Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOMESTIC SUPPLIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A Regional Approach to Offshore Wind Energy Manufacturing in the Central Atlantic: Workforce

Meeting the additional job requirements spurred by potential growth in the offshore wind industry is likely to involve intentional and effective recruitment practices and training program development across all occupations (e.g., skilled trades, engineers, professionals) at state, regional, and local levels. The workforce development ecosystem is complex, especially for an industry like offshore wind, so assessing the readiness of an area to support the workforce needs of new manufacturing facilities involves evaluating numerous economic and training factors at an occupational level. Funded by the National Offshore Wind Research and Development Consortium and led by the National Renewable Energy Laboratory, this report represents one part of a two-part study that explores the challenges and opportunities for Delaware, Maryland, Virginia, and North Carolina in fostering regional collaboration to build a domestic supply chain for the U.S. offshore wind energy sector.

17 WIND ENERGY↗

An Intermediate-Scale Version of the Volturnus + Floating Offshore Wind Turbine Platform Concept in a Real Ocean Environment with an Operating Turbine off the Coast of Maine (Final Scientific/Technical Report)

This project was undertaken to advance the technical readiness and commercial viability of a next-generation, industrialized concrete floating foundation for offshore wind turbines called VolturnUS +. The design objective is to deliver a platform that is lower cost, faster to manufacture, simpler to deploy, and optimized for domestic supply chains and local workforce participation. To enable project financing and commercial adoption, an at-sea demonstration under representative operating conditions was required and therefore this project aimed to deploy a ¼-scale VolturnUS+ prototype offshore the Coast of Maine.

17 WIND ENERGY↗

Carbon Ores-Derived Critical Materials for Clean Energy Technology Applications

Presented at the 48th International Technical Conference on Clean Energy (Clearwater Clean Energy Conference), Clearwater, Florida, June 16-19, 2024. This presentation describes the Energy & Environmental Research Center’s development of the Upgraded Carbon Ores-to-Products (UCOP) technology to produce high‑quality graphite and other critical materials from coal and coal wastes for clean energy applications such as batteries and electrodes. It outlines the technical approach, including feedstock cleaning, controlled heat treatment, and graphitization, and presents results demonstrating high graphite purity, novel microstructures, and competitive performance relative to commercial graphite. The work highlights the potential for lower environmental impact and domestic supply chains for critical materials amid increasing global demand and supply‑chain constraints.

01 COAL, LIGNITE, AND PEAT↗

DOEGO85004_1: Final Non-proprietary Technical Report, Generating Process and Economic Data for Preliminary Design of PureVision Biorefineries DOEGO85004_2: One Original Final Proprietary Technical Report to be mailed to DOE Golden.

The overall objective of the project was to define a two-stage reactive fractionation process for converting corn stover into a solid cellulose stream and two liquid streams containing mostly hemicellulosic sugars and lignin, respectively. Toward this goal, biomass fractionation was conducted using a small continuous pilot unit with a nominal capacity of 100 pounds per day of dry biomass to generate performance data using primarily corn stover as feedstock. In the course of the program, the PureVision process was optimized for efficient hemicellulose hydrolysis in the first stage employing autohydrolysis and delignification in the second stage using sodium hydroxide as a catalyst. The remaining cellulose was deemed to be an excellent substrate for producing fermentation sugars, requiring 40% less enzymes for hydrolysis than conventional pretreatment systems using dilute acid. The fractionated cellulose was also determined to have potential higher-value applications as a pulp product. The lignin coproduct was determined to be substantially lower in molecular weight (MW) compared to lignins produced in the kraft or sulfite pulping processes. This low-MW lignin can be used as a feed and concrete binder and as an intermediate for producing a range of high-value products including phenolic resins. This research adds to the understanding of the biomass conversion area in that a new process was developed in the true spirit of biorefineries. The work completed successfully demonstrated the technical effectiveness of the process at the pilot level indicating the technology is ready to advance to a 2–3 ton per day scale. No technical showstoppers are anticipated in scaling up the PureVision fractionation process to commercial scale. Also, economic feasibility of using the PureVision process in a commercial-scale biorefinery was investigated and the minimum ethanol selling price for the PureVision process was calculated to be $0.94/gal ethanol vs. $1.07/gal ethanol for the NREL process. Thus, the PureVision process is economically attractive. Given its technical and economic feasibility, the project is of benefit to the public in the following ways: 1) it demonstrated a novel biomass fractionation process that can provide domestic supply of renewable transportation fuel from all three biomass components (cellulose, hemicellulose and lignin), 2) the lignin stream from the process has many higher-value applications beyond simply burning the lignin for energy as proposed by competing technologies, 3) it can be deployed in rural areas and create jobs in these areas, and 3) it can add to the nation’s economy and security.

09 BIOMASS FUELS↗

Hydrocarbon Speciation in Blended Gasoline-Natural Gas Operation on a Spark-Ignition Engine

The high octane rating and more plentiful domestic supply of natural gas make it an excellent alternative to gasoline. Recent studies have shown that using natural gas in dual fuel engines provides one possible strategy for leveraging the advantages of both natural gas and gasoline. In particular, such engines been able to improve overall engine efficiencies and load capacity when they leverage direct injection of the natural gas fuel. While the benefits of these engine concepts are still being explored, differences in fuel composition, combustion process and in-cylinder mixing could lead to dramatically different emissions which can substantially impact the effectiveness of the engine’s exhaust aftertreatment system. In order to explore this topic, this study examined the variations in speciated hydrocarbon emissions which occur for different fuel blends of E10 and compressed natural gas and for different fuel injection strategies on a spark-ignition engine. Results indicate that hydrocarbon emissions are clearly impacted by the base fuel structure and that differences in the underlying fuel chemistry can produce significant variations (over 300%) in the emissions of various hydrocarbon species. Injection strategy plays a role in the amount of mixing achieved and as such impacts emissions, but fuel structure is a much more significant factor. By using 50-75% percent compressed natural gas (CNG) at the lower load points, total methane and non-methane emissions could be reduced by up to 37% without any significant drop in engine efficiency. At the higher load points, usage of 100% CNG is more advantageous due to the knock constraints.

Hall, Carrie↗

Energy and other non-renewable resources

Anticipated U.S. demands for non-renewable energy and mineral resources exceed domestic supplies essential for economic growth. For the long term changes necessary in the energy supply and demand gap, new technologies and substitute materials as well as legislation and socio-economic strategies are elaborated.

Source record↗

Sims Prototype System 2 test results: Engineering analysis

The testing, problems encountered, and the results and conclusions obtained from tests performed on the IBM Prototype System, 2, solar hot water system, at the Marshall Space Flight Center Solar Test Facility was described. System 2 is a liquid, non draining solar energy system for supplying domestic hot water to single residences. The system consists of collectors, storage tank, heat exchanger, pumps and associated plumbing and controls.

Source record↗

Solar energy system performance evaluation: Seasonal report for SEMCO, Loxahatchee, Florida

The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system and the technical contributions to the definition of techniques and requirements solar energy system design are analyzed. The solar energy system was designed to supply domestic hot water for a family of four, single-family residences. It consists of two liquid flat plate collectors, single tank, controls, and transport lines.

Source record↗

Solar energy system performance evaluation: Seasonal report for IBM System 2, Togus, Maine

The solar energy system, SIMS Prototype System 2, was designed to supply domestic hot water to single family residences. The system consists of flat plate collectors, silicone working fluid, storage tanks, pumps, heat exchanger, controls, and associated plumbing. The long term field performance of the installed system was analyzed and the results are described.

Source record↗

System-Level Testing of the Advanced Stirling Radioisotope Generator Engineering Hardware

To support future NASA deep space missions, a radioisotope power system utilizing Stirling power conversion technology was under development. This development effort was performed under the joint sponsorship of the Department of Energy and NASA, until its termination at the end of 2013 due to budget constraints. The higher conversion efficiency of the Stirling cycle compared with that of the Radioisotope Thermoelectric Generators (RTGs) used in previous missions (Viking, Pioneer, Voyager, Galileo, Ulysses, Cassini, Pluto New Horizons and Mars Science Laboratory) offers the advantage of a four-fold reduction in Pu-238 fuel, thereby extending its limited domestic supply. As part of closeout activities, system-level testing of flight-like Advanced Stirling Convertors (ASCs) with a flight-like ASC Controller Unit (ACU) was performed in February 2014. This hardware is the most representative of the flight design tested to date. The test fully demonstrates the following ACU and system functionality: system startup; ASC control and operation at nominal and worst-case operating conditions; power rectification; DC output power management throughout nominal and out-of-range host voltage levels; ACU fault management, and system command / telemetry via MIL-STD 1553 bus. This testing shows the viability of such a system for future deep space missions and bolsters confidence in the maturity of the flight design.

Deep space↗

Energy Recovery Linacs for Commercial Radioisotope Production

Photonuclear reactions with bremsstrahlung photon beams from electron linacs can generate radioisotopes of critical interest. An SRF Energy Recovery Linac (ERL) provides a path to a more diverse and reliable domestic supply of short-lived, high-value, high-demand isotopes in a more compact footprint and at a lower cost than those produced by conventional reactor or ion accelerator methods. Use of an ERL enables increased energy efficiency of the complex through energy recovery of the waste electron beam, high electron currents for high production yields, and reduced neutron production and shielding activation at beam dump components. Simulation studies using G4Beamline/GEANT4 and MCNP6 through MuSim, as well as other simulation codes, will design an ERL-based isotope production facility utilizing bremsstrahlung photon beams from an electron linac. Balancing the isotope production parameters versus energy recovery requirements will inform a choice of isotope production target for future experiments.

43 PARTICLE ACCELERATORS↗

Pilot-Scale Demonstration of a Fully Integrated Commercial Process for Converting Woody Biomass into Clean Biomass Diesel Fuel

The economic recovery of petroleum, like other fossil fuels, is limited. Although the current price of oil has dramatically dropped due to increased production and new production methods, it is not expected to remain low for an extended period of time as demand increases. While new methods of obtaining these fossil energy reserves are constantly being invented and introduced, the cost of production generally continues to increase. New sources of energy such as fracking and oil shale or oil sands recovery can produce enormous amounts of energy, but at a severe cost. The current estimate on energy return for energy invested for oil shale for instance is just barely over 1, meaning that for every barrel of energy produced by oil shale there was nearly a barrel of energy invested to recover it. Furthermore, these new technologies are often constantly under attack for environmental concerns (especially given the poor ratio of energy conversion), while conventional oil is regarded as dangerous due to lack of domestic supply and susceptibility to foreign intervention that compromises overall national security. Alternatives to a petroleum-based supply of fuel are a potential route to address these issues, although they must also be economically feasible. The fuels industry is forced to consider these issues in addition to federal mandates intended to gradually diversify our fuel sources.

09 BIOMASS FUELS↗

Chemical Processing Activities for 99 Mo production by (γ,n) and (n,γ) reactions using enriched 100 Mo and 98 Mo targets

Recently, several technologies were proposed for the production of 99 Mo/ 99 mTc without the use of 235 U targets. These technologies offer the potential for a lower-cost alternative to fission produced 99 Mo, but with lower yields of 99 Mo or 99 mTc. Enriched 98 Mo or 100 Mo targets are necessary for economic production of several thousand Ci of 99 Mo. Argonne, in collaboration with Los Alamos and Oak Ridge National Laboratories, are assisting NorthStar Medical Technologies in the development of a domestic supply of 99 Mo. NorthStar’s short-term plan is to produce 99 Mo using 98 Mo(n,)γ 99 Mo reaction at MURR, and their long-term solution is to produce 99 Mo using an electron accelerator via the 100 Mo(,γn) 99 Mo reaction. The latest experimental results from irradiation of enriched 100 Mo targets, large-scale dissolution studies, and development of enriched material recycle process will be presented

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248

Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FY27 Annual LDRD Call for Proposals - external release

Proposals are now being accepted for the fiscal year 2027 (FY-27) Laboratory Directed Research and Development (LDRD) call, the FY-27 Annual LDRD Call for Proposals. Idaho National Laboratory (INL) has renewed its research and development (R&D) portfolio to align with its strategy, and this call seeks high-quality proposals that address these renewed research priorities. The LDRD Office encourages proposals that offer the potential to achieve breakthroughs in the three science and technology (S&T) strategic initiatives: • Unleashing America’s Energy Abundance: Enabling the Quadrupling of Nuclear Power by 2050; • Securing America’s Future by Developing Domestic Supply Chains for Critical and Strategic Minerals and Materials (CSMM); and • Delivering Critical National Security Technology. Proposals that support INL’s four strategic thrust areas are also encouraged: • Enabling Future Fusion Energy Systems; • Delivering Small Nuclear Reactor Technology for Space Exploration and Defense Missions; • Accelerating Technologies for Hybrid Energy and Nuclear Applications; and • Securing America’s Energy Future Through Artificial Intelligence (AI).

99 - GENERAL AND MISCELLANEOUS↗

Securing Critical Materials for the U.S. Electric Vehicle Industry: A Landscape Assessment of Domestic and International Supply Chains for Five Key Battery Materials

This study explores the prospective supply of upstream critical materials, providing insights into the U.S.'s capacity to meet its Electric Vehicle (EV) and Energy Storage System (ESS) deployment targets for 2035. It evaluates the proportion of critical materials demand that can be met by domestic upstream sources and the amount that will require non-U.S. sources. The analysis considers geological resources and current international development activities, contributing to the understanding of mineral supply security as the global community strives for net-zero emissions by 2050. The study focuses on five materials assessed in the 2023 DOE Critical Materials Assessment – Lithium, Nickel, Cobalt, Graphite, and Manganese.

33 ADVANCED PROPULSION SYSTEMS↗

Qualifications for Long-Term Analyses of Technological, Economic, and Other Obstacles Related to Alternative Electricity Supply Futures

Domestic wind power production is expanding dramatically, in support of U.S. Department of Energy (DOE) goals of supplying 20% of the nation’s electricity from the wind by 2030. While early progress is encouraging, meeting this goal will require not only installing many new wind turbines, but also making significant progress on many technological and scientific fronts involving both the extraction of power from the wind and its integration into the electricity grid. In 2008, a DOE-sponsored workshop consisting of industry, academia, and research laboratory representatives from around the world defined a set of research priorities to support increased wind-power production. The report prioritized (1) continued improvement of the many atmospheric models applied in wind power production, (2) coupling of different models to improve understanding of scale interactions involving various flow phenomena, and (3) the development of observational testbeds for collecting data focused on wind-energy related data gaps. LLNL possesses a broad base of tools and expertise to address each of these priorities, building on a long history of atmospheric boundary-layer simulation (ABL), global climate change research, and energy flow assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗