmental Regulatory Integration Program Description, which is linked to the SRS Environmental Policy and agreed upon by all major contractors, subcontractors and tenants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Department of Energy - Oak Ridge Operations and URS - CH2M Oak Ridge LLC. Partnering Framework for the Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 12348

The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal of safe, efficient cleanup, and (3) an implementation section which describes how the partnering process will be conducted, as well as how disputes will be managed. The signed Partnering Framework and Partnering Agreement provide the needed foundation of the safe and cost-effective cleanup and re-industrialization of the ETTP Site. The benefits of partnering have already been observed as the Partnering Teams effectively addressed a number of early contract and project challenges such as funding reductions and progress in resolving Material Differences. Based, in part of the successes achieved as a result of the partnering between UCOR and DOE-ORO, UCOR and DOE-ORO are extending this partnering approach to a number of the ETTP Site stakeholders. For example, DOE-ORO, UCOR and CROET signed a Partnering Agreement on November 3, 2011. This Partnering Agreement affirms the parties' commitment to work collaboratively to re-industrialize the ETTP Site. Both DOE-ORO and UCOR are looking to extend this partnering approach with other Site stakeholders such as its employees, its subcontractors, the Oak Ridge National Laboratory and the Y-12 Security Complex in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗