Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communications Services Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Completion of NASA’s Two-Year Laser Communications Relay Demonstration (LCRD) Experiment Program

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed its two-year experiment program in June 2024. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload relays data between two optical ground stations located in California and Hawaii and can also exchange data with an RF ground station in New Mexico. The addition of the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station in 2023 enabled data relay demonstrations between a laser terminal in low Earth orbit and either one of the optical ground stations or the RF ground station. The experiment program has included a variety of experiments originating within the LCRD project, NASA, and industry. The experiments have included measurements of the effects of the atmospheric optical channel (turbulence, weather) on the performance and availability of laser communications, adaptive optics characterization, demonstration of optimetrics techniques, and demonstration of Delay/Disruption Tolerant Networking (DTN). Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations have been emulated. This conference paper provides an overview and highlights of the LCRD experiment program with an emphasis on activities and results since the start of the ILLUMA-T testing in December 2023. A discussion of the expectations for the next phase of the LCRD mission, as well as how LCRD results may be applied to future applications is also included. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

Laser communications↗

Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Walton, M.↗

Completion of NASA’s Two-Year Laser Communications Relay Demonstration (LCRD) Experiment Program

"The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed its two-year experiment program in June 2024. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload relays data between two optical ground stations located in California and Hawaii and can also exchange data with an RF ground station in New Mexico. The addition of the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station in 2023 enabled data relay demonstrations between a laser terminal in low Earth orbit and either one of the optical ground stations or the RF ground station. The experiment program has included a variety of experiments originating within the LCRD project, NASA, and industry. The experiments have included measurements of the effects of the atmospheric optical channel (turbulence, weather) on the performance and availability of laser communications, adaptive optics characterization, demonstration of optimetrics techniques, and demonstration of Delay/Disruption Tolerant Networking (DTN). Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations have been emulated. This conference paper provides an overview and highlights of the LCRD experiment program with an emphasis on activities and results since the start of the ILLUMA-T testing in December 2023. A discussion of the expectations for the next phase of the LCRD mission, as well as how LCRD results may be applied to future applications is also included. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). "

Lasercom↗

Exploring New Frontiers in Space Communications: Enhancing Delay Tolerant Networking through Cloud and Containerization

The High-rate Delay Tolerant Networking (HDTN) project at NASA Glenn Research Center has developed software that enables more flexible, reliable, and efficient space internetworking by using modern computing techniques such as cloud services, microservices, network function virtualization, software defined networking, and a distributed architecture. HDTN is built upon the Bundle Protocol and related convergence layers which have been developed to mitigate the challenges of the space networking environment including long delays, asymmetric data rates, and intermittent connectivity. The HDTN implementation employs asynchronous message processing tasks which allow for non-blocking operations as well as deployment in both centralized and distributed architectures. This paper investigates deploying HDTN in a containerized approach on the NASA Goddard’s Mission Cloud Platform using Amazon Web Services Elastic Compute Cloud (EC2). Commercial cloud computing will lower operating costs, provide flexible resource allocation, and allow for interconnectivity between multiple NASA centers as well as external partners. Containerization using Docker will enable greater portability and scalability for HDTN to be deployed into a variety of environments. We discuss possible NASA missions and use-cases such as the Laser Communications Relay Demonstration (LCRD) where the services provided by HDTN (reliable transport, high-rate message processing, and store-and-forward capabilities) will be enhanced through cloud computing and containerization. In addition, we describe the HDTN architecture and possible microservice-based networking approaches that can be obtained via HDTN’s configuration capabilities. Finally, we detail the EC2 specifications needed to achieve data rates greater than 1 Gbps to support optical communication missions such as LCRD.

Blake LaFuente↗

Update on NASA's Laser Communications Relay Demonstration Project

This paper provides an update on NASA's Laser Communications Relay Demonstration Project (LCRD), a joint project between NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). LCRD will provide a minimum of two years of high data rate optical communications services to demonstrate a concept of operations for future mission critical Earth relay satellites. LCRD is expected to launch in June 2019 and demonstrate how optical communications can meet NASA's growing need for higher data rates, or for the same data rate provided by a comparable RF system, how it enables lower power, lower mass communications systems on user spacecraft. In addition, LCRD's architecture will allow it to serve as a testbed in space for the development of additional symbol coding, link and network layer protocols, etc. LCRD's mission and architecture has slowly evolved since the project first started and this paper will provide an update of LCRD and planned capabilities and experiments.

Optical Communications↗

Enabling Communication and Navigation Technologies for Future Near Earth Science Missions

In 2015, the Earth Regimes Network Evolution Study (ERNESt) proposed an architectural concept and technologies that evolve to enable space science and exploration missions out to the 2040 timeframe. The architectural concept evolves the current instantiations of the Near Earth Network and Space Network with new technologies to provide a global communication and navigation network that provides communication and navigation services to a wide range of space users in the near Earth domain. The technologies included High Rate Optical Communications, Optical Multiple Access (OMA), Delay Tolerant Networking (DTN), User Initiated Services (UIS), and advanced Position, Navigation, and Timing technology. This paper describes the key technologies and their current technology readiness levels. Examples of science missions that could be enabled by the technologies and the projected operational benefits of the architecture concept to missions are also described.

Laser↗

Transition From NASA Space Communication Systems to Commerical Communication Products

Transitioning from twenty-five years of space communication system architecting, engineering and development to creating and marketing of commercial communication system hardware and software products is no simple task for small, high-tech system engineering companies whose major source of revenue has been the U.S. Government. Yet, many small businesses are faced with this onerous and perplexing task. The purpose of this talk/paper is to present one small business (LinCom) approach to taking advantage of the systems engineering expertise and knowledge captured in physical neural networks and simulation software by supporting numerous National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD) projects, e.g., Space Shuttle, TDRSS, Space Station, DCSC, Milstar, etc. The innovative ingredients needed for a systems house to transition to a wireless communication system products house that supports personal communication services and networks (PCS and PCN) development in a global economy will be discussed. Efficient methods for using past government sponsored space system research and development to transition to VLSI communication chip set products will be presented along with notions of how synergy between government and industry can be maintained to benefit both parties.

Ghazvinian, Farzad↗

Software Project Management and Measurement on the World-Wide-Web (WWW)

We briefly describe a system for forms-based, work-flow management that helps members of a software development team overcome geographical barriers to collaboration. Our system, called the Web Integrated Software Environment (WISE), is implemented as a World-Wide-Web service that allows for management and measurement of software development projects based on dynamic analysis of change activity in the workflow. WISE tracks issues in a software development process, provides informal communication between the users with different roles, supports to-do lists, and helps in software process improvement. WISE minimizes the time devoted to metrics collection and analysis by providing implicit delivery of messages between users based on the content of project documents. The use of a database in WISE is hidden from the users who view WISE as maintaining a personal 'to-do list' of tasks related to the many projects on which they may play different roles.

Callahan, John↗

Integrated Medical Model Verification, Validation, and Credibility

The Integrated Medical Model (IMM) was designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic (stochastic process) model based on historical data, cohort data, and subject matter expert opinion. A probabilistic approach is taken since exact (deterministic) results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation. METHODS: In 2008, the IMM team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) was published, the IMM team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. RESULTS: IMM VVC updates are compiled recurrently and include 7009 Compliance and Credibility matrices, IMM VV Plan status, and a synopsis of any changes or updates to the IMM during the reporting period. Reporting tools have evolved over the lifetime of the IMM project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the NASA-STD-7009 Guidance Document. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including Operations, Science and Technology Planning, and Exploration Planning. CONCLUSIONS: The VVC approach established by the IMM project of combining the IMM VV Plan with 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Validation↗

Re-engineering Nascom's network management architecture

The development of Nascom systems for ground communications began in 1958 with Project Vanguard. The low-speed systems (rates less than 9.6 Kbs) were developed following existing standards; but, there were no comparable standards for high-speed systems. As a result, these systems were developed using custom protocols and custom hardware. Technology has made enormous strides since the ground support systems were implemented. Standards for computer equipment, software, and high-speed communications exist and the performance of current workstations exceeds that of the mainframes used in the development of the ground systems. Nascom is in the process of upgrading its ground support systems and providing additional services. The Message Switching System (MSS), Communications Address Processor (CAP), and Multiplexer/Demultiplexer (MDM) Automated Control System (MACS) are all examples of Nascom systems developed using standards such as, X-windows, Motif, and Simple Network Management Protocol (SNMP). Also, the Earth Observing System (EOS) Communications (Ecom) project is stressing standards as an integral part of its network. The move towards standards has produced a reduction in development, maintenance, and interoperability costs, while providing operational quality improvement. The Facility and Resource Manager (FARM) project has been established to integrate the Nascom networks and systems into a common network management architecture. The maximization of standards and implementation of computer automation in the architecture will lead to continued cost reductions and increased operational efficiency. The first step has been to derive overall Nascom requirements and identify the functionality common to all the current management systems. The identification of these common functions will enable the reuse of processes in the management architecture and promote increased use of automation throughout the Nascom network. The MSS, CAP, MACS, and Ecom projects have indicated the potential value of commercial-off-the-shelf (COTS) and standards through reduced cost and high quality. The FARM will allow the application of the lessons learned from these projects to all future Nascom systems.

Drake, Brian C.↗

A statistical rain attenuation prediction model with application to the advanced communication technology satellite project. 1: Theoretical development and application to yearly predictions for selected cities in the United States

A rain attenuation prediction model is described for use in calculating satellite communication link availability for any specific location in the world that is characterized by an extended record of rainfall. Such a formalism is necessary for the accurate assessment of such availability predictions in the case of the small user-terminal concept of the Advanced Communication Technology Satellite (ACTS) Project. The model employs the theory of extreme value statistics to generate the necessary statistical rainrate parameters from rain data in the form compiled by the National Weather Service. These location dependent rain statistics are then applied to a rain attenuation model to obtain a yearly prediction of the occurrence of attenuation on any satellite link at that location. The predictions of this model are compared to those of the Crane Two-Component Rain Model and some empirical data and found to be very good. The model is then used to calculate rain attenuation statistics at 59 locations in the United States (including Alaska and Hawaii) for the 20 GHz downlinks and 30 GHz uplinks of the proposed ACTS system. The flexibility of this modeling formalism is such that it allows a complete and unified treatment of the temporal aspects of rain attenuation that leads to the design of an optimum stochastic power control algorithm, the purpose of which is to efficiently counter such rain fades on a satellite link.

Manning, Robert M.↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗

Autonomous Navigation With Ground Station One-Way Forward-Link Doppler Data

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has spent several years developing operational onboard navigation systems (ONS's) to provide real time autonomous, highly accurate navigation products for spacecraft using NASA's space and ground communication systems. The highly successful Tracking and Data Relay Satellite (TDRSS) ONS (TONS) experiment on the Explorer Platform/Extreme Ultraviolet (EP/EUV) spacecraft, launched on June 7, 1992, flight demonstrated the ONS for high accuracy navigation using TDRSS forward link communication services. In late 1994, a similar ONS experiment was performed using EP/EUV flight hardware (the ultrastable oscillator and Doppler extractor card in one of the TDRSS transponders) and ground system software to demonstrate the feasibility of using an ONS with ground station forward link communication services. This paper provides a detailed evaluation of ground station-based ONS performance of data collected over a 20 day period. The ground station ONS (GONS) experiment results are used to project the expected performance of an operational system. The GONS processes Doppler data derived from scheduled ground station forward link services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination. Analysis of the GONS experiment performance indicates that real time onboard position accuracies of better than 125 meters (1 sigma) are achievable with two or more 5-minute contacts per day for the EP/EUV 525 kilometer altitude, 28.5 degree inclination orbit. GONS accuracy is shown to be a function of the fidelity of the onboard propagation model, the frequency/geometry of the tracking contacts, and the quality of the tracking measurements. GONS provides a viable option for using autonomous navigation to reduce operational costs for upcoming spacecraft missions with moderate position accuracy requirements.

Horstkamp, G. M.↗

ISAIA: Interoperable Systems for Archival Information Access

The ISAIA project was originally proposed in 1999 as a successor to the informal AstroBrowse project. AstroBrowse, which provided a data location service for astronomical archives and catalogs, was a first step toward data system integration and interoperability. The goals of ISAIA were ambitious: '...To develop an interdisciplinary data location and integration service for space science. Building upon existing data services and communications protocols, this service will allow users to transparently query hundreds or thousands of WWW-based resources (catalogs, data, computational resources, bibliographic references, etc.) from a single interface. The service will collect responses from various resources and integrate them in a seamless fashion for display and manipulation by the user.' Funding was approved only for a one-year pilot study, a decision that in retrospect was wise given the rapid changes in information technology in the past few years and the emergence of the Virtual Observatory initiatives in the US and worldwide. Indeed, the ISAIA pilot study was influential in shaping the science goals, system design, metadata standards, and technology choices for the virtual observatory. The ISAIA pilot project also helped to cement working relationships among the NASA data centers, US ground-based observatories, and international data centers. The ISAIA project was formed as a collaborative effort between thirteen institutions that provided data to astronomers, space physicists, and planetary scientists. Among the fruits we ultimately hoped would come from this project would be a central site on the Web that any space scientist could use to efficiently locate existing data relevant to a particular scientific question. Furthermore, we hoped that the needed technology would be general enough to allow smaller, more-focused community within space science could use the same technologies and standards to provide more specialized services. A major challenge to searching for data across a broad community is that information that describe some data products are either not relevant to other data or not applicable in the same way. Some previous metadata standard development efforts (e.g., in the earth science and library communities) have produced standards that are very large and difficult to support. To address this problem, we studied how a standard may be divided into separable pieces. Data providers that wish to participate in interoperable searches can support only those parts of the standard that are relevant to them. We prototyped a top-level metadata standard that was small and applicable to all space science data.

Hanisch, Robert J.↗

Evolution of the Lunar Network

The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.

Gal-Edd, Jonathan↗

A Prototyping Effort for the Integrated Spacecraft Analysis System

Computer modeling and simulation has recently become an essential technique for predicting and validating spacecraft performance. However, most computer models only examine spacecraft subsystems, and the independent nature of the models creates integration problems, which lowers the possibilities of simulating a spacecraft as an integrated unit despite a desire for this type of analysis. A new project called Integrated Spacecraft Analysis was proposed to serve as a framework for an integrated simulation environment. The project is still in its infancy, but a software prototype would help future developers assess design issues. The prototype explores a service oriented design paradigm that theoretically allows programs written in different languages to communicate with one another. It includes creating a uniform interface to the SPICE libraries such that different in-house tools like APGEN or SEQGEN can exchange information with it without much change. Service orientation may result in a slower system as compared to a single application, and more research needs to be done on the different available technologies, but a service oriented approach could increase long term maintainability and extensibility.

mission planning↗

Enabling Communication and Navigation Technologies for Future Near Earth Science Missions

In 2015, the Earth Regimes Network Evolution Study (ERNESt) Team proposed a fundamentally new architectural concept, with enabling technologies, that defines an evolutionary pathway out to the 2040 timeframe in which an increasing user community comprised of more diverse space science and exploration missions can be supported. The architectural concept evolves the current instantiations of the Near Earth Network and Space Network through implementation of select technologies resulting in a global communication and navigation network that provides communication and navigation services to a wide range of space users in the Near Earth regime, defined as an Earth-centered sphere with radius of 2M Km. The enabling technologies include: High Rate Optical Communications, Optical Multiple Access (OMA), Delay Tolerant Networking (DTN), User Initiated Services (UIS), and advanced Position, Navigation, and Timing technology (PNT). This paper describes this new architecture, the key technologies that enable it and their current technology readiness levels. Examples of science missions that could be enabled by the technologies and the projected operational benefits of the architecture concept to missions are also described.

Networking↗

Need for, and financial feasibility of, satellite-aided land mobile communications

Questions regarding the role of a mobile-satellite system in augmenting the terrestrial communications system are considered, and a market assessment study is discussed. Aspects of an investment analysis are examined, taking into account a three phase financial study of four postulated land Mobile Satellite Service (LMSS) systems, project profitability evaluation methods, risk analysis methods, financial projections, potential investor acceptance standards, and a risk analysis. It is concluded that a satellite augmented terrestrial mobile service appears to be economically and technically superior to a service depending exclusively on terrestrial systems. The interest in the Mobile Satellite Service is found to be worldwide, and the ground equipment market is potentially large.

Castruccio, P. A.↗