Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

The North American Renewable Integration Study (NARIS): A U.S. Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a U.S. perspective in coordination with the U.S. Department of Energy, and a companion report describes a Canadian perspective in coordination with the Natural Resources Canada. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

The North American Renewable Integration Study (NARIS): A Canadian Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a Canadian perspective in coordination with the Natural Resources Canada, and a companion report describes a U.S. perspective in coordination with the U.S. Department of Energy. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

Solar power from satellites

Microwave beaming of satellite-collected solar energy to earth for conversion to useful industrial power is evaluated for feasibility, with attention given to system efficiencies and costs, ecological impact, hardware to be employed, available options for energy conversion and transmission, and orbiting and assembly. Advantages of such a power generation and conversion system are listed, plausible techniques for conversion of solar energy (thermionic, thermal electric, photovoltaic) and transmission to earth (lasers, arrays of mirrors, microwave beams) are compared. Structural fatigue likely to result from brief daily eclipses, 55% system efficiency at the present state of the art, present projections of system costs, and projected economic implications of the technology are assessed. Two-stage orbiting and assembly plans are described.

Glaser, P. E.↗

Preliminary Design Process for Networked Microgrids

Changes in economic, technology, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, and the potential to integrate electricity generation with other municipal functions. When grid-connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via networks of microgrids. While the design process for a single stand-alone microgrid is relatively well understood, the process of designing the infrastructure for networked microgrid operations has not been well studied. Because of the wide range of potential operational goals for microgrids, it is typical to follow the engineering process of developing an initial conceptual design, a preliminary design, a detailed design, and then a final as-built design. The conceptual design is typically completed without detailed engineering analysis, and the preliminary design is the first stage that requires it. This paper presents a process for developing the preliminary design for networked microgrids, which can then be used as a basis for the final as-built design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mapping Critical Vulnerabilities in Natural Gas Pipeline Systems through Network Centrality and GIS Analytics

Natural gas plays a central role in the US energy landscape, providing 43% of electricity generation in 2023. Its exclusive recovery ability on pipelines for transmission underscores the importance of understanding the disruption recovery ability of this infrastructure. This study employs a network-based analytical framework integrating geographic information systems (GIS) with multiple centrality measures—betweenness, closeness, degree, and eigenvector—to pinpoint key segments and evaluate the structural robustness of the national pipeline network. Pipelines are grouped by System ID and Operator ID to capture variations across organizational and physical structures. The analysis reveals uneven patterns of network influence, where certain pipelines function as critical connectors or dominant hubs. Spatial mapping highlights geographic dependencies and potential chokepoints, offering a clear view of where targeted risk prevention measures would be most effective. The findings provide practical guidance for prioritizing maintenance, enhancing system robustness, and mitigating risks to ensure a stable and secure energy supply. Future research will expand the framework to incorporate dynamic operational data and real-time network behavior.

Peterson, Steven [ORNL] (ORCID:0000000287672998)↗

Dynamic Earth Energy Storage: Terawatt-year, Grid-scale Energy Storage Using Planet Earth as a Thermal Battery (GeoTES): Phase I Project (Final Report)

Grid-scale energy storage has been identified by the U.S. Department of Energy’s (DOE) Energy Storage Grand Challenge as a necessary technology to support the continued build-out of intermittent renewable energy resources required to attain a carbon-free energy future. To meet this goal, the 2018 Department of Energy Research and Innovation Act mandated the creation of a comprehensive program to accelerate the development and commercialization of next-generation energy storage technologies. One of numerous energy storage technology options is the storage of excess energy as heated geothermal brine in suitable geologic formations. This concept, known as reservoir thermal energy storage (RTES), geologic thermal energy storage (GeoTES), aquifer thermal energy storage (ATES), etc., relies on the storage of thermal energy in geologic formations for recovery and use in large-scale direct use geothermal (e.g., district heating, industrial processes, etc.) and electrical power generation applications. This thermal energy is derived from excess or waste heat from any high-temperature heat source, such as concentrated solar or from conventional thermal/nuclear generation. As such, RTES can potentially play a significant role in meeting the energy storage shortfall in the coming decades. RTES can provide energy arbitrage through both the storage and production of thermal energy stored in geologic formations for direct use applications and can serve as a source of hot fluids that can be used to generate electricity to support peak demand ramping, thus easing stress on transmission and distribution. This energy storage option has geographic benefits in that energy can be stored locally or regionally depending on the various needs/loads. RTES can also be located across an enormous geographic area, without the need for a traditional hydrothermal resource but where thermal gradients and hydrogeology allow economic exploitation of subsurface heat. The work conducted for this project includes (1) a review of lessons learned from past high-temperature RTES international projects; (2) geochemical experimental investigation and numerical simulations of potential domestic sedimentary reservoirs and (3) development of a thermo-hydrological-mechanical (THM) numerical simulation tool for optimizing formation properties and design parameters to maximize thermal energy storage performance.

15 GEOTHERMAL ENERGY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Smith-Putnam wind turbine experiment

A brief outline of the many problems encountered during testing of a wind turbine generator prototype unit is given. Its feasibility was demonstrated by the generation of electricity in commercial quantities with delivery to a utility transmission network. The experiment was terminated after blade failure occurred.

Smith, B. E.↗

Institutional and Policy Landscape for Solar-Plus-Storage Deployment by Electric Cooperatives

As co-location with battery storage has become a significant solar project-design trend across the United States, policies at all levels have started to adjust. Generally, these policies address battery storage development in major, urban markets, served by large investor-owned utilities (IOUs). Yet all kinds of utilities nationwide are seeking ways to tap into the fast-growing battery storage market, and they are all stakeholders in the federal, state, and local policies that impact the storage market's development. The electric cooperative sector, which includes some 830 distribution utilities and 63 generating and transmission (G&T) utilities across a mostly rural landscape, is no exception. It is impacted by federal, state, and local government policy requirements and incentives, as well as by policies that are controlled by the sector's own institutions. The objective of this paper is to identify and discuss the various policy and institutional factors that are relevant to the electric cooperative sector, and especially to local, distribution-level electric cooperatives (co-ops) that may be interested in procuring energy storage. Given this, the paper is largely written from the local co-op perspective. It also may be useful to wholesale G&T cooperatives. Other parties that may find the paper useful include storage developers, who are often unfamiliar with co-ops; local and state policymakers addressing policy options for this sector, and local renewable or storage stakeholders, who wish to understand the policy landscape affecting their local utility. Although co-op energy storage programs may tap customer-side batteries, this examination is focused on utility-side "front of the meter" projects and the policy issues they raise.

14 SOLAR ENERGY↗

Policy and Regulatory Environment for Utility-Scale Energy Storage: Bangladesh

Bangladesh has experienced significant economic growth and poverty reduction over the past several decades. Recognizing the central role electricity plays in economic development, the Government of Bangladesh (GOB) has established policies to accelerate the growth of the electric power sector. The Bangladesh power grid is transforming into one marked by declining reliance on domestic natural gas reserves and oil-based rental power plants, increasing renewable energy contribution, and shifting demand patterns. The GOB is now reconsidering its prior plans to increase the share of coal capacity in the generation mix to meet demand, shifting its focus instead to electricity imports from neighboring countries, nuclear generation, liquified natural gas imports, and domestic renewable resources such as wind and solar. However, investments in the transmission and distribution system, as well as ancillary services, have not kept pace with investments in generation resources over the past decade. Thus, Bangladesh electricity consumers still experience outages and poor power quality despite adequate installed capacity. On the demand side, population growth and industrialization have fueled steady growth in electricity consumption as efforts to expand access to electricity enabled near-universal electricity access by mid-2020. The combined changes in the mix of generation resources and patterns of electricity demand present new challenges and opportunities in operating and maintaining a reliable power system. Energy storage has the potential to help meet these challenges and accelerate Bangladesh’s energy transition. Declining costs for some energy storage technologies make them increasingly cost-effective solutions to provide a wide range of grid services. Previous analyses of energy storage in the region have identified several potential applications for storage at the bulk system level, including energy arbitrage, ancillary services, and transmission network support. The potential for storage to meet these needs depends on many factors, including physical characteristics of the power system and the policy and regulatory environments in which these energy storage assets would operate. This report applies an Energy Storage Readiness Assessment the National Renewable Energy Laboratory developed for policy makers and regulators to identify priority areas of focus as they continue to develop the appropriate suite of policies, programs, and regulations to enable storage deployment. This assessment uses a simple evaluation scheme to identify the barriers and opportunities for utility-scale energy storage within Bangladesh’s policy and regulatory environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Aquatic organism tracking devices, systems and associated methods

Aquatic organism tracking devices, systems and associated methods are described. According to one aspect, an aquatic organism tracking device includes a housing, a transducer coupled with the housing and configured to transmit a data transmission externally of the housing and an aquatic organism associated with the tracking device, a programmable oscillator coupled with the housing, and wherein the programmable oscillator is configured to generate a clock signal having a selected one of a plurality of different frequencies, processing circuitry coupled with the housing and configured to receive the clock signal from the programmable oscillator and to execute a plurality of executable instructions according to the clock signal, a power source coupled with the housing and configured to store electrical energy, and wherein the processing circuitry is configured to control the provision of the electrical energy from the power source to the transducer to generate the data transmission as a result of the execution of the instructions.

Deng, Z. Daniel↗

Spatial Interactions in Hydrogenated Perovskite Nickelate Synaptic Networks

A key aspect of how the brain learns and enables decision-making processes is through synaptic interactions. Electrical transmission and communication in a network of synapses are modulated by extracellular fields generated by ionic chemical gradients. Emulating such spatial interactions in synthetic networks can be of potential use for neuromorphic learning and the hardware implementation of artificial intelligence. Here, in this work, we demonstrate that in a network of hydrogen-doped perovskite nickelate devices, electric bias across a single junction can tune the coupling strength between the neighboring cells. Electrical transport measurements and spatially resolved diffraction and nanoprobe X-ray and scanning microwave impedance spectroscopic studies suggest that graded proton distribution in the inhomogeneous medium of hydrogen-doped nickelate film enables this behavior. We further demonstrate signal integration through the coupling of various junctions.

36 MATERIALS SCIENCE↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

A Geospatial Cost Comparison of CO2 Plume Geothermal (CPG) Power and Geologic CO2 Storage

CO 2 Plume Geothermal (CPG) power plants can use gigatonne-levels of CO 2 sequestration to generate electricity, but it is unknown if the resources that support low-cost CPG power align with the resources that support low-cost CO 2 sequestration. Here, we estimate and compare the geospatially-distributed cost of CPG and CO 2 storage across a portion of North America. We find that the locations with lowest-cost CO 2 storage are different than the locations with lowest-cost CPG. There are also locations with low-cost CO 2 storage (<$5/tCO 2 ) that do not support CPG power generation due to insufficient reservoir transmissivity or temperature. Thus, CPG development may require electricity prices that are greater than the levelized cost of electricity (LCOE) to offset the increased cost of sequestration. We introduce the “Additional Cost of Electricity (ACOE)” metric to account for this cost and add it to the LCOE to calculate breakeven electricity prices that are required for CPG development. We find that breakeven prices are lower when new CO 2 injection wells are drilled specifically for CPG (i.e., “greenfield” CPG development) compared to if only existing CO 2 sequestration injection wells are used (i.e., “brownfield” CPG development). This is because comparatively few wells are needed for sequestration-only, and the increased power capacity from having more CPG wells outweighs the increased costs from more drilling. We also find that sequestered CO 2 could be used to approximately triple the United States geothermal electricity power capacity via a single CPG “sweet spot” in South Dakota, but that breakeven electricity price for this development is on the order of $200/MW e h.

15 GEOTHERMAL ENERGY↗

Principles for Equitable Transmission Planning

Energy justice is gaining traction in the planning processes that govern the generation and supply of electric power in the U.S., with a growing number of federal and state authorities applying it as a framework to ensure that the benefits of a clean energy future extend to all levels of society. However, the principles of energy justice have not yet been integrated into electric transmission planning processes, which are designed to meet established reliability criteria and have not historically considered externalities like social inequities. This paper presents a review of transmission planning requirements in the U.S. and existing literature on energy justice, then synthesizes them to propose a framework for incorporating energy justice principles into transmission planning processes to yield more equitable outcomes. By applying procedural and recognition justice principles to create more extensive, inclusive, and diverse public participation in the planning process, planners can gain insight into—and begin to correct—the inequities created by previous planning decisions. Equipped with this understanding and informed by affected communities, planners can improve the distributional outcomes of the planning process and identify opportunities for energy system investments that will restore communities and place them on more equitable footing.

24 POWER TRANSMISSION AND DISTRIBUTION↗