Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEACTIVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Ultrafast excited-state deactivation of 9-methylhypoxanthine in aqueous solution: A QM/MM MD study

Photoinduced ultrafast non-adiabatic decay of 9-methylhypoxanthine (9MHPX) in aqueous solution was investigated by ab initio surface-hopping dynamics calculations using a combined quantum mechanical/molecular mechanical approach. The absorption spectra of 9MHPX in aqueous solution were also explored by the hybrid cluster-continuum model at the level of time-dependent density functional theory along with the polarizable continuum model (PCM). The static electronic-structure calculations indicate that the absorption spectra of 9MHPX simulated by TD-B3LYP/PCM and TD-X3LYP/PCM can reproduce very well the experimental findings, with the accuracy of about 0.20 eV. According to dynamics simulations, irradiation of 9MHPX populates the bright excited singlet S{sub 1} state, which may undergo an ultrafast non-radiative deactivation to the S{sub 0} state. The lifetime of the S{sub 1} state of 9MHPX in aqueous solution is predicted to be 115.6 fs, slightly longer than that in the gas phase (88.8 fs), suggesting that the solvent water has no significant influence on the excited-state lifetime of 9MHPX. Such a behavior in 9MHPX is distinctly different from its parent hypoxanthine keto-N9H tautomer in which the excited-state lifetime of the latter in water solution was remarkably enhanced as compared to the gas phase. The significant difference of the photodynamical behaviors between 9MHPX and keto-N9H can be ascribed to their different hydrogen bond environment in aqueous solution.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Deactivation rate of I{sub 2} molecules (X, v {>=} 30) in the medium of a chemical oxygen-iodine laser

The effective deactivation rate constants are calculated for I{sub 2}(X) molecules at vibrational levels with v {>=} 30 colliding with N{sub 2} and O{sub 2} molecules in the medium of a chemical oxygen-iodine laser. The calculated constants (4x10{sup -12} cm{sup 3} s{sup -1} and 3x10{sup -12} cm{sup 3} s{sup -1}) are less by half plus than the corresponding constants found earlier in the paper of Lawrence et al., where the dissociation of I{sub 2} was neglected in calculations. (lasers, active media)

74 ATOMIC AND MOLECULAR PHYSICS↗

Deactivation of krypton atoms in the metastable 5s({sup 3}P{sub 2}) state in collisions with krypton and argon atoms

The collision deactivation of the metastable 5s[3/2]{sub 2}{sup o}({sup 3}P{sub 2}) state of krypton atoms is studied by the absorption probe method in electron-beam-excited high-pressure Ar-Kr mixtures with a low krypton content. The rate constants of plasma-chemical reactions Kr* + Kr + Ar {yields} Kr{sub 2}* + Ar [(4.1{+-}0.4)x10{sup -33} cm{sup 6} s{sup -1}] and Kr* + 2Ar {yields} ArKr* + Ar (less than 10{sup -35} cm{sup 6} s{sup -1}) are measured for the first time and the rate constant of the reaction Kr* + Ar {yields} products + Ar [(3.8{+-}0.4)x10{sup -15} cm{sup 3} s{sup -1}] is refined. (active media)

74 ATOMIC AND MOLECULAR PHYSICS↗

Structural and Functional Analysis of Two New Positive Allosteric Modulators of GluA2 Desensitization and Deactivation

At the dimer interface of the extracellular ligand-binding domain of {alpha}-amino-3-hydroxy-5-methylisoxazole-4-propionic acid (AMPA) receptors a hydrophilic pocket is formed that is known to interact with two classes of positive allosteric modulators, represented by cyclothiazide and the ampakine 2H,3H,6aH-pyrrolidino(2,1-3',2')1,3-oxazino(6',5'-5,4)benzo(e)1,4-dioxan-10-one (CX614). Here, we present structural and functional data on two new positive allosteric modulators of AMPA receptors, phenyl-1,4-bis-alkylsulfonamide (CMPDA) and phenyl-1,4-bis-carboxythiophene (CMPDB). Crystallographic data show that these compounds bind within the modulator-binding pocket and that substituents of each compound overlap with distinct moieties of cyclothiazide and CX614. The goals of the present study were to determine (1) the degree of modulation by CMPDA and CMPDB of AMPA receptor deactivation and desensitization; (2) whether these compounds are splice isoform-selective; and (3) whether predictions of mechanism of action could be inferred by comparing molecular interactions between the ligand-binding domain and each compound with those of cyclothiazide and CX614. CMPDB was found to be more isoform-selective than would be predicted from initial binding assays. It is noteworthy that these new compounds are both more potent and more effective and may be more clinically relevant than the AMPA receptor modulators described previously.

59 BASIC BIOLOGICAL SCIENCES↗

Acute Cocaine Induces Fast Activation of D1 Receptor and Progressive Deactivation of D2 Receptor Strial Neurons: In Vivo Optical Microprobe [Ca(superscript)2+]subscript)i Imaging

Cocaine induces fast dopamine increases in brain striatal regions, which are recognized to underlie its rewarding effects. Both dopamine D1 and D2 receptors are involved in cocaine's reward but the dynamic downstream consequences of cocaine effects in striatum are not fully understood. Here we used transgenic mice expressing EGFP under the control of either the D1 receptor (D1R) or the D2 receptor (D2R) gene and microprobe optical imaging to assess the dynamic changes in intracellular calcium ([Ca{sup 2+}]{sub i} ) responses (used as marker of neuronal activation) to acute cocaine in vivo separately for D1R- versus D2R-expressing neurons in striatum. Acute cocaine (8 mg/kg, i.p.) rapidly increased [Ca{sup 2+}]{sub i} in D1R-expressing neurons (10.6 {+-} 3.2%) in striatum within 8.3 {+-} 2.3 min after cocaine administration after which the increases plateaued; these fast [Ca{sup 2+}]{sub i} increases were blocked by pretreatment with a D1R antagonist (SCH23390). In contrast, cocaine induced progressive decreases in [Ca{sup 2+}]{sub i} in D2R-expressing neurons (10.4 {+-} 5.8%) continuously throughout the 30 min that followed cocaine administration; these slower [Ca{sup 2+}]{sub i} decreases were blocked by pretreatment with a D2R antagonist (raclopride). Since activation of striatal D1R-expressing neurons (direct-pathway) enhances cocaine reward, whereas activation of D2R expressing neurons suppresses it (indirect-pathway) (Lobo et al., 2010), this suggests that cocaine's rewarding effects entail both its fast stimulation ofD1R (resulting in abrupt activation of direct-pathway neurons) and a slower stimulation of D2R (resulting in longer-lasting deactivation of indirect-pathway neurons). We also provide direct in vivo evidence of D2R and D1R interactions in the striatal responses to acute cocaine administration.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Evidence for and mitigation of the encapsulation of gold nanoparticles within silica supports upon high-temperature treatment of Au/SiO(2) catalysts: Implication to catalyst deactivation

Silica is one of the most widely used catalyst supports for metal nanocatalysts. Although the sintering of metal nanoparticles on various silicasupports has been extensively studied, the restructuring of silicasupports and its effect on supported metal nanoparticles have been seldom investigated. In this paper, silica-supported gold catalysts were used as a model system to probe the interplay of silicasupports and metal nanoparticles under high-temperature treatment conditions. Gold was loaded onto mesoporous SiO{sub 2} (SBA-15) using Au(en){sub 2}Cl{sub 3} as the precursor in the presence of aqueous NaOH (pH {approx} 10). The influence of high-temperature treatment on the textural and structural changes of SBA-15 and Au/SBA-15 was studied by X-ray diffraction (XRD), N{sub 2} adsorption-desorption, and transmission electron microscopy (TEM). Control experiments were conducted using an amorphous SiO{sub 2} (Cab-O-Sil) as the support. It was found that SBA-15 undergoes significant phase transformation to crystalline cristobalite upon high-temperaturetreatment, resulting in the dramatic decrease in surface area. More interestingly, the crystallization of SiO{sub 2} leads to the encapsulation of goldnanoparticles inside the SiO{sub 2} matrix. This conclusion was proven by aqua regia leaching, EDX, and SEM/TEM experiments. Goldnanoparticles can also be encapsulated into the SiO{sub 2} matrix when using Cab-O-Sil as the support, but the process takes place under much higher temperatures. The encapsulation of gold nanoparticles can be mitigated by coating Au/SBA-15 with amorphous Al{sub 2}O{sub 3} or by coating SBA-15 with Al{sub 2}O{sub 3} before loading gold. Our findings shed new light on the deactivation of supported gold catalysts under high-temperature conditions.

36 MATERIALS SCIENCE↗

Facility Deactivation and Decommissioning at the Savannah River Site

In February 2002, the U.S. Department of Energy initiated actions to expedite Cleanup, focus on significant and early risk reduction, and reduce costs at the Savannah River Site (SRS). In response SRS started on a project focused on completing the decommissioning of inactive facilities in T, D, and M Areas, areas that are on the perimeter of the Site, by the end of 2006. In June 2003, the Department of Energy Savannah River Operations Office (DOE-SR), the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency, Region 4 (EPA-4) endorsed a Memorandum of Agreement (MOA) concerning cleanup at the Savannah River Site (SRS). The vision of the Agreement is that SRS will reduce its operations footprint to establish a buffer zone at the perimeter of the Site, while the central core area of the Site will be reserved for continuing or future long-term operations. DOE-SR, EPA-4, and SCDHEC agreed that establishing this buffer zone and appropriately sequencing environmental restoration and decommissioning activities can lead to greater efficiency and accelerate completion of entire site areas. This vision is embodied in the concept of Area Completion - which integrated operations, deactivation and decommissioning (D and D), and soils and groundwater cleanup into a time-phased approach to completing all the work necessary to address the Cold War legacy. D and D addresses the 'footprint' of the building or structure, while the soils and groundwater project addresses any environmental remediation that may be required in the underlying and surrounding soils and groundwater. Since then, {approx}250 facilities have been decommissioned at the SRS, ranging from guard stations to nuclear fuel production facilities. The efforts made up front to develop the MOA and maintain open and active involvement with the EPA and SCDHEC was instrumental to the success of the SRS D and D Project. Accelerated D and D requires innovative regulatory approaches so that time and resources are spent commensurate with the hazards of the facilities being decommissioned. The graded approach developed at SRS accomplished a balance between building hazards and the amount of regulatory and public involvement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deactivation and Decommissioning Planning and Analysis with Geographic Information Systems

From the mid-1950's through the 1980's, the U.S. Department of Energy's Savannah River Site produced nuclear materials for the weapons stockpile, for medical and industrial applications, and for space exploration. Although SRS has a continuing defense-related mission, the overall site mission is now oriented toward environmental restoration and management of legacy chemical and nuclear waste. With the change in mission, SRS no longer has a need for much of the infrastructure developed to support the weapons program. This excess infrastructure, which includes over 1000 facilities, will be decommissioned and demolished over the forthcoming years. Dis-positioning facilities for decommissioning and deactivation requires significant resources to determine hazards, structure type, and a rough-order-of-magnitude estimate for the decommissioning and demolition cost. Geographic information systems (GIS) technology was used to help manage the process of dis-positioning infrastructure and for reporting the future status of impacted facilities. Several thousand facilities of various ages and conditions are present at SRS. Many of these facilities, built to support previous defense-related missions, now represent a potential hazard and cost for maintenance and surveillance. To reduce costs and the hazards associated with this excess infrastructure, SRS has developed an ambitious plan to decommission and demolish unneeded facilities in a systematic fashion. GIS technology was used to assist development of this plan by: providing locational information for remote facilities, identifying the location of known waste units adjacent to buildings slated for demolition, and for providing a powerful visual representation of the impact of the overall plan. Several steps were required for the development of the infrastructure GIS model. The first step involved creating an accurate and current GIS representation of the infrastructure data. This data is maintained in a Computer Aided Design (CAD) system and had to be imported into a GIS framework. Since the data is maintained in a different format in CAD, import into GIS involved several spatial processing steps to convert various geometric shapes present in the CAD data to self-closing polygons. The polygons represent facility footprints in plan or map view. Once these were successfully imported and converted, building identifier attributes from the CAD had to be associated with the appropriate polygons in GIS. Attributes are stored as graphical information in a CAD system and are not 'attached' to a building in a relational sense. In GIS, attributes such as building names, building area, hazards, or other descriptive information, must be associated or related to the spatial polygon representing a particular building. This spatial relationship between building polygons and the descriptive attribute information is very similar to relating tables of information in a relational database in which each table record has a unique identifier that can be used to join or relate that table to other tables of information present in the database. The CAD building identifiers were imported into the GIS and several spatial processing steps were used to associate building polygons with the correct identifiers. These spatial steps involved determining the intersection of and nearest identifiers with each building polygon in the GIS. Automating this process in GIS saved a significant amount of time. Once a current and geographically correct representation of the infrastructure data had been created in GIS, field-engineering teams collected information for each facility. This information included the building area, radiological hazards and the associated area, industrial hazards such as asbestos or mercury, structure type (e.g. hardened, industrial, nuclear), annual surveillance and monitoring cost, and other engineering data. The facility engineering data was used in a simple model to determine the rough-order-of-magnitude cost for decontaminating and demolishing each facility. Finally, the engineering and cost data was linked to the GIS model so that this data could be rapidly displayed and analyzed in its geographic context. Once the GIS representing SRS infrastructure and associated descriptive attribute information was developed, detailed maps depicting the future status of all site facilities were created. These maps display the relationship between known waste units and buildings that will be decommissioned and demolished. Cost and hazard information was also depicted illustrating areas and facilities that could present a particular demolition challenge. Although the GIS was quite helpful as an engineering and planning tool, its real power was evident in communicating the impact of the facilities disposition plan to senior management and other stakeholders.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Identification, Dissemination and Implementation of Deactivation and Decommissioning Lessons Learned and Best Practices

Approximately $150 billion of work currently remains in the United States Department of Energy's (DoE's) Office of Environmental Management (EM) life cycle budget for U.S. projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and to develop a knowledge-management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. This paper discusses DoE's rationale for using lessons learned and best practices to improve safety and performance while reducing life cycle costs for Deactivation and Decommissioning (D and D) projects. It also provides an update on the Energy Facility Contractors Group's (EFCOG's) progress in supporting DoE's efforts. At this juncture the best practice efforts described are in developmental stages; however, the commitment to and the concrete nature of the work thus far is noteworthy in regard to improving the way D and D lessons learned and best practices are identified, disseminated and implemented across the DOE Complex.

99 GENERAL AND MISCELLANEOUS↗

A Proposed Framework For Planning Deactivation And Decommissioning Engineering And Design Activities To Meet The Requirements Of DOE Order 413.3A, Program And Project Management For The Acquisition Of Capital Assets

This paper applies the DOE O 413.3A Design/Engineering requirements to Deactivation and Decommissioning (D and D) projects. A list of 41 activities for which Design/Engineering is generally required and which are relevant and common to many D and D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided. This paper also discusses tailoring the application of the Order to a facility based on the complexity of the facility's engineered systems and the hazards existing in the facility. DOE D and D projects are expected to meet the requirements of DOE O 413.3A. For D and D engineering and design activities only, this paper provides guidance for applying these requirements to the Order. A list of 41 typical D and D engineering and design activities has been provided. The Order divides projects into conceptual, preliminary and final design phases. Development of each of the 41 activities can also be organized in conceptual, preliminary and final levels. In general, at the conceptual level project engineers should be determining the what (i.e., the scope) for each activity. At the preliminary level they should be resolving how the activity will be accomplished. At the final level, all the engineering and design details for the activity should be completed so that the activity is ready to implement in the field. It may not be appropriate that development of each individual activity correspond to the current phase of the project. For example, at CD-2 (end of the preliminary design phase) not all activities need be developed to the same level of detail. Only those that are truly significant to the project baseline must be developed to the level of detail necessary to create a reliable project baseline. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Remote Technology for Facility Deactivation and Decommissioning at the Oak Ridge National Laboratory

The facilities at the Oak Ridge National Laboratory (ORNL) that will undergo deactivation and decommissioning (D and D) over the next several years include highly contaminated hot cell facilities, reactor facilities, process facilities, and a variety of other buildings. The D and D effort will require physical, chemical, and radiological characterization as well as decontamination, material sorting, size reduction, dismantlement, and waste removal and packaging. D and D planning for ORNL facilities includes recognizing that a significant number of the facilities contain hazards that prevent the use of safe manual D and D techniques. These hazards include seriously deteriorated structural integrity as well as very high dose rates (some in the hundreds of R/hr). The hazards also include high levels of fixed and removable radioactive contamination on facility surfaces and in equipment as well as chemically hazardous materials. Thus, manned entry may be highly restricted. In these situations, remotely operated technologies will be required to complete the necessary D and D activities, minimize dose and protect workers. To prepare to use remote technologies, it is first necessary to understand the tasks typically required to complete D and D of these facilities as well as the availability, applicability, and sustainability of previously deployed remote technologies. Technologies of specific interest included remote inspection, characterization, decontamination, and dismantlement. The Applied Research Center (ARC) at Florida International University (FIU), in partnership with NuVision Engineering (NVE, formerly AEA Technology), assessed the requirements for remotely operated technologies to support D and D at ORNL. FIU-ARC and NVE then identified existing technologies that can meet the expected requirements and performed a gap analysis between the D and D needs and currently available technologies. (authors)

42 ENGINEERING↗

Advancement of Commercial Intumescent Expanding Foams for Deactivation and Decommissioning in the Nuclear Sector - 20198

Florida International University (FIU), in collaboration with The Department of Energy's Office of Environmental Management (DOE-EM), Savannah River National Laboratory (SRNL), and sites across the Savannah River complex, have identified an operational requirement for a fixative technology that is intended to immobilize and/or isolate residual contamination within a 3-dimensional space. Fixation of radiological contamination can reduce worker risk and mitigate potentially hazardous conditions, however nearly every marketed contamination fixative has been found to be flammable; a significant concern in radiological facilities. Coupled with this, industry fixatives are normally used as a thin coating which can present problems when attempting to stabilize irregular geometry or areas that are difficult to access whilst ensuring full coverage. The technical evaluation and advancement of commercial-off-the-shelf (COTS) polyurethane foams has yielded a down-selected candidate that shows potential in meeting the requirements to support deactivation and decommissioning activities. Several performance criteria have been established and tested to progress the technology readiness level towards an active field demonstration (TRL-7). Such criteria include: mechanical failure limits, adhesive and cohesive properties, thermal/fire resilience, determining thermal behavior, ability to immobilize contamination, and a means of non-destructive evaluation of applications. The test scenario examined was targeted towards an application for decommissioning nuclear pipework, in which the down-selected polyurethane foam would act as a barrier to segregate pipework and mitigate the potential for release during cutting, packaging, and storage operations. Testing carried out at SRNL included: mechanical evaluation of tensile, compressive, and adhesion strength by dynamic mechanical analysis (DMA), as well as thermogravimetric analysis (TGA). FIU examined the foam's fixative properties by utilizing phosphorescent europium-dysprosium doped strontium aluminate powder to investigating the extent to which contamination can be immobilized. FIU has also exploited previous successes in the field of intumescent technologies to assess the down-selected foam's tolerance to an extreme fire scenario, while maintaining the ability to effectively mitigate a contamination release. Parallel to this, extensive thermal investigations were carried out to determine the upper boundary of anticipated heat generation during the curing process as heat generation has the potential to compromise rubber parts of contaminated enclosures. These investigations subsequently yielded a promising method for a non-destructive application evaluation by means of infrared thermography. Utilizing the high sensitivity of modern IR cameras, coupled with the heat generated during the curing process of the polyurethane foam, FIU has been exploring the concept of monitoring the external pipe surface for indications of an irregular or abnormal application, thus informing operational decision making. The testing carried out utilized several current 'best fit' ASTM standards, which serve as helpful guidelines for testing, however, a precise definition of the operational parameters and requirements is still necessary. With continued collaboration with SRNL, FIU aims refine said definitions and develop new standards by which this, and other decommissioning technologies, can be accredited by relevant standards based testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A PROPOSED FRAMEWORK FOR PLANNING DEACTIVATION AND DECOMMISSIONING ENGINEERING AND DESIGN ACTIVITIES TO MEET THE REQUIREMENTS OF DOE ORDER 413.3A, PROGRAM AND PROJECT MANAGEMENT FOR THE ACQUISITION OF CAPITAL ASSETS

This paper provides guidance in applying the requirements of DOE O 413.3A to Deactivation and Decommissioning (D&D) projects. A list of 41 engineering and design activities relevant to D&D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DRAINING HAZARDOUS FLUIDS DURING BUILDING 221-1F DEACTIVATION AT THE SAVANNAH RIVER SITE

Several years ago, SRS completed a four year mission to decommission {approx}250 excess facilities. As part of that effort, SRS deactivated multiple facilities (e.g. Building 247-F, Naval Fuels Facility, and Building 211-F, Outside Facilities for F-Canyon) that contained extensive piping systems filled with hazardous material (e.g. nitric acid). Draining of hazardous materials from piping was successfully completed in all facilities without incident. In early 2009, the decommissioning program at SRS was restarted as a result of funding made available by the American Recovery & Reinvestment Act (ARRA). Under ARRA, draining of piping containing hazardous material was initiated in multiple facilities including Building 221-1F (or A-Line). This paper describes and reviews the draining of piping containing hazardous materials at A-Line, with emphasis on an incident involving the draining of nitric acid. The paper is intended to be a resource for engineers, planners, and project managers, who face similar draining challenges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ASSESSMENT OF THE POTENTIAL FOR HYDROGEN GENERATION DURING DEACTIVATION AND DECOMMISSIONING OF REACTOR VESSELS AT THE SAVANNAH RIVER SITE

The R- and P-reactor vessels at the Savannah River Site (SRS) are being prepared for deactivation and decommissioning (D&D). D&D activities will consist primarily of physically isolating and stabilizing the reactor vessel by filling it with a grout material. The reactor vessels contain aluminum alloy materials, which pose a concern in that aluminum corrodes rapidly when it comes in contact with the alkaline grout. A product of the corrosion reaction is hydrogen gas and therefore potential flammability issues were assessed. A model was developed to calculate the hydrogen generation rate as the reactor is being filled with the grout material. Three options existed for the type of grout material for D&D of the reactor vessels. The grout formulation options included ceramicrete (pH 6-8), a calcium aluminate sulfate (CAS) based cement (pH 10), or Portland cement grout (pH 12.4). Corrosion data for aluminum in concrete were utilized as input for the model. The calculations considered such factors as the surface area of the aluminum components, the open cross-sectional area of the reactor vessel, the rate at which the grout is added to the reactor vessel, and temperature. Given the hydrogen generation rate, the hydrogen concentration in the vapor space of the reactor vessel above the grout was calculated. This concentration was compared to the lower flammability limit for hydrogen. The assessment concluded that either ceramicrete or the CAS grout may be used to safely grout the P-reactor vessel. The risk of accumulation of a flammable mixture of hydrogen between the grout-air interface and the top of the reactor is very low. Portland cement grout, on the other hand, for the same range of process parameters did not provide a margin of safety against the accumulation of flammable gas in the reactor vessel during grouting operations in the P-reactor vessel. Therefore, it was recommended that this grout not be utilized for this task. On the other hand, the R-reactor vessel contained significantly less aluminum surface area that the P-reactor vessel based on current facility process knowledge, surface observations, and drawings. Therefore, a Portland cement grout may be considered for grouting operations as well as the other grout formulations.

08 HYDROGEN↗

A Carbene-Rich but Carbonyl-Poor [Ir 6 (IMe) 8 (CO) 2 H 14 ] 2+ Polyhydride Cluster as a Deactivation Product from Catalytic Glycerol Dehydrogenation

The title cluster, a deactivation product in the catalytic dehydrogenation of glycerol, was characterized by XRD, DFT calculations, HRMS, FTIR spectroscopy, and NMR spectroscopy. Experimental/computational studies located the 14 H ligands, and all 1H and 13C{1H} NMR resonances were assigned. The structure contains an unprecedented Ir6H14 core with two CO and eight IMe ligands.

catalysis (homogeneous), catalysis (heterogeneous)↗

Where does the sulphur go? Deactivation of a low temperature CO oxidation catalyst by sulphur poisoning

Sulphate formation, occurring preferentially at the CuO/CeOx-ZrOx interface, is responsible for the deactivation of low temperature CO oxidation catalysts. XRD, FTIR and isotope exchange experiments, as well as DFT calculations, reveal the poisoning mechanism of sulphate formation on the CeOx/ZrOx support material. JS, DM, TV and CHFP gratefully acknowledge the U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy, Vehicle Technologies Program for the support of their participation in this work. Their studies were performed in the Environmental Molecular Sciences Laboratory (EMSL), a national scientific user facility sponsored by the DOE’s Office of Biological and Environmental Research, and located at Pacific Northwest National Laboratory (PNNL). PNNL is operated for the U.S. DOE by Battelle under contract number DE-AC05-76RL01830.

Szanyi, Janos↗

Radiative Deactivation of Lowest Singlet and Triplet Excited States of Water-Soluble Porphyrins

Radiative deactivation of lowest excited triplet and singlet states for series of free bases and Zn{sup 2+}-complexes of water-soluble 5,10,15,20-tetrakis-(4-sulfonatophenyl)porphyrin (H{sub 2}T4SPP); 5,10,15,20-tetrakis-(4-N-alkylpyridyl) porphyrin (H{sub 2}T4AlkPyP); and 5,10,15,20-tetrakis-(3-N-alkylpyridyl)porphyrin (H{sub 2}T3AlkPyP) was studied in solutions at 77 and 293 K. The fluorescence and phosphorescence quantum yields were found to have small but detectable differences for derivatives of the same porphyrin ligand with different counterions for the ionized aryl substituents. It was shown that these differences were due to spin–orbit coupling effects and variation of the electron donor/acceptor properties of the peripheral substituents that changed the electronic energy levels in the porphyrin–counterion system.

74 ATOMIC AND MOLECULAR PHYSICS↗