A Generalized Nuclear Code of Accounts for Cost Estimation Standardization

This is a joint INL-EPRI study. Link to corresponding page at the Electric Power Research Institute (EPRI): https://www.epri.com/research/products/000000003002028937 Recent Advanced Reactor (AR) designs typically offer features and attributes that depart from traditional water-cooled reactors in terms of fuel forms, coolants, structural materials, size, safety margins, and other important design and operational aspects. These departures, relative to the industry experience, will likely present a challenge for potential owner-operators when evaluating one or more AR designs for commercial deployment on a like-for-like basis. This is further exacerbated with new classes of reactors gaining prominence (e.g., microreactors) and new emerging applications (e.g., floating barge reactors or space propulsion reactors). The differences in design-specific technologies are compounded by the differences in approach to cost estimation. The lack of consistency in build up toward cost estimates creates a challenge when comparing competing concepts and evaluating their associated cost drivers. The outcome of a 2019 Scoping Study conducted by the Electric Power Research Institute (EPRI) indicated the need for a cost modeling guide (CMG), which would be underpinned by a technology-neutral and inclusive Generalized Nuclear Code of Accounts (GN-COA). A code of accounts (COA) is a tool by which costs are identified in even more specific categories, providing clarity on what specific costs are included in an estimate. A parallel independent effort was meanwhile taking place at Idaho National Laboratory via funding by the Systems Analysis Integration (SA&I) campaign of the Office of Nuclear Energy under the U.S. Department of Energy (U.S. DOE-NE) to also update the COA structure to enable more flexibility and encompass a wider variety of reactor technologies. After being made aware of these synergistic efforts, the two parties decided to combine efforts and develop a joint new standard format for nuclear cost estimation that builds on previous structures. This document describes the development of this joint GN-COA and provides guidance on the implementation of the tool, which is provided as the associated GN-COA Excel document. The main attributes of this novel COA format are that all items are functionally defined (in order to be technology and application agnostic) and grouped into logical arrangements that facilitate the tabulation of costs for reactor constructions under consideration. The intent is for the GN-COA to form a standard that is endorsed by future vendors and customers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Weight and cost estimating relationships for heavy lift airships

Weight and cost estimating relationships, including additional parameters that influence the cost and performance of heavy-lift airships (HLA), are discussed. Inputs to a closed loop computer program, consisting of useful load, forward speed, lift module positive or negative thrust, and rotors and propellers, are examined. Detail is given to the HLA cost and weight program (HLACW), which computes component weights, vehicle size, buoyancy lift, rotor and propellar thrust, and engine horse power. This program solves the problem of interrelating the different aerostat, rotors, engines and propeller sizes. Six sets of 'default parameters' are left for the operator to change during each computer run enabling slight data manipulation without altering the program.

Gray, D. W.↗

Conceptual Design and Cost Estimate of a Subsonic NASA Testbed Vehicle (NTV) for Aeronautics Research

A conceptual design and cost estimate for a subsonic flight research vehicle designed to support NASA's Environmentally Responsible Aviation (ERA) project goals is presented. To investigate the technical and economic feasibility of modifying an existing aircraft, a highly modified Boeing 717 was developed for maturation of technologies supporting the three ERA project goals of reduced fuel burn, noise, and emissions. This modified 717 utilizes midfuselage mounted modern high bypass ratio engines in conjunction with engine exhaust shielding structures to provide a low noise testbed. The testbed also integrates a natural laminar flow wing section and active flow control for the vertical tail. An eight year program plan was created to incrementally modify and test the vehicle, enabling the suite of technology benefits to be isolated and quantified. Based on the conceptual design and programmatic plan for this testbed vehicle, a full cost estimate of $526M was developed, representing then-year dollars at a 50% confidence level.

Nickol, Craig L.↗

Improved Cost Estimates to Boost Pumped Storage Hydropower Construction

Pumped storage hydropower is often overlooked in future grid planning efforts, in part because the cost to build a new facility is not always clear. That's why the National Renewable Energy Laboratory (NREL), along with the U.S. Department of Energy's Water Power Technologies Office, is developing improved cost estimates and cost models to reduce that uncertainty and give developers the data they need to decide where and when to construct new PSH facilities to support the country's evolving energy grid.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Estimating Costs Of Aerospace Construction

Report presents brief descriptions of techniques, instructional and reference literature, computer hardware and software, and compilations of data used to estimate costs of specially equipped buildings and other aerospace construction projects. Descriptions replete with practical examples. Experiences gained in estimating costs of specific projects included.

Brown, Joseph A.↗

Energy Cost Estimate Tool v2.0: Methodology and Usage

Information about home energy costs is essential for appraisers, lenders, and buyers, but reliable data are often unavailable in real estate transactions. To fill this gap, the National Laboratory of the Rockies developed the Energy Cost Estimate (ECE) tool. The tool provides flexible, data-driven estimates of annual household energy use and costs across the contiguous United States, using only a small number of inputs typically found in mortgage appraisals. This report presents the methodology behind version 2.0 of the ECE tool, demonstrates how users can generate estimates through its interface, and discusses its applications and limitations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

COMPACT KNN V2: Analogy-Based Cost Estimation Model for CubeSats

The CubeSat Or Microsat Probabilistic and AnalogiesCost Tool, or COMPACT, is a NASA Headquarters fundedeffort to fill the gap in cost estimating capabilities for CubeSats,as well as other microsat spacecraft. The COMPACT team hasfocused mainly on CubeSats to date, and has collected technical,programmatic and cost data on dozens of flown CubeSatsmissions led by NASA, research labs, and universities. In late2019, the team released the first tool prototype which uses a nonparametricregression technique, k-Nearest Neighbors (KNN),on actual data from historical CubeSat missions to produceearly ballpark analogy-based cost estimates for new CubeSatconcepts. Since the KNN prototype was first released, theCOMPACT team has normalized 17 new missions to be addedto the model in COMPACT V2. COMPACT V2 also featureschanges to the KNN tool algorithm including the introduction ofPrincipal Component Analysis (PCA) to the model developmentprocess and changes to the input parameters which have madethe analogy results more intuitive and have improved modelperformance. This paper describes the current COMPACTKNN dataset, improvements made to the model in COMPACTV2, an assessment of current model performance, and a forwardlook at COMPACT’s planned future enhancements.

Hooke, Melissa↗

FC-PLACER (Fuel Cell Plant Layout and Cost Estimation Resource) [SWR-26-027]

The Fuel Cell Plant Layout and Cost Estimation Resource (FC-PLACER) is a tool to perform a footprint and cost analysis for hydrogen fuel cell based power plants. This analysis tool provides a comprehensive design and cost assessment for a 100-MW stationary PEM fuel cell power plant, utilizing specifications from commercially available PEM fuel cell modules originally designed for heavy-duty vehicle applications. Additionally, the tool offers flexibility, enabling adaptation to various capacity requirements or plant configurations and facilitating the evaluation of system layout and overnight costs. In particular, it includes a detailed accounting of balance of plant material and labor costs and enables a precise estimate of plant spatial footprint.

Reznicek, Evan [National Laboratory of the Rockies↗

Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE

As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Blind Validation Study of Parametric Cost Estimation Tool SEER-H for NASA Space Missions

One of the primary parametric cost modeling tools used by NASA and the aerospace industry to estimate the development and production cost of future spacecraft hardware is SEER-H by Galorath. To date, no independent validation of this tool for cost estimation of space missions has been reported in the literature. In the present validation study, cost estimators used SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. The point estimates of SEER-H had an average error of 23%, median error of -0.3%, and a standard deviation of 43%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates. Several factors independent of SEER that may have affected the accuracy of the results have been identified and are discussed; these include: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER-H↗