Search NASA⌕ Search

SEARCH · Search NASA

Results for “EV charging infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Third Quarter 2020

The U.S. Department of Energy’s Alternative Fueling Station Locator contains information on public and private non-residential alternative fueling stations in the United States and Canada and currently tracks ethanol (E85), biodiesel, compressed natural gas, electric vehicle (EV) charging, hydrogen, liquefied natural gas, and propane stations. Of these fuels, EV charging continues to experience rapidly changing technology and growing infrastructure. This report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2020. Using data from the Station Locator, this report breaks down the growth of public and private charging infrastructure by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with the amount projected to meet charging demand by 2030. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape for EV charging. This is the third report in a new series. Reports for the first two calendar quarters of 2020 can be found in the publication databases of the Alternative Fuels Data Center and the National Renewable Energy Laboratory.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2020

The U.S. Department of Energy’s Alternative Fueling Station Locator contains information on public and private non-residential alternative fueling stations in the United States and Canada and currently tracks ethanol (E85), biodiesel, compressed natural gas, electric vehicle (EV) charging, hydrogen, liquefied natural gas, and propane stations. Of these fuels, EV charging continues to experience rapidly changing technology and growing infrastructure. This report provides a snapshot of the state of EV charging infrastructure in the United States in the second calendar quarter of 2020. Using data from the Station Locator, this report breaks down the growth of public and private charging infrastructure by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with the amount projected to meet charging demand by 2030. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape for EV charging. This is the second report in a new series. The first report for the first calendar quarter of 2020 can be found in the publication databases of the Alternative Fuels Data Center and the National Renewable Energy Laboratory.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Efficiency Ratios for Light-Duty Vehicles Registered in the United States

Electric vehicles (EVs) use energy more efficiently than gasoline vehicles. This is one of their primary attributes, enabling other benefits such as improved torque and reduced operating costs and greenhouse gas emissions. An electric vehicle efficiency ratio (EVER) is therefore important when calculating the financial and environmental benefits of EVs, calculating the impact that EVs have on a manufacturer's Corporate Average Fuel Economy rating, calculating credits in trading schemes such as California's Low Carbon Fuel Standard, fuel price leveling, designing electricity tariffs from utility-owned public charging infrastructure, creating EV alternatives to gasoline excise taxes, and more.

33 ADVANCED PROPULSION SYSTEMS↗

Overview of the Electrification of Transportation in Hawaii

This document is a summary of electric vehicle (EV) experiences in Hawaii. It is meant to be informative but does not present any new technical analysis except for the development of key lessons learned that could be applied in similar contexts. The electrification of transportation is essential for Hawaii's energy goal. An electrification of transportation strategy complements other energy policy goals, increases clean energy impacts, and provides customer value. By the end of 2020, there were over 12,000 EVs registered in Hawaii (about 1 percent of all cars). That number is expected to grow, based on the results from recent surveys and studies in Hawaii. Surveys pointed out the need for more charging stations, especially in places where people do business or park for long periods of the day. Participation in controlled charging programs should have attractive incentives since a majority of EV owners would not be willing to interrupt their EV charging for demand response. Various studies have confirmed the EV potential in Hawaii. For example, the JUMPSmart Maui demonstration project, a public-private partnership with Japan, helped to establish the EV charging station infrastructure in Maui and provided important information about charging behaviors. A critical backbone study commissioned by the utility recommended that 3,600 public chargers be installed by 2030 on the five islands, which confirms the need for infrastructure improvements expressed in earlier surveys. The process that emerged in Hawaii can be an example to other locations, which could heed the lessons from Hawaii's EV experiences: The importance of an overarching energy goal/objective based on a shared vision; planning and pilot projects; a strategic plan (roadmap) leveraging on initial experiences; evaluation of the effectiveness/success of actions; fine-tuning as needed; close regulatory oversight and stakeholder participation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Community Engagement Tips for EV Infrastructure Deployment

This Joint Office of Energy and Transportation help sheet provides tips for conducting community engagement to support electric vehicle (EV) infrastructure planning and deployment. This document is a tool and an informative resource to be used in conjunction with other guidance. It is not intended to set policy or establish or replace any standards under state or federal law applicable to public notice or community engagement.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of smart charging for electric vehicle-to-building integration: A case study

Higher electric vehicle (EV) adoption will stress the importance of demand flexibility to achieve more economic, efficient, and reliable grid operation. Charging technologies will be paramount in shifting temporally to better fit the variable generation of wind and solar. As such, analysis is warranted on the benefits of EV charge scheduling with respect to installation cost, operation cost, difficulty of implementation, and grid flexibility. We tackle this by analyzing the cost savings of implementing an EV charge scheduling infrastructure to reduce demand charges and installation costs. In this paper, we analyze a case study for operation of 16 level 2 chargers and 1 fast charger for two different building types. We then evaluate various test phases for controlling building and charging loads using an adaptive charging network (ACN) algorithm to characterize the ACN’s potential to reduce overall project cost.

30 DIRECT ENERGY CONVERSION↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Q4 2020)

The U.S. Department of Energy’s (DOE’s) Alternative Fueling Station Locator contains information on public and private non-residential alternative fueling stations in the United States and Canada and currently tracks ethanol (E85), biodiesel, compressed natural gas, electric vehicle (EV) charging, hydrogen, liquefied natural gas, and propane stations. Of these fuels, EV charging continues to experience rapidly changing technology and growing infrastructure. This report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2020 (Q4). Using data from the Station Locator, this report breaks down the growth of public and private charging infrastructure by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with the projected amount needed to meet charging demand by 2030. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape for EV charging. This is the fourth report in a series. Previous reports for the first (Q1), second (Q2), and third (Q3) calendar quarters of 2020 can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases.

33 ADVANCED PROPULSION SYSTEMS↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

National Fire Protection Association Spurs the Safe Adoption of EVs Through Education and Outreach

As electric vehicles (EV) and their charging infrastructure steadily increase in popularity across the U.S., growing pains still exist, impeding their true potential for growth. The barriers include a general lack of knowledge around EV systems, range anxiety, electrical workplace safety practices, code compliance and inspection for charging stations, maintenance garages and workers, insurance concerns, and the potential risks associated with damaged lithium-ion batteries (fires, re-ignition, water immersion, and stranded energy).NFPA partnered with SMEs, training development organizations, and Clean City Coalitions to create a series of common online trainings for each EV ecosystem sector, educating communities on the realities of EV proliferation, myths, facts, statistics, codes, and basic information for each sector to become versed in EV knowledge. We also constructed a workshop program for the many EV stakeholders who should be involved in setting up a strategic, cohesive outlook for the participating towns and cities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring impacts of electricity tariff on charging infrastructure planning: An activity-based approach

In the past decade, electric vehicles (EVs) have gained popularity for their efficiency and environmental benefits. Advances in battery technology and charging equipment have yielded long-range EVs and fast-charging. However, many major cities lack adequate charging infrastructure for daily EV use. This study addresses this gap by integrating activity-based modeling, charging behavior simulation, and charging infrastructure optimization. The research utilizes the POLARIS agent-based transportation model to accurately capture user activities, trip patterns, and traffic flows. Additionally, the study investigates the impact of fixed and spatiotemporal electricity rate distributions on optimal charging infrastructure deployment. The framework is applied to the Chicago regional area network and analyzed under various EV ownership scenarios. Further, the results reveal significant impacts of the charging pricing strategy on user decision-making and charging demand distribution. There is also a need for consistent pricing policies in charging infrastructure planning and operational phases to avoid drops in service quality.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Control Strategy for Improving Resiliency of an DC Fast Charging EV System

As DC fast charging electric vehicle (EV) infrastructure continues to expand, potential challenges loom. One issue is the potential for EV charger outages due to electrical grid voltage transients. Today, EV chargers are expected to disconnect under a severe voltage sag (below 70%) which reduces electric vehicle charging infrastructure resilience. This work proposes a droop-control solution to ride-through voltage sags and maintain operation. The control solution is presented in a controller hardware in the loop platform.

Starke, Michael↗

Impacts and emerging research opportunities in Vehicle-Grid Integration for transportation: A review

This review provides a comprehensive examination of Vehicle-Grid Integration (VGI) technologies and their impacts on transportation systems, with a particular emphasis on the transportation-energy nexus. It systematically explores how VGI affects key transportation applications such as charging infrastructure planning, electric vehicle (EV) routing, smart charging coordination, shared mobility, and dynamic pricing. By synthesizing recent literature from both transportation and energy systems perspectives, this study highlights how advanced methodologies, such as reinforcement learning, game theory, and optimization techniques, are used to model the complex interactions between EVs, mobility patterns, and distributed energy systems. Furthermore, the review also identifies critical challenges, including behavioral factors, data limitations, and system scalability. Drawing on these insights, the paper outlines emerging research opportunities to support the design of integrated, resilient, and user-centric VGI solutions that advance sustainable mobility and energy system efficiency.

Charging coordination↗

Integrating Electric Vehicle Charging Infrastructure into Commercial Buildings and Mixed-Use Communities: Design, Modeling, and Control Optimization Opportunities: Preprint

This paper discusses modeling and field studies of controlled EV charging that have been performed with the goal of minimizing requirements for infrastructure upgrades, minimizing building peak demand charges, and maximizing the use of on-site generation. We present a large-scale workplace charging pilot of a demand-controlled scheduled EV charging system with over 250 active daily commuters, successfully demonstrating management of aggregate charging power to avoid new infrastructure investments, mitigate peak demand charges, and provide cost-effective workplace charging to users. In addition to understanding opportunities for demand management, integrating these controllable loads into the energy modeling process for new buildings will also be necessary. This paper then presents an example energy modeling process that evaluates the potential effects of EV charging on building load profiles and infrastructure requirements for a mixed-use community. Finally, we discuss an illustration of how EV charging can be controlled to be synergistic with other building loads and distributed generation.

buildings↗

Strategic Energy Plan: City of Key West, Florida

This Strategic Energy Plan for the city of Key West, Florida—developed through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project (ETIPP)—outlines a comprehensive strategy to advance the city’s energy vision: to improve energy efficiency and independence using local energy resources to foster long-term resilience. To guide this effort, the plan is structured around four focus areas: • Energy efficiency: Reduce overall energy consumption and utility costs across municipal, residential, and commercial buildings. • Local energy generation: Increase the share of energy produced from local sources to enhance energy independence. • Resilience: Strengthen critical infrastructure and community preparedness for flooding, hurricanes, and other natural weather hazards. • Electric transportation: Support the addition of new electric vehicles (EVs) and develop reliable charging infrastructure to reduce reliance on imported fuels. ETIPP provides strategic energy planning, technical assistance, and direct funding to U.S. coastal, remote, and island communities to improve energy resilience. Key West was part of ETIPP’s fourth cohort. As a low-lying island community vulnerable to infrastructure damage due to natural weather hazards, Key West seeks to reduce its dependence on external energy and build long-term sustainability. The Strategic Energy Plan identifies specific challenges, sets clear goals, and proposes actionable opportunities with implementation timelines and key stakeholders. A baseline assessment reveals significant energy consumption in both city-owned and residential/commercial buildings, limited local energy generation, and an early-stage EV market with vulnerable charging infrastructure. The proposed solutions emphasize a multifaceted approach, leveraging both established and innovative technologies, while addressing financial, technical, and community engagement challenges. The baseline assessment provided a snapshot of current energy conditions in Key West, evidencing key challenges and opportunities across the city’s energy priorities. Building on the baseline assessment and extensive input from city staff, local stakeholders, and community partners, a set of targeted opportunities was identified to address Key West’s energy goals. Each was evaluated in terms of its potential benefits, key implementation steps, associated challenges and mitigation strategies, and the city departments and stakeholders best positioned to lead or support progress.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVs-at-RISC: A Secure and Resilient Interoperable SCM Control System Architecture for Electric Vehicle’s-at-Scale (Final Technical Report)

The EVs-at-RISC project was a five-year research, development, and demonstration initiative to create foundational tools for utility-scale fleet aggregation and Smart Charge Management (SCM) of Electric Vehicles (EV), Electric Vehicle Charging Infrastructure (EVCI), and related Distributed Energy Resources (DER). Rather than seeking to develop and demonstrate highly perfected SCM algorithms and control strategies, this project instead focused on creating foundational software solutions that enable unprecedented digital interoperability across the communications technologies and vendor platforms used to manage EV , EVCI, and DER, as well as existing energy management infrastructure operated by utilities, grid operators, and aggregators. This project then extends these novel interoperability capabilities to develop and deploy powerful middleware abstractions across grid edge networks and EVCI/DER fleet aggregations incorporating modern software tools and best practices, such as CI/CD, to bring the immense capabilities of infrastructure-as-code and policy-as-code to modern grid edge network environments. This addresses the foremost systemic issues preventing realization of any net operational benefits from scaled deployment of behind-the-meter EV, EVCI, and DER assets in electric power grids and markets today. The results of this approach and project unlock massive potential for new SCM capabilities to be easily prototyped, evaluated, and deployed at-scale within the existing grid edge network infrastructure and EVCI/DER technology ecosystem. The EVs-at-RISC project achieves this by extending Open Field Message Bus (OpenFMB), a conceptual model for digital interoperability and distributed intelligence in traditional front-of-meter utility SCADA networks, validating our hypothesis that OpenFMB could be similarly used to solve systemic digital interoperability issues in behind-the-meter environments and unlock real-world utility-scale SCM capabilities without requiring any new proprietary vendor solutions or significant infrastructure reconfiguration.

24 POWER TRANSMISSION AND DISTRIBUTION↗