Search NASASearch

SEARCH · Search NASA

Results for “Capacity Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

CRADA Number NFE-21-08879 with Hempitecture Inc. (CRADA Final Report)

Participant is a company that was founded on the idea that sustainable materials can help build a better world. These materials can build a better world by preserving our health, saving energy, and storing carbon dioxide. Participant is at a critical juncture where it has significant sales and manufacturing capabilities that can bring innovative, low-carbon, hemp-based building products to market at scale in the United States, but the company has lacked the time and resources to conduct new product development and testing. At Innovation Crossroads, Participant plans to prototype, test, and develop its product roadmap while obtaining necessary performance and impact measurements of its hemp building products for commercialization. Coming into Innovation Crossroads, only one of Participant’s products has commercial sales, HempWool®. Investments are currently being made to add manufacturing capacity in the United States and to provide Participant with the capability to expand its product line throughout the building envelope.

36 MATERIALS SCIENCE

Parametric and Nonparametric Models of U.S. Cost Overruns for Nuclear Power Plants

This study presents new data-driven models to estimate the effect of capacity on the percentage of cost overruns in the United States for nuclear power plant construction projects before and after the Three Mile Island accident. Parametric and nonparametric models have been developed that describe the significant shifts in nuclear energy costs during the dynamic environment. Employing a contemporary descriptive methodology and a quantitative analysis, we furnish a comprehensive overview of the alterations in cost overrun distribution and show the changes observed in other pivotal metrics alongside cost overruns. Our emphasis lies in documenting the fluctuations in cost overruns alongside nuclear reactor capacity levels and the increase of the overnight capital costs to build nuclear reactors. Our results show that increasing the size of nuclear reactors is not a factor statistically significant to decrease the percentage of cost overruns, and the probit model results provide evidence that an increase in size increases the probability of having cost overruns larger than 100% (double the estimated cost). We also compare our findings to two other regions: Asia and Europe.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Women as a force multiplier for bringing nuclear forensic capabilities to the international stage

In 2009, the U.S. Department of Energy / National Nuclear Security Administration’s (DOE/NNSA) Defense Nuclear Nonproliferation (DNN) Program initiated a new nuclear forensics outreach effort under its Confidence Building Measures Program. Little did they know that the timing could not have been better. This article focuses on the early years (2009-2015) of the NNSA’s international nuclear forensics outreach, specifically the efforts and experiences of the women who helped establish this program, building it from a fledgling bilateral effort into an enduring technical capacity provider engaging with dozens of countries and multilateral organizations. At the onset of the program, nuclear forensics was an emerging priority within the U.S. Government and receiving increased focus from international organizations through high-level diplomatic efforts such as the Nuclear Security Summit and Global Initiative to Combat Nuclear Terrorism. Additionally, working-level initiatives were gaining traction through the International Atomic Energy Agency and the Nuclear Forensics International Technical Working Group. Over the next six years, a small team comprised of a uniquely large number of women NNSA federal, contract, and national laboratory staff served as key leaders engaging with the international community to strengthen global technical nuclear forensics capacity and best practices. The program continues today under the Nuclear Smuggling Detection and Deterrence Program as Investigation Support. The experiences shared here detail a unique time period when the new technical discipline of nuclear forensics was beginning to mature and gain international traction. The authors have made every effort to remember history correctly and be as inclusive as possible. A wealth of training, guidance, and exercises documentation was developed in the 2009-2015 timeframe, much of which still serves as the foundation for today’s even more extensive program and community of dedicated technical and diplomatic practitioners.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P

Phase change material-to-refrigerant heat exchangers: Experimental validation and uneven melting analysis

Thermal energy storage (TES) using phase change materials (PCMs) enables load shifting and reduces mismatches between the building's thermal demand and the heat pump (HP) system's thermal capacity. While most TES studies have focused on single-phase heat transfer fluids, PCM-to-refrigerant heat exchangers (PRHX), in which the refrigerant undergoes liquid-vapor phase change, remain largely underexplored. Here, to address this gap, this study systematically investigates a shell-and-tube PRHX operating as the condenser in an HP through experiments and simulations. A two-dimensional enthalpy-based finite-volume PRHX model was developed and validated against experimental data, including refrigerant and PCM temperature profiles, PRHX capacity, and system-level performance. Results show three characteristic stages: Stage I, the condenser temperature rapidly increases with PCM in the solid state absorbing sensible heat; Stage II, stable operation during PCM phase change; and Stage III, performance decline once part of the PCM becomes fully melted. Heat transfer analysis revealed that uneven PCM melting along the condenser length was driven primarily by variations in the refrigerant-side heat transfer coefficient, rather than local approach temperature differences. Further study demonstrated that minimizing refrigerant outlet subcooling led to more uniform PCM melting and extended Stages I and II by up to 89%. This paper provides a validated PRHX model, clarifies the mechanisms of uneven PCM melting, and highlights subcooling control as an effective strategy to improve TES performance in HP systems without requiring secondary loops.

Graphite matrix

Light Water Reactor Sustainability Program: Technical and Economic Considerations for Uprate of Existing Nuclear Reactors with Cogeneration

The United States nuclear reactor fleet consists of 63 pressurized water reactors and 31 boiling water reactors and is a pivotal component in the nation's energy infrastructure, supplying approximately 97 GW e of clean power. With the country's commitment to decarbonization by 2050, these reactors are not only instrumental in decarbonizing the electricity grid but also play a critical role in decarbonizing industrial processes, producing clean fuels, and scaling up CO 2 removal. This report delves into the potential for power uprates in the existing fleet to contribute to these decarbonization efforts, focusing on the expansion of capacity for applications such as hydrogen production and carbon capture and sequestration. Building on previous research, the report explores regional market demands for hydrogen, oxygen, and carbon dioxide, financial implications of oxygen and CO 2 sales from high-temperature steam electrolysis systems, and the potential for direct air capture systems paired with uprated nuclear plants.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION

Unlocking the Path to Decarbonized Building Thermal Systems: Strategies for Designers and Contractors: Preprint

The design and construction community plays a pivotal role in facilitating the transition to decarbonized thermal systems that maintain human comfort while reducing building emissions. Through the U.S. Department of Energy Better Buildings initiative's Design and Construction Allies, a cohort of leading architecture, engineering, and construction firms have identified top ranked barriers that designers and contractors face when implementing solutions for building owners. These barriers to decarbonizing thermal - especially heating - systems include equipment availability; electrical capacity constraints; space allocations; complex system configurations; and lack of experience in designing, installing, and maintaining heat pumps. These impediments significantly amplify the risk and financial burden associated with the adoption of decarbonized solutions. The barriers also decrease the likelihood that designers, contractors, and owners will adopt decarbonization strategies without clear plans and guidance on how to implement these solutions, mitigate risk, and overcome the identified barriers. The National Renewable Energy Laboratory, the Design and Construction Allies, and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers have developed "how to" thermal decarbonization guidance based on best practices. The subjects covered range from the role of energy efficiency in facilitating decarbonized heating solutions to strategies for decarbonizing new and existing heating, ventilating, and air-conditioning systems. The focus is on overcoming barriers so that energy-efficient, electrified buildings - both new and retrofit - become the industry standard. This paper outlines 1) the method used to collect and organize this guidance, 2) industry barriers to decarbonization, and 3) decarbonization techniques that have broad market applicability.

building heating

Wholesale Electricity Markets and Resource Adequacy with High Clean Energy Generation Targets

Wholesale electricity markets are intended to incentivize system generation investments and operations outcomes that meet evolving system needs. In this work, we evaluate the effectiveness of wholesale market structures, rules and policies in achieving system resource adequacy (RA) and clean energy targets in the presence of self-interested generation investors using the Electricity Markets and Investment Suite Agent-based Simulation (EMIS-AS) model. Results highlight that both capacity markets and operating reserve demand curves (ORDCs) can help achieve a reliable system but with different RA compliance timelines and distribution of generation technologies. Structures with capacity markets tend to favor more capital-intensive peaking technologies while reducing wind and solar build-outs due to suppressed energy and clean energy market prices, particularly in the absence of strong clean energy targets. Conversely, ORDCs improve the commitment of available generation units, but this comes at the expense of higher system costs and renewable generation curtailment. We also find that well-calibrated static capacity demand curves can yield similar reliability and total cost compared to capacity market demand curves informed dynamically by resource adequacy while also yielding stable annual capacity prices. Different approaches to formulating ORDC curves can also yield key trade-offs, namely that a more efficient treatment of storage chronology results in lower ORDC curves and prices, yielding less investment and cost but at the expense of reliability. Finally, the effectiveness of wholesale electricity markets in practically achieving very high clean energy generation targets highly depends on the cost-competitiveness of clean energy technologies that can support critical balancing needs across multiple timescales.

capacity expansion

Wholesale Electricity Market Design to Support Resource Adequacy

Wholesale electricity markets are intended to incentivize system generation investments and operations outcomes that meet evolving system needs. In this work, we evaluate the effectiveness of wholesale market structures, rules and policies in achieving system resource adequacy (RA) and clean energy targets in the presence of self-interested generation investors using the Electricity Markets and Investment Suite Agent-based Simulation (EMIS-AS) model. Results highlight that both capacity markets and operating reserve demand curves (ORDCs) can help achieve a reliable system but with different RA compliance timelines and distribution of generation technologies. Structures with capacity markets tend to favor more capital-intensive peaking technologies while reducing wind and solar build-outs due to suppressed energy and clean energy market prices, particularly in the absence of strong clean energy targets. Conversely, ORDCs improve the commitment of available generation units, but this comes at the expense of higher system costs and renewable generation curtailment. We also find that well-calibrated static capacity demand curves can yield similar reliability and total cost compared to capacity market demand curves informed dynamically by resource adequacy while also yielding stable annual capacity prices. Different approaches to formulating ORDC curves can also yield key trade-offs, namely that a more efficient treatment of storage chronology results in lower ORDC curves and prices, yielding less investment and cost but at the expense of reliability. Finally, the effectiveness of wholesale electricity markets in practically achieving very high clean energy generation targets highly depends on the cost-competitiveness of clean energy technologies that can support critical balancing needs across multiple timescales.

agent based modeling

Battery Energy Storage Systems Report

Battery energy storage systems (BESS) are a critical component of grid reliability and resilience today, providing rapid response capabilities while enabling grid modernization and capacity expansion across the United States. As utilities, communities, and customers prepare to deploy significant BESS capacity over the next several years, the United States has an opportunity to build security into battery system design and deployments. This report provides a framework for assessing the current dominance of foreign-manufactured components in the supply chains for BESS, inverter-based resources, and transformers. It offers high-impact, actionable solutions to service partners, industry, and government to address supply chain risks for currently installed, in design, and future deployments.

24 - POWER TRANSMISSION AND DISTRIBUTION

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence

Implementation and validation of optimal start control strategy for air conditioners and heat pumps

Commercial buildings are responsible for approximately 20 % of the total energy consumption and greenhouse gas emissions in the United States. Over 85 % of these buildings lack building automation systems, and many are small (<50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, several operational deficiencies lead to excess energy consumption. Studies have shown that managing the RTUs’ heating and cooling set points, schedules, setbacks, and optimal start can result in a 20 % to 25 % reduction in electricity consumption in small commercial buildings. These buildings typically use fixed schedules to start the RTUs 60 to 120 min before occupancy begins, which results in excess energy consumption. This paper presents research that demonstrates and evaluates the performance of four optimal start methods, which utilize data-based modeling as a key element in facilitating adaptive control in response to time-varying inputs while requiring minimal sensor inputs. The evaluation found energy savings in two commercial buildings equipped with RTUs by periodically alternating four different optimal start models during the cooling and heating season. The resulting energy savings are positive for all models and range from 2 to 5 kWh/day/unit. The units on the east side of the building showed higher savings, while interior units showed greater variability in savings due to the differences in capacities and room sizes. Savings were considerably greater during the heating season compared to the cooling season. The performance of all four models on Mondays was poor; models suggested a shorter optimal start time, which resulted in relatively larger errors. Finally, the future work will look at using a different model for the days after weekends and holidays.

42 ENGINEERING

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

Post-build stress-relief optimization for laser powder bed fusion 316H stainless steel

Nuclear energy remains a critical component of a diversified and efficient energy portfolio, offering reliable, high-capacity, and low-carbon power. However, in the U.S., aging infrastructure and the slow qualification and deployment of advanced materials and manufacturing techniques hinder progress in next-generation reactor technologies. This study explores the application of laser powder bed fusion (LPBF) additive manufacturing for stainless steel 316H, with a focus on optimizing post-build heat treatments to enhance material properties for high-temperature nuclear applications. The research targets the optimization of stress-relief temperatures to alleviate postbuild residual stresses, ensuring improvements in the microstructural corelated properties. A series of microstructural and mechanical evaluations were performed on LPBF-printed SS-316H samples which were subjected to annealing at temperatures varying between 650 °C and 850 °C. X-ray diffraction, scanning electron microscopy, and transmission electron microscopy analyses revealed that increasing the heattreatment temperature accelerated dislocation recovery. Vickers microhardness measurements showed an initial reduction in values, followed by stabilization over extended durations at all the temperatures. While higher temperatures facilitated faster recovery, they also promoted carbide precipitation along grain and solidification cell boundaries, narrowing the safe processing window. In contrast, heat treatment at 650°C preserved the cellular substructure and enabled controlled carbide precipitation over time. In conclusion, these findings highlight the importance of time–temperature optimization and suggest that 650°C for up to 2 h provides the most favorable balance between recovery and carbide control for a stress-relief treatment.

316 stainless steel

Electrolyte and Cutoff Potential Effects on Cycle Life of Li4Ti5O12/LiNi0.9Mn0.1O2 Batteries for Behind-the-Meter Storage Applications

Behind-the-Meter Storage (BTMS) is a stationary battery energy storage system that is connected to the electrical distribution system on the customer's side of the utility's service meter. BTMS systems are used to store electrical energy from the grid as well as inconstant, renewable energy, such as local solar and wind generation. A successful BTMS system will allow the customer to pair their energy generation and storage to optimize electrical consumption from the grid, improving reliability and minimizing cost. For BTMS applications, batteries must be designed and optimized with different set of criteria from other leading segments of the Li-ion battery market, like transportation, due the system being stationary and proximal to the residential or commercial building it's benefitting. BTMS applications prioritize safety, cost (low/no-critical materials), reliability (20-year calendar life), and durability (10,000 cycle life), while having the ability to (minimally) compromise energy density and rate capability. Lithium titanate (Li4Ti5O12-, LTO) is a promising anode candidate for BTMS applications due to its high safety and capacity retention, while maintaining a reasonable 160 mAhg-1 reversable capacity and composition of relatively abundant materials. (1) Specifically, LTO has a high working voltage which helps to prevent Li dendrite formation, improving safety. Furthermore, LTO also has negligible lithiation-based volume change, leading to less mechanical pulverization, or loss of active material, upon cycling. For the cathode, materials with little or no Co are of high interest due to the high cost and low abundance of Co. LiMn2O4 (LMO) has been paired with LTO for BTMS applications in the past due to its safety, low cost (abundancy), and reasonably high operating voltage. (2-4) However, the low capacity of LMO limits energy density and specific energy. While not the highest priority for BTMS applications, increasing energy density will enable deployment in space constrained BTMS applications and decrease total cost. LiNi0.9Mn0.1O2 (LN-MO) is a recently developed material with promise due to its high operating voltage and relatively low price. (5) However, Ni-rich layered oxides, including LNMO, tend to struggle with capacity retention during high-voltage cycling due to mechanical pulverization, irreversible phase transitions, and unstable solid-electrolyte interphase. The study presented here focuses on building an understanding of how electrolyte solvent and varied cutoff potentials will impact the cycle life of LTO/LN-MO cells. Specifically, a comparison is provided between ethylene carbonate (EC), ethyl methyl carbonate (EMC), fluoroethylene carbonate (FEC), and Gen2 electrolyte solvents with 1M Lithium hexafluorophosphate (LiPF6) salt, cycling to two upper termination potentials, 2.6V and 2.7V. Electrochemical testing and diagnostics (e.g., differential capacity analysis, area specific impedance, constant voltage hold, and rate capability) and post-mortem characterization will be used to understand the aging behavior and failure mechanisms of the 8 cell combinations (four electrolytes and two voltage cutoffs). Cells with FEC electrolyte showed a lower initial capacity compared to cells with Gen2, EMC, and EC cycling at both voltages; however, the cells with FEC showed consistent trends in capacity retention with 2.6V and 2.7V termination potentials, while the cells with the other electrolytes showed much higher rates of capacity loss when cycling to the higher voltage. These results indicate that FEC may play a role in improving durability of high-voltage, Ni-rich electrode systems for use in high-cycle applications, such as BTMS.

electrolyte

Optimizing Heat Recovery with Storage: Control Validation and Sensitivity Analysis of the Time-Independent Energy Recovery Plant Using Modelica

Heat recovery in large building central plants saves energy but traditionally requires simultaneous heating and cooling. The Time-Independent Energy Recovery (TIER) plant shifts this paradigm by integrating thermal energy storage (TES) to enable heat recovery regardless of concurrent demand, offering a highly efficient, space-saving solution to achieve California’s energy goals. However, its integration of heat recovery chillers, cooling-only chillers, cooling towers, and trim air-source heat pumps (ASHPs) creates growing control and sizing complexity. To overcome this, this study employs high-fidelity Modelica dynamic simulation to validate TIER control sequences and optimize equipment sizing. We translated the written Sequences of Operation into executable Control Description Language (CDL) to test logic against sub-hourly loads. This verification workflow successfully identified and resolved critical vulnerabilities, such as thermal storage freezing and equipment short-cycling, in a virtual environment prior to physical deployment. Then, the study analyzes TIER plant performance across three simulated building types in three locations, and a real building load profile, ensuring variety in heating and cooling loads, and simultaneity factors and explores sizing rules for the TES and ASHP capacity. The analysis shows that the TIER plant operates equipment efficiently leading to a plant SCOP of around 7.5 across all scenarios, higher than a traditional ASHP plant, and a viable pathway to de-risk complex system design and control through simulation to identify optimal designs that maximize energy efficiency, minimize operational costs, and ensure robust operation in varied environmental conditions, thereby facilitating the broader adoption of such a solution for large buildings.

Zanetti, Ettore

Physical Properties of Hilti HIT-RE 500 V3 After Irradiation: Slant Shear, Tensile, Flexural, and Compressive

There are various applications in which epoxy adhesives may be used within hot-cell environments. These epoxies currently see limited use within hot cells since it is known that organics see degradation after small doses even as low as 50 kilogray (kGy). These losses in physical property strengths limit the use of these epoxies to non-structural applications. In modern construction, however, the use of epoxies to bond structural components such as rebar or threaded anchors is becoming increasingly prevalent. To employ these types of materials the Idaho National Laboratory (INL) has begun investigating the specific degradation properties of epoxies for use in structural applications in environments where radiation is present. Hilti HIT-RE 500 V3 is used extensively in new construction and renovation projects across the world. The INL has conducted various tests on this epoxy for low dose environments. These tests include tensile, flexural, compression, and slant shear tests following the American Society for Testing Material International (ASTM) standards D638, D790, D695, and C882/882M respectively. Two sample sets for each test were created where the baseline specimens were not irradiated, and another set was irradiated to an accumulated dose of approximately 50-60 kGy. All the samples were destructively tested and analyzed focusing on the change in physical properties, examples of these tests are shown in Figures 1-4. Tensile testing results indicate a 0.9% loss in maximum load capacity, a 0.5% loss in tensile stress at maximum load, a 1.4% loss in tensile strain at break, and a 15% decrease in modulus of elasticity. Flexural testing results display an increase in all the following: 12% in strain at maximum load, 10% in maximum load capacity, 5% in stress at maximum load, and 3% in young’s modulus. The compressive physical properties after irradiation display a 1% increase in maximum load, a 3% decrease in stress at yield, and a 5% decrease in modulus of elasticity. The maximum compressive stress saw no measurable change after irradiation. The slant shear specimens after irradiation displayed a 2% increase in maximum load capacity and maximum compressive stress. Though a structural analysis would have to be completed as is normal for building design the increases and decreases in the measured physical properties indicate that this material may be used for structural applications in low dose hot-cell environments without adhesive failure.

36 MATERIALS SCIENCE