Search NASA⌕ Search

SEARCH · Search NASA

Results for “Credibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Integrated System Health Management (ISHM): Systematic Capability Implementation

This paper provides a credible approach for implementation of ISHM capability in any system. The requirements and processes to implement ISHM capability are unique in that a credible capability is initially implemented at a low level, and it evolves to achieve higher levels by incremental augmentation. In contrast, typical capabilities, such as thrust of an engine, are implemented once at full Functional Capability Level (FCL), which is not designed to change during the life of the product. The approach will describe core ingredients (e.g. technologies, architectures, etc.) and when and how ISHM capabilities may be implemented. A specific architecture/taxonomy/ontology will be described, as well as a prototype software environment that supports development of ISHM capability. This paper will address implementation of system-wide ISHM as a core capability, and ISHM for specific subsystems as expansions and evolution, but always focusing on achieving an integrated capability.

Figueroa, Fernando↗

Modeling and Optimization for Morphing Wing Concept Generation

This report consists of two major parts: 1) the approach to develop morphing wing weight equations, and 2) the approach to size morphing aircraft. Combined, these techniques allow the morphing aircraft to be sized with estimates of the morphing wing weight that are more credible than estimates currently available; aircraft sizing results prior to this study incorporated morphing wing weight estimates based on general heuristics for fixed-wing flaps (a comparable "morphing" component) but, in general, these results were unsubstantiated. This report will show that the method of morphing wing weight prediction does, in fact, drive the aircraft sizing code to different results and that accurate morphing wing weight estimates are essential to credible aircraft sizing results.

Skillen, Michael D.↗

Integrated Modeling and Simulation Verification, Validation, and Accreditation Strategy for Exploration Systems Mission Directorate

Models and simulations (M&S) are critical resources in the exploration of space. They support program management, systems engineering, integration, analysis, test, and operations and provide critical information and data supporting key analyses and decisions (technical, cost and schedule). Consequently, there is a clear need to establish a solid understanding of M&S strengths and weaknesses, and the bounds within which they can credibly support decision-making. Their usage requires the implementation of a rigorous approach to verification, validation and accreditation (W&A) and establishment of formal process and practices associated with their application. To ensure decision-making is suitably supported by information (data, models, test beds) from activities (studies, exercises) from M&S applications that are understood and characterized, ESMD is establishing formal, tailored W&A processes and practices. In addition, to ensure the successful application of M&S within ESMD, a formal process for the certification of analysts that use M&S is being implemented. This presentation will highlight NASA's Exploration Systems Mission Directorate (ESMD) management approach for M&S W&A to ensure decision-makers receive timely information on the model's fidelity, credibility, and quality.

Hale, Joseph P.↗

An Overview of Space Exploration Simulation (Basis of Confidence) Documentation

Models and simulations (M&S) are critical resources in the exploration of space. They support program management, systems engineering, integration, analysis, test, and operations by providing critical information that supports key analyses and decisions (technical, cost and schedule). Consequently, there is a clear need to establish a solid understanding of M&S strengths and weaknesses, and the bounds within which they can credibly support decision making. In this presentation we will describe how development of simulation capability documentation will be used to form a Basis of Confidence (Basis of Confidence) for National Aeronautics and Space Administration (NASA) M&S. The process by which BOC documentation is developed will be addressed, as well as the structure and critical concepts that are essential for establishing credibility of NASA's Exploration Systems Mission Directorate (ESMD) legacy M&S. We will illustrate the significance of BOC documentation in supporting decision makers and Accreditation Authorities in M&S risk management.

Bray, Alleen↗

Multi-user investigation organizer

A system that allows a team of geographically dispersed users to collaboratively analyze a mishap event. The system includes a reconfigurable ontology, including instances that are related to and characterize the mishap, a semantic network that receives, indexes and stores, for retrieval, viewing and editing, the instances and links between the instances, a network browser interface for retrieving and viewing screens that present the instances and links to other instances and that allow editing thereof, and a rule-based inference engine, including a collection of rules associated with establishment of links between the instances. A possible conclusion arising from analysis of the mishap event may be characterized as one or more of: not a credible conclusion; an unlikely conclusion; a credible conclusion; conclusion needs analysis; conclusion needs supporting data; conclusion proposed to be closed; and an un-reviewed conclusion.

Keller, Richard M.↗

Application of Satellite Observations to Manage Natural Disasters in the Lake Victoria Basin

Lake Victoria, the second largest fresh water lake in the Eastern part of Africa is a vital natural resource for the economic well being and prosperity of over 30 million people located in riparian regions of Uganda, Kenya and Tanzania. It covers a large area of about 68,870 km2 and produces a GDP of about US $30 billion per year. The region is also very much prone to natural disasters such as severe floods during heavy precipitation periods in the Eastern part of Africa. In addition to floods, the precipitation also produces large infestations of mosquito larvae due to the standing water in many areas. This further causes multiple vector borne diseases such as Malaria, Rift Valley Fever and more. These problems are of serious concern and require active and aggressive surveillance and management to minimize the loss of human and animal lives and property damage. Satellite imagery and observations along with the in situ measurements provide a great tool to analyze and study this area and inform the policy makers to make calculated policy decisions which are more beneficial to the environment. Recently, NASA and USAID have joined forces with the Regional Center for Mapping of Resources for Development (RCMRD) located in Nairobi, Kenya to utilize multiple NASA sensors such as TRMM, SRTM and MODIS to develop flood potential maps for the Lake Victoria Basin. The idea is to generate a flood forecasts and "nowcasts" that can be sent to the disaster management organizations of Uganda, Kenya, and Tanzania. Post flood event satellite imagery is becoming a common tool to assess the areas inundated by flooding. However, this work is unique undertaking by utilizing land imaging and atmospheric satellites to build credible flood potential maps. At same time, we are also studying the potential occurrence and spread of Rift Valley Fever disease based on the short term climate records and precipitation data. These activities require multi-nation coordination and agreements and multiple operational agencies within each respective country. It also requires credible in situ data such as precipitation, river flow rates and lake levels to further validate the global and regional Hood models and algorithms. This also requires a considerable amount of training and capacity building for the RCMRD experts who will help us validate the model results and eventually transition it for operational use. In a final analysis, Disaster management and humanitarian aid organizations need accurate and timely information for making decisions regarding deployment of relief teams and emergency supplies during major floods. Flood maps based on the use of satellite data have proven extremely valuable to such organizations for identifying the location, extent, and severity of these events. However, despite extraordinary efforts on the part of remote sensing data providers to rapidly deliver such maps, there is typically a delay of several days or even weeks from the on-set of flooding until such maps are available to the disaster management community. This paper summarizes efforts at NASA to address this problem through development of an integrated and automated process of a) flood forecasting b) flood detection, c) satellite data acquisition, d) rapid Hood mapping and distribution, and e) validation of Hood forecasting and detection products.

Habib, Shahid↗

Composite Overwrapped Pressure Vessels (COPV): Developing Flight Rationale for the Space Shuttle Program

Introducing composite vessels into the Space Shuttle Program represented a significant technical achievement. Each Orbiter vehicle contains 24 (nominally) Kevlar tanks for storage of pressurized helium (for propulsion) and nitrogen (for life support). The use of composite cylinders saved 752 pounds per Orbiter vehicle compared with all-metal tanks. The weight savings is significant considering each Shuttle flight can deliver 54,000 pounds of payload to the International Space Station. In the wake of the Columbia accident and the ensuing Return to Flight activities, the Space Shuttle Program, in 2005, re-examined COPV hardware certification. Incorporating COPV data that had been generated over the last 30 years and recognizing differences between initial Shuttle Program requirements and current operation, a new failure mode was identified, as composite stress rupture was deemed credible. The Orbiter Project undertook a comprehensive investigation to quantify and mitigate this risk. First, the engineering team considered and later deemed as unfeasible the option to replace existing all flight tanks. Second, operational improvements to flight procedures were instituted to reduce the flight risk and the danger to personnel. Third, an Orbiter reliability model was developed to quantify flight risk. Laser profilometry inspection of several flight COPVs identified deep (up to 20 mil) depressions on the tank interior. A comprehensive analysis was performed and it confirmed that these observed depressions were far less than the criterion which was established as necessary to lead to liner buckling. Existing fleet vessels were exonerated from this failure mechanism. Because full validation of the Orbiter Reliability Model was not possible given limited hardware resources, an Accelerated Stress Rupture Test of a flown flight vessel was performed to provide increased confidence. A Bayesian statistical approach was developed to evaluate possible test results with respect to the model credibility and thus flight rationale for continued operation of the Space Shuttle with existing flight hardware. A non-destructive evaluation (NDE) technique utilizing Raman Spectroscopy was developed to directly measure the overwrap residual stress state. Preliminary results provide optimistic results that patterns of fluctuation in fiber elastic strains over the outside vessel surface could be directly correlated with increased fiber stress ratios and thus reduced reliability.

Kezirian, Michael T.↗

Modeling and Simulation at NASA

This slide presentation is composed of two topics. The first reviews the use of modeling and simulation (M&S) particularly as it relates to the Constellation program and discrete event simulation (DES). DES is defined as a process and system analysis, through time-based and resource constrained probabilistic simulation models, that provide insight into operation system performance. The DES shows that the cycles for a launch from manufacturing and assembly to launch and recovery is about 45 days and that approximately 4 launches per year are practicable. The second topic reviews a NASA Standard for Modeling and Simulation. The Columbia Accident Investigation Board made some recommendations related to models and simulations. Some of the ideas inherent in the new standard are the documentation of M&S activities, an assessment of the credibility, and reporting to decision makers, which should include the analysis of the results, a statement as to the uncertainty in the results,and the credibility of the results. There is also discussion about verification and validation (V&V) of models. There is also discussion about the different types of models and simulation.

Steele, Martin J.↗

The Extravehicular Suit Impact Load Attenuation Study for Use in Astronaut Bone Fracture Prediction

The NASA Integrated Medical Model (IMM) assesses the risk, including likelihood and impact of occurrence, of all credible in-flight medical conditions. Fracture of the proximal femur is a traumatic injury that would likely result in loss of mission if it were to happen during spaceflight. The low gravity exposure causes decreases in bone mineral density which heightens the concern. Researchers at the NASA Glenn Research Center have quantified bone fracture probability during spaceflight with a probabilistic model. It was assumed that a pressurized extravehicular activity (EVA) suit would attenuate load during a fall, but no supporting data was available. The suit impact load attenuation study was performed to collect analogous data. METHODS: A pressurized EVA suit analog test bed was used to study how the offset, defined as the gap between the suit and the astronaut s body, impact load magnitude and suit operating pressure affects the attenuation of impact load. The attenuation data was incorporated into the probabilistic model of bone fracture as a function of these factors, replacing a load attenuation value based on commercial hip protectors. RESULTS: Load attenuation was more dependent on offset than on pressurization or load magnitude, especially at small offsets. Load attenuation factors for offsets between 0.1 - 1.5 cm were 0.69 +/- 0.15, 0.49 +/- 0.22 and 0.35 +/- 0.18 for mean impact forces of 4827, 6400 and 8467 N, respectively. Load attenuation factors for offsets of 2.8 - 5.3 cm were 0.93 +/- 0.2, 0.94 +/- 0.1 and 0.84 +/- 0.5, for the same mean impact forces. Reductions were observed in the 95th percentile confidence interval of the bone fracture probability predictions. CONCLUSIONS: The reduction in uncertainty and improved confidence in bone fracture predictions increased the fidelity and credibility of the fracture risk model and its benefit to mission design and operational decisions.

Lewandowski, Beth E.↗

Model Verification and Validation Concepts for a Probabilistic Fracture Assessment Model to Predict Cracking of Knife Edge Seals in the Space Shuttle Main Engine High Pressure Oxidizer

Physics-based models are routinely used to predict the performance of engineered systems to make decisions such as when to retire system components, how to extend the life of an aging system, or if a new design will be safe or available. Model verification and validation (V&V) is a process to establish credibility in model predictions. Ideally, carefully controlled validation experiments will be designed and performed to validate models or submodels. In reality, time and cost constraints limit experiments and even model development. This paper describes elements of model V&V during the development and application of a probabilistic fracture assessment model to predict cracking in space shuttle main engine high-pressure oxidizer turbopump knife-edge seals. The objective of this effort was to assess the probability of initiating and growing a crack to a specified failure length in specific flight units for different usage and inspection scenarios. The probabilistic fracture assessment model developed in this investigation combined a series of submodels describing the usage, temperature history, flutter tendencies, tooth stresses and numbers of cycles, fatigue cracking, nondestructive inspection, and finally the probability of failure. The analysis accounted for unit-to-unit variations in temperature, flutter limit state, flutter stress magnitude, and fatigue life properties. The investigation focused on the calculation of relative risk rather than absolute risk between the usage scenarios. Verification predictions were first performed for three units with known usage and cracking histories to establish credibility in the model predictions. Then, numerous predictions were performed for an assortment of operating units that had flown recently or that were projected for future flights. Calculations were performed using two NASA-developed software tools: NESSUS(Registered Trademark) for the probabilistic analysis, and NASGRO(Registered Trademark) for the fracture mechanics analysis. The goal of these predictions was to provide additional information to guide decisions on the potential of reusing existing and installed units prior to the new design certification.

Pai, Shantaram S.↗

NASA Handbook for Models and Simulations: An Implementation Guide for NASA-STD-7009

The purpose of this Handbook is to provide technical information, clarification, examples, processes, and techniques to help institute good modeling and simulation practices in the National Aeronautics and Space Administration (NASA). As a companion guide to NASA-STD- 7009, Standard for Models and Simulations, this Handbook provides a broader scope of information than may be included in a Standard and promotes good practices in the production, use, and consumption of NASA modeling and simulation products. NASA-STD-7009 specifies what a modeling and simulation activity shall or should do (in the requirements) but does not prescribe how the requirements are to be met, which varies with the specific engineering discipline, or who is responsible for complying with the requirements, which depends on the size and type of project. A guidance document, which is not constrained by the requirements of a Standard, is better suited to address these additional aspects and provide necessary clarification. This Handbook stems from the Space Shuttle Columbia Accident Investigation (2003), which called for Agency-wide improvements in the "development, documentation, and operation of models and simulations"' that subsequently elicited additional guidance from the NASA Office of the Chief Engineer to include "a standard method to assess the credibility of the models and simulations."2 General methods applicable across the broad spectrum of model and simulation (M&S) disciplines were sought to help guide the modeling and simulation processes within NASA and to provide for consistent reporting ofM&S activities and analysis results. From this, the standardized process for the M&S activity was developed. The major contents of this Handbook are the implementation details of the general M&S requirements ofNASA-STD-7009, including explanations, examples, and suggestions for improving the credibility assessment of an M&S-based analysis.

Steele, Martin J.↗

Building a Database for a Quantitative Model

A database can greatly benefit a quantitative analysis. The defining characteristic of a quantitative risk, or reliability, model is the use of failure estimate data. Models can easily contain a thousand Basic Events, relying on hundreds of individual data sources. Obviously, entering so much data by hand will eventually lead to errors. Not so obviously entering data this way does not aid linking the Basic Events to the data sources. The best way to organize large amounts of data on a computer is with a database. But a model does not require a large, enterprise-level database with dedicated developers and administrators. A database built in Excel can be quite sufficient. A simple spreadsheet database can link every Basic Event to the individual data source selected for them. This database can also contain the manipulations appropriate for how the data is used in the model. These manipulations include stressing factors based on use and maintenance cycles, dormancy, unique failure modes, the modeling of multiple items as a single "Super component" Basic Event, and Bayesian Updating based on flight and testing experience. A simple, unique metadata field in both the model and database provides a link from any Basic Event in the model to its data source and all relevant calculations. The credibility for the entire model often rests on the credibility and traceability of the data.

Kahn, C. Joseph↗

Verification Testing: Meet User Needs Figure of Merit

Verification is the process through which Modeling and Simulation(M&S) software goes to ensure that it has been rigorously tested and debugged for its intended use. Validation confirms that said software accurately models and represents the real world system. Credibility gives an assessment of the development and testing effort that the software has gone through as well as how accurate and reliable test results are. Together, these three components form Verification, Validation, and Credibility(VV&C), the process by which all NASA modeling software is to be tested to ensure that it is ready for implementation. NASA created this process following the CAIB (Columbia Accident Investigation Board) report seeking to understand the reasons the Columbia space shuttle failed during reentry. The reports conclusion was that the accident was fully avoidable, however, among other issues, the necessary data to make an informed decision was not there and the result was complete loss of the shuttle and crew. In an effort to mitigate this problem, NASA put out their Standard for Models and Simulations, currently in version NASA-STD-7009A, in which they detailed their recommendations, requirements and rationale for the different components of VV&C. They did this with the intention that it would allow for people receiving MS software to clearly understand and have data from the past development effort. This in turn would allow the people who had not worked with the MS software before to move forward with greater confidence and efficiency in their work. This particular project looks to perform Verification on several MATLAB (Registered Trademark)(The MathWorks, Inc.) scripts that will be later implemented in a website interface. It seeks to take note and define the limits of operation, the units and significance, and the expected datatype and format of the inputs and outputs of each of the scripts. This is intended to prevent the code from attempting to make incorrect or impossible calculations. Additionally, this project will look at the coding generally and note inconsistencies, redundancies, and other aspects that may become problematic or slow down the codes run time. Certain scripts lacking in documentation also will be commented and cataloged.

validation↗

Parametric Evaluation of Interstellar Exploration Mission Concepts

One persistent difficulty in evaluating the myriad advanced propulsion concepts proposed over the last 60 years is a true apples to apples comparison of the expected gain in performance. This analysis is complicated by numerous factors including, multiple missions of interest to the advanced propulsion community, the lack of a credible closed form solution to 'medium thrust' trajectories, and lack of detailed design data for most proposed concepts that lend credibility to engine performance estimates. This paper describes a process on how to make fair comparisons of different propulsion concepts for multiple missions over a wide range of performance values. The figure below illustrates this process. This paper describes in detail the process and outlines the status so far in compiling the required data. Parametric data for several missions are calculated and plotted against specific power-specific impulse scatter plots of expected propulsion system performance. The overlay between required performance as defined by the trajectory parametrics and expected performance as defined in the literature for major categories of propulsion systems clearly defines which propulsion systems are the most apt for a given mission. The application of the Buckingham Pi theorem to general parameters for interstellar exploration ( mission time, mass, specific impulse, specific power, distance, propulsion source energy/mass, etc.) yields a number of dimensionless variables. The relationships of these variables can then be explored before application to a particular mission. Like in the fields of fluid mechanics and heat transfer, the use of the Buckingham Pi theorem results in new variables to make apples to apples comparisons.

Adams, Robert B.↗

Gateway Modeling and Simulation Plan

This plan institutes direction across the Gateway Program and the Element Projects to ensure that Cross Program M&S are produced in a manner that (1) generate the artifacts required for NASA-STD-7009 compliance, (2) ensures interoperability of M&S exchanged and integrated across the program and, (3) drives integrated development efforts to provide cross-domain integrated simulation of the Gateway elements, space environment, and operational scenarios. This direction is flowed down via contractual enforcement to prime contractors and includes both the GMS requirements specified in this plan and the NASASTD- 7009 derived requirements necessary for compliance. Grounding principles for management of Gateway Models and Simulations (M&S) are derived from the Columbia Accident Investigation Board (CAIB) report and the Diaz team report, “A Renewed Commitment to Excellence.” As an outcome of these reports, and in response to Action 4 of the Diaz team report, the NASA Standard for Models and Simulations, NASA-STD-7009 was developed. The standard establishes M&S requirements for development and use activities to ensure proper capture and communication of M&S pedigree and credibility information to Gateway program decision makers. Through the course of the Gateway program life cycle M&S will be heavily relied upon to conduct analysis, test products, support operations activities, enable informed decision making and ultimately to certify the Gateway with an acceptable level of risk to crew and mission. To reduce risk associated with M&S influenced decisions, this plan applies the NASA-STD-7009 requirements to produce the artifacts that support credibility assessments and ensure the information is communicated to program management.

NASA-STD-7009↗

Relativistic Shapiro Delay Measurements of an Extremely Massive Millisecond Pulsar

Despite its importance to our understanding of physics at supranuclear densities, the equation of state (EoS) of matter deep within neutron stars remains poorly understood. Millisecond pulsars (MSPs) are among the most useful astrophysical objects in the Universe for testing fundamental physics, and place some of the most stringent constraints on this high-density EoS. Pulsar timing—the process of accounting for every rotation of a pulsar over long time periods—can precisely measure a wide variety of physical phenomena, including those that allow the measurement of the masses of the components of a pulsar binary system1. One of these, called relativistic Shapiro delay2, can yield precise masses for both an MSP and its companion; however, it is only easily observed in a small subset of high-precision, highly inclined (nearly edge-on) binary pulsar systems. By combining data from the North American Nanohertz Observatory for Gravitational Waves (NANOGrav) 12.5-yr data set with recent orbitalphase- specific observations using the Green Bank Telescope, we have measured the mass of the MSP J0740+6620 to be 2.14+0:10-0:09 M⊙ (68.3% credibility interval; the 95.4% credibility interval is 2.14+0:20-0:18 M⊙). It is highly likely to be the most massive neutron star yet observed, and serves as a strong constraint on the neutron star interior EoS.

H T Cromartie↗

Observation of Gravitational Waves from Two Neutron Star-Black Hole Coalescences

We report the observation of gravitational waves from two compact binary coalescences in LIGO's and Virgo's third observing run with properties consistent with neutron star-black hole (NSBH) binaries. The two events are named GW200105_162426 and GW200115_042309, abbreviated as GW200105 and GW200115; the first was observed by LIGO Livingston and Virgo, and the second by all three LIGO-Virgo detectors. The source of GW200105 has component masses 8.9(exp +1.2/-1.5) M⨀ and 1.9(exp +0.3/-0.2) M⨀, whereas the source of GW200115 has component masses 5.7(exp +1.8/-2.1) M⨀ and 1.5(exp +0.7/-0.3) M⨀ (all measurements quoted at the 90% credible level). The probability that the secondary's mass is below the maximal mass of a neutron star is 89%-96% and 87%-98%, respectively, for GW200105 and GW200115, with the ranges arising from different astrophysical assumptions. The source luminosity distances are 280(exp +110/-110) Mpc and 300(+150/-100) Mpc, respectively. The magnitude of the primary spin of GW200105 is less than 0.23 at the 90% credible level, and its orientation is unconstrained. For GW200115, the primary spin has a negative spin projection onto the orbital angular momentum at 88% probability. We are unable to constrain the spin or tidal deformation of the secondary component for either event. We infer an NSBH merger rate density of 45(exp +75/-33) Gpc(exp -3) yr(exp -1) when assuming that GW200105 and GW200115 are representative of the NSBH population, or 130(+112/-69) Gpc(exp -3) yr(exp -1) under the assumption of a broader distribution of component masses.

R Abbott↗

Refined Mass and Geometric Measurements of the High-mass PSR J0740+6620

We report results from continued timing observations of PSR J0740+6620, a high-mass, 2.8 ms radio pulsar in orbit with a likely ultracool white dwarf companion. Our data set consists of combined pulse arrival-time measurements made with the 100 m Green Bank Telescope and the Canadian Hydrogen Intensity Mapping Experiment telescope. We explore the significance of timing-based phenomena arising from general relativistic dynamics and variations in pulse dispersion. When using various statistical methods, we find that combining∼1.5 yr of additional, high-cadence timing data with previous measurements confirms and improves on previous estimates of relativistic effects within the PSR J0740+6620 system, with the pulsar mass=-+mM2.08p0.070.07 M (68.3% credibility) determined by the relativistic Shapiro time delay. For the first time, we measure secular variation in the orbital period and argue that this effect arises from apparent acceleration due to significant transverse motion. After incorporating contributions from Galactic differential rotation and off-plane acceleration in the Galactic potential, we obtain a model-dependent distance of=-+d1.140.150.17kpc (68.3% credibility). This improved distance confirms the ultracool nature of the white dwarf companion determined from recent optical observations. We discuss the prospects for future observations with next-generation facilities, which will likely improve the precision on mp for J0740+6620 by an order of magnitude within the next few years

Neutron stars↗