At least 109 records · Page 6

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Eastern Renewable Generation Integration Study: Flexibility and High Penetrations of Wind and Solar; NREL (National Renewable Energy Laboratory)

Balancing wind and solar in a model is relatively easy. All you need to do is assume a very large system with infinite flexibility! But what if you don't have an infinitely flexible system? What if there are thousands of generators nestled in a handful of regions that are unlikely to change their operational practices? Would you still have enough flexibility to balance hundreds of gigawatts of wind and solar at a 5 minute level? At NREL, we think we can, and our industry partners agree. This presentation was presented at the IEEE Power and Energy Society General Meeting by Aaron Bloom, highlighting results of the Eastern Renewable Generation Integration Study.

14 SOLAR ENERGY↗

Baselining PMU Data to Find Patterns and Anomalies

This paper looks at the application of situational awareness methodologies with respect to power grid data. These methodologies establish baselines that look for typical patterns and atypical behavior in the data. The objectives of the baselining analyses are to provide: real-time analytics, the capability to look at historical trends and events, and reliable predictions of the near future state of the grid. Multivariate algorithms were created to establish normal baseline behavior and then score each moment in time according to its variance from the baseline. Detailed multivariate analytical techniques are described in this paper that produced ways to identify typical patterns and atypical behavior. In this case, atypical behavior is behavior that is unenvisioned. Visualizations were also produced to help explain the behavior that was identified mathematically. Examples are shown to help describe how to read and interpret the analyses and visualizations. Preliminary work has been performed on PMU data sets from BPA (Bonneville Power Administration) and EI (Eastern Interconnect). Actual results are not fully shown here because of confidentiality issues. Comparisons between atypical events found mathematically and actual events showed that many of the actual events are also atypical events; however there are many atypical events that do not correlate to any actual events. Additional work needs to be done to help classify the atypical events into actual events, so that the importance of the events can be better understood.

Baselining analyses↗

Visualizing Electrical Power Systems as Flow Fields

We describe a method for visualizing data flows on large networks. We transform data flow on fixed networks into a vector field, which can be directly visualized using scientific flow visualization techniques. We evaluated the method on power flowing through two transmission power networks: a small, regional, IEEE test system (RTS-96) and a large national-scale system (the Eastern Interconnection). For the larger and more complex transmission system, the method illustrates features of the power flow that are not accessible when visualizing the power transmission with traditional network visualization techniques.

97 MATHEMATICS AND COMPUTING↗

Distributed Parareal in Time with Adaptive Coarse Solver for Large Scale Power System Simulations

This paper describes a distributed Parareal in time algorithm with the adaptive coarse solver. In the distributed algorithm, the propagation of a coarse solution is distributed among processors in addition to the fine solution propagation. In the adaptive coarse solver the complexity of the model is changed based on the size of generator rotor angle deviation. In addition, non-iterative approach to model a ZIP load is presented. The proposed method is tested on the large-scale 5617-machine 70285-bus Eastern Interconnection system.

Osipov, Denis↗

Hybrid EMT-TS Simulation Strategies to Study High Bandwidth MMC-Based HVdc Systems

Modular multilevel converters (MMCs) are widely used in the design of modern high-voltage direct current (HVdc) transmission system. High-fidelity dynamic models of MMCs-based HVdc system require small simulation time step and can be accurately modeled in electro-magnetic transient (EMT) simulation programs. The EMT program exhibits slow simulation speed and limitation on the size of the model and brings certain challenges to test the high-fidelity HVdc model in system-level simulations. This paper presents the design and implementation of a hybrid simulation framework, which enables the co-simulation of the EMT model of Atlanta-Orlando HVdc line and the transient stability (TS) model of the entire Eastern Interconnection system. This paper also introduces the implementation of two high-fidelity HVdc line models simulated at different time steps and discusses a dedicated method for sizing the buffer areas on both sides of the HVdc line. The simulation results of the two HVdc models with different sizes of buffer areas are presented and compared.

Liu, Yuan↗

Phasor-Measurement-Unit-Based Data Analytics Using Digital Twin and PhasorAnalytics Software

A major objective of this project was to apply GE’s commercial machine learning and data analytics toolsets to large-scale, real-world, anonymized Phasor Measurement Unit (PMU) datasets in order to extract signatures, correlated and/or causal factors, and precursor patterns associated with significant power system phenomena. The project had a particular emphasis on extraction of insights relevant to asset health monitoring, real-time load modeling and cybersecurity monitoring. Additionally, the team was directed to undertake a comprehensive data quality analysis for the provided datasets and encouraged to estimate the ‘machine-learning readiness’ of the datasets by documenting any major obstacles to the application of commercial machine learning algorithms. To accomplish the aforementioned objectives, the project team’s work centered around the identification of key event signatures and application of the identified event signatures for event detection and event classification. The industry-validated, semi-supervised machine learning strategy employed for event signature identification involved several major tasks, including data-preprocessing, generation of an overabundance of features, normal data identification, normality modeling, and event signature identification through a methodical, quantitative ranking of features in order of relevance to each studied event type. Throughout the project, data quality issues and mitigation techniques were investigated. In this report, insights are provided regarding the readiness of the provided synchrophasor datasets for application of machine learning and data analytics. The methodologies employed for this technical strategy are summarized in this report. With regards to data preprocessing and feature generation, the provided Training and Test Datasets were ingested into GE’s big data environment. Subsequently, the team applied bad data cleansing and data imputation scripts, event detection scripts, and application programming interfaces (APIs) to the datasets for convenient data access. The project team completed development and validation of dozens of physics-based, statistics-based and transformation-based feature functions used for the extraction of over 60 synchrophasor features. Using a new parallel feature generation technology developed on this project, over 60 features have been rapidly generated for the full two years’ worth of Training and Test Dataset data associated with both the Eastern and Western interconnects. Even accommodating for temporal down-sampling inherent to the feature extraction procedure, this parallel feature generation activity resulted in a massive feature set with a storage requirement approximately equal to that of the raw training dataset itself. With regards to normal data identification and normality modeling, a normality model was built using the feature data extracted from the Training Dataset and iteratively refined subsequent to incremental adjustments and expansions of the Training Dataset feature data. With respect to event characterization and signature identification, an event signature identification pipeline was developed and used in conjunction with the normality model to identify over 15 event signatures for key event categories within the Training Dataset. The identified event signatures were used to characterize hundreds of key events in terms of relative severity, duration, and location of the event. An investigation was undertaken to identify correlated and causal factors involved in transformer events. A separate investigation into temporal trends in ring-down analysis results was undertaken to determine possible associations between system dynamics and various other factors such as loading, season or year. To validate the identified event signatures, additional work was undertaken to develop signature-based anomaly detection and classification tools suitable for convenient application to the synchrophasor datasets. The anomaly detection and classification tools, suitable for online application, were then applied to the entirety of the Eastern Interconnect Training and Test Datasets. Performance of the event detection and classification tools was evaluated upon receipt of the Test Dataset event logs (i.e., the labels for events contained in the Test Dataset), and promising results were obtained despite several challenges (documented herein) associated with application of supervised or semi-supervised machine learning methods to large-scale, anonymized datasets. Finally, the detection and classification tools were used to detect, classify, and characterize thousands of new events not included in the original event logs provided by the DOE within both the Training and Test Datasets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗

Hydropower operation in future power grid with various renewable power integration

Hydropower generation may play an increasingly important role in the power grid under increasing contribution of variable renewable sources such as wind and solar. An improved understanding of the changes to hydropower dispatch under future higher VRE grid conditions reveals research gap that should be informed power grid planning and reservoir water releases policies considering multiple other water uses and varying hydrologic condition. Here this study aims to understand the role of hydropower in a changing power grid by employing a production cost model, PLEXOS, across future power system scenarios, planning horizons, and regions. We explore optimized hydropower dispatch to understand its potential role in minimizing the system cost and renewable curtailment. We also examine the sensitivity of hydropower revenue under various grid scenarios of the Eastern U.S. and hydrology conditions. Results indicate hydropower generation follows net load and compensates for the variability of solar and wind generation. Although energy prices are lower during some periods in the future grid scenarios, there is a potential for higher revenue for hydropower by providing both energy and ancillary services during times of stress. Additionally, hydropower revenue is sensitive to hydrology in the SERC region, which we considered as an example. The feasibility of hydropower dispatching with higher ramps between low and high hourly-capacity factors, as indicated in the optimization model, requires further study to consider other water use and ecology constraints.

13 HYDRO ENERGY↗

Redefining What's Possible for Renewable Energy: Grid Integration

The Energy Department's National Renewable Energy Laboratory (NREL) is spearheading engineering innovations that will help optimize the entire energy system, and the lab's analysis capabilities complement that engineering work by identifying ways to integrate renewable energy effectively and economically. This 3-minute video shows how NREL research and analysis are redefining what’s possible for renewable energy on the grid.

14 SOLAR ENERGY↗

The Eastern Renewable Generation Integration Study: Insights on System Stress: Preprint

The Eastern Renewable Generation Integration Study (ERGIS) explores the operational impacts of the wide spread adoption of wind and solar photovoltaics (PV) resources in North America's Eastern and Quebec Interconnections. We explore the impact of large scale adoption of wind and solar generation on the unit commitment and economic dispatch of the largest coordinated power system in the world by simulating hourly and five-minute operations. Using NREL's high-performance computing capabilities and new methodologies to model operations, we found that the modeled system, as simulated with evolutionary change in 2026, could balance the variability and uncertainty of wind and solar PV at a five-minute level under a variety of conditions. Our simulations achieve instantaneous penetrations that exceed 50% of load while meeting an annual penetration of 30% on an energy basis. The system meets balanced load and supply in all intervals, with modest curtailment, using technologies and practices that are widely available today. However, a variety of the conditions present in these simulations deviate substantially from historical practice. In this work, we analyze potentially stressful system conditions that occur in the simulations and identify opportunities for innovation, regulatory reform, and changes in operating practices that require further analysis to enable the transition to a system with more wind and solar PV.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HVDC Macrogrid Modeling for Power-flow and Transient Stability Studies in North American Continental-Level Interconnections

High Voltage Direct Current (HVDC) transmission lines are being constructed throughout the world, aided by advancements in power electronics and the potential value to transfer power between distant areas and off-shore locations. Multiple HVDC lines within and across large AC interconnections could bring about economic benefits such as interregional capacity exchange, and transfer of low-cost, distant electric energy directly to load centers. In addition, network configuration of HVDC lines could result in additional benefits that have not been deeply studied. This paper describes the modeling process for continental-level power system interconnections with the addition of multiple HVDC lines configured as a macrogrid. The models used for study are based on industry-accepted power-flow and dynamic system models for the North American Eastern and Western Interconnections. The model provides insight on feasibility and initial steady-state and stability tests of the HVDC macrogrid and its interactions with the existing electricity infrastructure, opening the door to analysis of the technical value of such a macrogrid.

HVDC transmission, North American Power Grids, AC ↗