100 records · Page 6

Woody Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for n th -plant and 1 st -plant woody biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for woody biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Conventional feedstock supply systems need to be modified to meet the demands of conversion pathways, specifically to have the ability to adjust the quality of the raw biomass materials. Advanced systems incorporate innovative methods of material handling, preprocessing and supply chain configuration. In advanced designs, variability of the raw biomass can be reduced to produce feedstocks of a uniform format, moving toward biomass commoditization. Against this backdrop, the 2022 Woody SOT for low-ash woody feedstocks utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (wood, bark, needle, and extrinsic ash) to reduce impurities and attempt to maximize the retention of usable fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in forest residues, separate out a majority of the incoming needles (which can be supplied to alternate markets), and maximize the retention of whitewood in the usable fraction. The fractionated forest residues are then mixed with clean-pine chips in a 50-50 blend to prepare the feedstock for the desired conversion pathway. The n th -plant analysis estimated the delivered cost for the feedstock at $\$$69.23/dry ton (2016$\$$) which represents a $\$$6.64/dry ton decrease compared to the cost estimate of the 2021 Woody SOT supply system for low-ash woody feedstocks. The quality requirements in the 2022 Woody SOT were identical to those of the 2021 Woody SOT at = 1.00 wt % ash and = 50.51 wt% carbon. The cost savings derive primarily from reductions in dry matter losses during air classification. The GHG emissions for the n th -plant analysis were estimated at 178.39 kg CO2e/dry ton compared to 178.71 kg CO 2 e/dry ton in the 2021 Woody SOT, a decrease of 0.32 kg CO2e/dry ton. The small change stems from an increase in emissions attributed to preprocessing and slightly larger savings in emissions from transportation. In the 1 st -plant analysis of the 2022 Woody SOT system, the average throughput was estimated to be approximately 2,128 dry tons/day or 96.51% of the name plate capacity. During the simulation the daily throughput ranged from 1,090 dry tons/day to 2,200 dry tons/day, or 49.43% to 99.75% of the daily nameplate capacity. After the year of operation 722,403 tons of processed feedstock were produced in total without regard to quality considerations (99.64% of the annual nameplate capacity). The variability in throughput was primarily caused by equipment failures in the system. Regular failures, downtime caused by routine maintenance per manufacturer guidelines, contributed to a majority 62.50% of failures and 62.60% of downtime. Failures due to wear were the other cause of disruption within the system, impacting the rotary shear and orbital screen and accounting for 37.50% of the failures and 37.40% of the total downtime. Ultimately the system was on stream for 87.84% during the simulation period, which is only 2.16 percentage points below the nth-plant assumption for on-stream time. The production cost of the system averaged $\$$71.66/dry ton. The costs ranged from a minimum of $\$$71.23/dry ton to a maximum of $\$$2,115.30/dry ton. When dry matter losses (disposed low-quality fractions as well as other losses such as in grinders) were considered the costs increased to an average of $\$$75.11/dry ton with a minimum of $\$$74.69/dry ton and a maximum of $\$$2,136.86/dry ton...

09 BIOMASS FUELS↗

GeoBridge: Unearthing Insights from Connecting Communities to Geothermal Information and Opportunities: Preprint

Knowledge is essential for overcoming obstacles in the development and adoption of geothermal technologies, and the geothermal community is home to numerous tools, events and organizations dedicated to sharing knowledge. However, many of these tools can be difficult to find, their resources undiscoverable by search engines, available only to members, or hidden away behind pay walls (Weers et al., 2024). The Department of Energy's (DOE) GeoBridge was developed by the National Renewable Energy Laboratory (NREL) to help bridge gaps in information and connect the geothermal community to the resources it needs. Launched in October 2024, GeoBridge aspires to expand the pool of geothermal stakeholders by providing in-roads to geothermal information, tools, and community resources. It helps to make these resources available to the broader geothermal community as well as those looking to join, such as entrepreneurs or innovators in adjacent industries looking to expand into geothermal energy. This paper explores a post-launch analysis of GeoBridge including data from analytics, feedback from GeoBridge users, the geothermal community, and the GeoBridge Advisory Group as well as an analysis of efficacy of various promotions for GeoBridge.

15 GEOTHERMAL ENERGY↗

Laboratory evaluation of cyclic underground hydrogen storage in the Temblor sandstone of the San Joaquin Basin, California

Underground Hydrogen Storage (UHS) in depleted oil and gas reservoirs could provide a cost-effective solution to balance seasonal fluctuations in renewable energy generation. However, data and knowledge on UHS at subsurface conditions are limited so it is difficult to estimate how effective this type of storage could be. In this study, we perform high pressure experiment to measure the effectiveness of cyclic hydrogen (H 2 ) storage in a specimen of Temblor sandstone retrieved from the San Joaquin Basin of California. Our experiment mimics reservoir pressure conditions to measure H 2 -brine relative permeability and fluid-rock interactions over the course of ten charging and discharging cycles. Initial gas breakthrough occurred at 15 % to 25 % H2 saturation in the specimen with 3 % NaCl brine as the resident fluid. Continuing injecting to 4 pore volumes (PV) of H 2 yielded an asymptotic H 2 saturation of 38 % to 41 %, a level often referred to as the irreducible gas saturation based on two-phase flow. The boundary condition in this study mimics the near wellbore region, which experiences bi-directional H 2 flow. This bi-directional flow led to evaporative drying of the specimen resulting in 94 % H 2 saturation at the end of 10th cycle. This indicates that cyclic flow and evaporative drying can lead to more efficient reservoir storage where a larger fraction of the reservoir porosity is usable to store H 2 . The produced gas stream consisted of H 2 mixed with 8 % to 22 % H 2 O, indicating formation dry-out by evaporation. Meanwhile, produced water chemistry indicated calcite and silicate dissolution, with calcite sourced from fossil fragments. This led to a loss of cementation and weakened the rock sample. Combined, our results indicate dry-out, compaction, increased H 2 saturation, rock weakening, and permeability loss during cyclic UHS. Overall, we anticipate that the combined effects should lead to higher than anticipated UHS storage efficiency per volume of sandstone reservoir rock.

08 HYDROGEN↗

FY25 MOOSE Usability Improvements: 3D Meshing Capabilities, Initiation of Geometry Support for Monte Carlo Tools, and Enhancement of MOOSE/Workbench User Input Interactions

Usability improvements have been made to MOOSE and Workbench in FY25 to enhance usability and user workflows. Assorted enhancement have been made to MOOSE’s intrinsic meshing capabilities in order to enable more flexible and complex meshing of nuclear reactor systems, in particular for 3D applications. Mesh generators have been added to perform operations such as batch mesh generation, surface mesh generation, and creation of 3D transition layers. These mesh generation capabilities make it much easier to generate high quality non-extruded 3D meshes. Additionally, work to integrate Monte Carlo reactor physics simulations into MOOSE-based multi-physics workflows has reached another milestone with the implementation of the Constructive Solid Geometry (CSG) base framework. This framework lays the foundation for mesh generators to offer the user a generic CSG output option (as opposed to a finite element mesh). To support users, workshop on the MOOSE Reactor Module was delivered which featured hands-on examples using the NEAMS Workbench on INL’s High Performance Computing system. Recent updates to the NEAMS Workbench, WASP, and the MOOSE language server have introduced several improvements aimed at making MOOSE-based simulation setup and input management faster, more accurate, and easier to use. Key capabilities that have been added include multi-tab-stop autocompletion, visual input diagnostics, developer-directed data visualizations, upgraded ParaView integration, and Workspace-level file tracking. Together, these changes make it easier for users to build, validate, and manage complex MOOSE-based simulation models — especially those involving reusable components, included files, and datasets. The improvements are designed to save time, reduce input errors, and help users get to a successful simulation run faster, with more confidence in the results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Preliminary Evaluation of Joint Electricity-Hydrogen Concept of Operations

An initial thermal power dispatch (TPD) concept of operations was evaluated that couples a nuclear power plant to a nearby hydrogen production plant. GSE Systems’ generic pressurized water reactor full-scope simulator was modified with a TPD model comprised of a thermal power extraction and delivery system. A prototype human-system interface (HSI) was developed to interact with the TPD model and allow participants to execute the basic operating scenarios for normal operations. Four retired operators performed the evaluation, and due to COVID-19 travel restrictions, the original in-person experimental design was restructured to support a remote participator evaluation using a web meeting platform. Data from operator feedback, observations from the research team, and quantitative survey responses revealed that the initial TPD concept of operations is feasible. The operators were comfortable with the engineered system and HSI and could manage it without adverse impacts to reactor power, plant safety, or equipment. Findings are discussed in terms of both the TPD system design and HSI performance.

human factors↗

Using a Large Language Model as a Building Block to Generate Usable Validation and Verification Suite for OpenMP

In the HPC area, both hardware and software move quickly. Often new hardware is developed and deployed, the corresponding software stack, including compilers and other tools, are under active development while leading edge software developers are working to port and tune their applications, all at the same time. While the software ecosystem is in flux, one of the key challenges for users is obtaining insight into the state of implementation of key features in the programming languages and models their applications are using – whether they have been implemented, and whether the implementation conforms to the specification, especially for newly implemented features (less tested by widespread use). OpenMP is one of the most prominent shared memory programming models used for on-node programming in HPC. With the shift towards accelerators (such as GPUs and FPGAs) and heterogeneous programming OpenMP features are getting more complex. It is natural to ask whether generative AI approaches, and large language models (LLMs) in particular, can help in producing validation and verification test suites to allow users better and faster insights into the availability and correctness of OpenMP features of interest. In this work, we explore the use of ChatGPT-4 to generate a suite of tests for OpenMP features. We have chosen a set of directives and clauses, a total of 78 combinations, which first appeared in OpenMP 3.0 (released in May 2008) but are also relevant for accelerators. We prompted ChatGPT to generate tests in the C and Fortran languages, for both host (CPU) and device (accelerator). On the Summit super-computer using the GNU implementation, we found that, of the 78 generated tests 67 C tests and 43 Fortran tests compiled successfully and fewer than those executed to completion. On further analysis we show that not all generated tests are valid. We document the process, results, and provide detailed analysis regarding the quality of tests generated. With the aim of providing input to a production quality validation and verification suite, we manually implement the corrections required to make the tests valid according to the current OpenMP specification. We quantify this effort as small, medium, or large, and record the lines of code changed to correct the invalid tests. With the corrected tests we validate recent implementations from HPE, AMD, and GNU on the Frontier supercomputer. Our experiment and subsequent analysis show that although LLMs are capable of producing HPC specific codes, they are limited by their understanding of the deeper semantics and restrictions of programming models such as OpenMP. Unsurprisingly more commonly used features have better support, while some OpenMP 3.0 directives such as sections and tasking are not universally supported on accelerators. We demonstrate that successful compilation and execution to completion are inadequate metrics for evaluating generated code and that, at this time, commodity LLMs require expert intervention for code verification. This points to gaps in the training data that is currently available for HPC. We demonstrate that with "small" effort 37% of generated invalid C tests and 63% of generated invalid Fortran tests could be corrected. This improves productivity of test generation as we circumvent writing from scratch and the common programming errors associated with it.

Pophale, Swaroop [ORNL] (ORCID:0000000185446367)↗

High-Speed and High-Quality Field Welding Repair Based on Advanced Non-Destructive Evaluation and Numerical Modeling

Creep strength-enhanced ferritic (CSEF) steels such as Grade 91 (9Cr-1Mo-V) and Grade 92 (Fe-9Cr-2W-0.5Mo) steels are widely used in the fossil-fuel-fired and nuclear power plants. The weld integrity of these steels is crucial for power plants' safe and reliable operations. Due to harsh service conditions, the steel weld can become susceptible to environmental degradation. Field welding repair is used to restore the degraded weld’s performance where a controlled temper-bead welding technique is commonly used to temper the freshly formed martensite during welding. However, knowledge of weld repairability is limited and experimental trial and error optimization to achieve desired microstructure and joint properties is expensive and time-consuming. Many existing computational models, e.g., finite element models, are limited to solving heat conduction equation and ignoring convective heat transfer due to molten metal flow. These models can result in over-prediction of peak temperatures of weld pool and heat-affected zone (HAZ), which in turn can affect the accuracy of tempering prediction. Moreover, these finite element models require an input of the deposit profiles in advance and thus limits the usability of these models. Here, a molten pool-based, multi-pass multi-layer model has been developed based on computational fluid dynamics (CFD) approach with the Volume of Fluid (VOF) method. The model calculates the bead formation, thereby eliminating the need for pre-determined bead profiles required by finite element models. For computational efficiency, a coordinate system attached to the moving heat source is utilized. A subroutine is developed to convert the temperature profiles in the reference frame stationary to the heat source to that stationary to the workpiece. The converted thermal cycles are then imported into a microstructure model to compute the tempering kinetics and resultant hardness using a Johnson-Mehl-Avrami-Kolmogorov (JMAK), and modified Grange-Baughman parameter. The modeling approach is first developed and validated on single- and multi-pass deposition of stainless steel filler metal onto a SA-533 high strength steel substrate. The models are then applied to a multi-pass V-groove repair weld of Grade 91 steel plate as well as directed energy deposition of Grade 92 steel. Non-destructive characterization of microstructures was performed on Grade 91 and 92 steel welds. Two welding processes, cold metal transfer (CMT) and flux-cored arc welding (FCAW), were investigated for the Grade 91 steel weld samples. For the Grade 92 weld samples, three different heat inputs (low, medium, and high) of gas tungsten arc welding (GTAW) were utilized to replicate traditional field welding processes. The non-destructive evaluation (NDE) method used for this research was immersion ultrasonic testing (UT) using a micro-resolution ultrasonic imaging methodology specifically designed to operate in the through-transmission configuration operating at 20 MHz of frequency. The system used a focused ultrasonic beam spot size diameter between 250-300 μm, and a 6 μm laser vibrometer spot size for detection, to produce highly defined images with longitudinal and mode-converted shear waves. From the micro-resolution ultrasonic C-scan images, three microstructural regions, i.e., weld metal (WM), HAZ, and base metal (BM), were clearly identifiable. Various levels of ultrasonic amplitudes distributed over the three regions were correlated with electron beam backscattered diffraction (EBSD) images using grain size, grain boundaries, and dislocation densities. The results showed that areas with relatively higher ultrasonic amplitude levels were associated with smaller grains and higher dislocation densities, while areas with lower amplitude levels were associated with larger grains and lower dislocation densities. In addition, ultrasonic velocity data obtained across the three different weld microstructural regions of Grade 91 test samples were correlated with optical metallographic images and hardness measurements. The results showed distinctive decreases in ultrasonic velocity and hardness over the HAZ region, where weld failures often occur during service.

36 MATERIALS SCIENCE↗

Regional surrogates for predictive control of digital twins

Digital twins of complex systems must involve a model that is fast, generalizable, and usable for real-time control. For example, high-fidelity nonlinear multiphysics simulations can capture laser-material interactions, but are too slow for optimization or model predictive control (MPC). Reduced-order models, used to accelerate such computation, frequently fail to generalize to unseen inputs or control states. We show theoretically that this failure is intrinsic, i.e., that a learned model is non-unique outside the sampled subspace when its low-rank structure arises from limited excitation and clustered eigenvalues, rather than from a user-imposed truncation alone. Motivated by this result, we propose a control-ready regional surrogate-construction framework for both autonomous and nonautonomous dynamics; it employs Koopman lifting to represent nonlinearities, while preserving spatial locality. We illustrate our approach by constructing a control-ready surrogate for the digital twin of a thermal component of additive-manufacturing process. Our surrogate, localized in space through a von Neumann stencil, is learned from noisy high-fidelity simulations that emulate thermal-camera images collected during the manufacturing. It is linear in thermo-physically augmented states so that MPC reduces to a convex quadratic program. The surrogate requires no online correction, generalizes to unseen scan paths and power profiles of the laser, and is more than three orders of magnitude faster than a finite-difference solver. Furthermore, when the MPC sequence computed on the digital twin is applied to this solver, closed-loop temperature regulation is recovered, showing that the surrogate preserves control-relevant input-output behavior.

Data-driven model↗

Multiphysics Modeling of Microreactors with NEAMS codes, and Validation Based on KRUSTY Reactivity Insertion

The NEAMS Multiphysics Applications team continues to assess code usability and functionality for microreactor design and safety analyses, while demonstrating that NEAMS tools capture both steady-state and transient behavior across distinct microreactor concepts. In FY2025, the team advanced full-core, high-fidelity, multiphysics models that solve more complex problems and strengthen verification/validation for several microreactor systems: heat-pipe microreactor (HPMR), gas-cooled microreactor (GCMR), and the KRUSTY experiment. These models employ the MOOSE MultiApp/Transfers architecture with Griffin for neutronics, BISON for heat conduction/thermomechanics, Sockeye for heat pipes, SAM/THM for coolant channels and loops, and SWIFT for hydride behavior, with meshes generated via the MOOSE Reactor Module. The graphite models available in the Grizzly code were also investigated for future analyses. For the HPMR, a Na-HPMR variant was constructed to align with recently validated heat-pipe experiments and Sockeye’s LCVF capability, enabling mechanistic heat-pipe transients and startup modeling. The Na-HPMR will serve as the primary model for HPMR investigations in upcoming tasks. The load-following and single heat-pipe failure scenarios (Griffin/BISON/Sockeye), which were previously modeled for the K-HPMR, were replicated for the Na-HPMR, showing strong negative temperature feedback and highly localized thermal effects, respectively, while the startup case captured vapor-front progression and heat-removal activation. Solid mechanics was added to the previously built K-HPMR full-core model in BISON, showing minimal impact on steady-state reactivity yet enabling stress-field predictions that prepare the path for full-core TRISO performance analyses. For the GCMR, automated steady-state and four transient scenarios were executed using Griffin/BISON/SAM/SWIFT. Results confirm robust inherent safety: power collapses promptly in loss-of-cooling events, the inlet-temperature drop settles to a new equilibrium, and a single-channel blockage yields only a ~30 K local fuel-temperature rise with <0.4% power decrease. SWIFT-predicted hydrogen redistribution affects reactivity during both steady-state and transient conditions, underscoring its importance. A Brayton-cycle balance of plant (BOP) model in SAM/THM demonstrated stable startup behavior, and xenon-driven reactivity during load following was analyzed. To improve TRISO-compact temperature fidelity, a fast multiscale Heat Source Decomposition (HSD) treatment was implemented. Against heterogeneous benchmarks, HSD reduces underprediction of kernel temperatures and lowers predicted peak powers in reactivity-insertion transients compared to previous homogenized models. KRUSTY warm-critical validation progressed from FY2024 baselines: the 15Ȼ insertion shows excellent agreement in peak power (~2% high) and temperature trends, and the 30Ȼ case was automated via a feedback controller that maintained power near 3 kW for ~150 s with close agreement to data. The successful modeling of the warm critical tests has laid a strong foundation for simulating more complex nuclear system tests in the years ahead. Throughout FY2025, developer feedback was provided (e.g., MOOSE batch mesh generation, distributed pre-split meshes, Griffin sweeper on displaced meshes), several new models were contributed to the Virtual Test Bed, and an OECD-NEA WPRS multiphysics benchmark based on the HPMR was initiated to enable broader cross-comparison and best-practice development with the nuclear community at large.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗