Search NASA⌕ Search

SEARCH · Search NASA

Results for “Environmental Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Environmental Effects Assessment for Proposed Offshore Wind Farm off the Coast of Grays Harbor, Washington

Grays Harbor Wind LLC (GHW) is proposing to develop a floating offshore wind farm offshore of west Grays Harbor County, Washington (Grays Harbor). The proposed GHW Offshore Wind Project (Project) would entail construction, installation and operation of a 1,000-megawatt (MW) offshore wind farm consisting of approximately 75 floating units, each containing a floating foundation and wind turbine generator (WTG). The Project location is approximately 25 miles (21.7 nautical miles [nmi]) offshore west of Grays Harbor, at waters depths of 360 to 700 feet. The Pacific Northwest National Laboratory (PNNL) was contracted by Herrera Environmental Consultants, Inc. on behalf of GHW to carry out this preliminary scoping study to evaluate baseline conditions and potential effects on fish and marine mammals from development and operation of a floating offshore wind farm installed within a designated area off the coast of Washington1. Floating offshore wind units installed in an ocean environment as part of the Project would interact with marine wildlife. This Study report provides an initial data aggregation and analysis, using publicly available data, of the Project effects, both negative and positive, on the marine environment. The scope of this assessment is limited by the fact that the Project development is presently at the conceptual level. Data on marine organisms were aggregated and evaluated; however seabirds were evaluated by Herrera Environmental Consulting and, along with bats, were not included in the scope of this study. Significant additional work is necessary to characterize ocean, seafloor, and environmental conditions; select appropriate floating offshore wind technologies; identify construction methods and locations; and assess facility locations, including electrical interconnection. Data aggregation and analysis of seabirds and bats is also needed. Evaluation of the full range of potential environmental effects would be conducted following an award of a lease from the Bureau of Ocean Energy Management (BOEM) as part of the leasing, National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) environmental review and permitting processes. While this initial data aggregation and analysis uses best available public scientific information and current assumptions about the Project configuration, the effects discussed herein are based on the status of review to-date and may change as Project-specific details are developed.

17 WIND ENERGY↗

Environmental Benefits Assessment of the Traffic Aware Strategic Aircrew Requests Concept

Reduction of greenhouse gas emissions has been a focus area of the scientific community for the past several years. Specifically, the aviation industry has set goals to reduce greenhouse gas emissions, providing a sustainable transportation mechanism with minimal impacts on the environment. This reduction must be accomplished through several means, including advanced technology, sustainable propulsion, efficient air traffic management, and improved operations. A potential solution for improving operations in an efficient air traffic management system is the Traffic Aware Strategic Aircrew Requests (TASAR) concept. The TASAR concept applies onboard automation for the purpose of advising the pilot of route modifications that would be beneficial to the flight, leading to a decrease in direct operating costs through fuel burn reduction and shorter flight times. This report discusses analyses that provide an estimate of the potential environmental benefits that result from the application of the TASAR concept. The data used for this benefits assessment was gathered during an operational evaluation on revenue flights with an airline partner between July 2018 and April 2019. The analyses in this report determined that there are impactful potential environmental benefits to be realized using the TASAR concept.

TASAR, Digital TASAR, 4D TASAR, SATM, Green Aviati↗

Literature Review of Selected Publications Relevant to Carbon Dioxide Pipeline and Storage Systems

The annotated bibliographies provided in this document focus on identifying and reviewing environmental impact statements (EIS), environmental assessments (EA), and scientific literature relevant to aspects of CO 2 pipeline and storage construction and operation. The purpose of these summaries is to aid stakeholders responsible for the preparation of documents compliant with the National Environmental Policy Act (NEPA) requirements to have access to a quick and comprehensive guide of the literature that can inform their activities. They aim to inform the development of EISs and EAs by identifying potential environmental concerns and mitigation strategies. The annotated bibliographies captured in this document cover the general environmental assessment and impact topics relevant to CO 2 pipeline and storage construction and operation activities, with the subject of waste creation and handling being specifically pulled out into its own section. The reasoning behind a dedicated section for waste is that many EAs and EISs focus on the description of waste and its impacts, be it caused in routine operation or as a result of an accident.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 110B: US DOE High-Level Radioactive Waste (HLW) Interpretation

This panel focused on the US DOE High-Level radioactive Waste (HLW) definition interpretation. Discussion integrated topics such as the issuance of the HLW interpretation Federal Registration Notice, the status of the draft Environmental Assessment that analyzes the treatment and commercial disposal of up to 10,000-gallons of SRS Defense Waste Processing Facility recycle wastewater in South Carolina, and the path forward. Panelists with presentations: Status on the Environmental Assessment for the Commercial Disposal of Defense Waste Processing Facility Recycle Wastewater from SRS (Theresa Kliczewski); Enhancing Stakeholder Engagement on the HLW interpretation (Kara Colton, Rick McLeod); Technical Aspects of Potential Disposal of SRS DWPF Recycle Wastewater (Kent Rosenberger)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Benthic Habitat Monitoring Approach for Marine and Hydrokinetic Sites (Final Technical Report)

This final technical report summarizes the work completed as part of the Standardized and Cost-Effective Benthic Habitat Mapping and Monitoring Tools for MHK Environmental Assessments project funded by U.S. Department of Energy (DOE) under contract DE-EE007826 to Integral Consulting Inc. The overall goal of this project was to demonstrate a consistent, repeatable, and semi-automated seafloor and sediment mapping approach for rapidly characterizing benthic physical and biological/habitat conditions to support marine environmental assessments for marine and hydrokinetic energy sites. The approach evaluated combines sediment profile imaging and plan view (SPI/PV) technology with multibeam echosounder surveys as an effective and low-cost benthic habitat mapping protocol. A key innovation was the development of a semi-automated computer vision system that standardizes the extraction of data from the SPI/PV images. Other elements of the project were SPI camera hardware modifications, including the design and fabrication of a prototype “power” SPI camera to improve camera prism penetration in firm substrates, and outreach to agency regulators and other stakeholders on this habitat mapping approach. This technical report consists of five main subsections that summarize: 1) the benthic mapping approach; 2) benthic mapping results from the three areas’ surveys; 3) the development and performance of the image processing algorithms; 4) SPI camera hardware improvements and prototype testing; and 5) the regulatory outreach efforts.

16 TIDAL AND WAVE POWER↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Environmental Durability Assessment and Development of Subcomponent Test Methods for Advanced Materials in Marine Energy Applications

Marine energy developers are beginning to rely more heavily on advanced composite materials for their load-bearing structures. Understanding how these materials respond and degrade in harsh marine environments is a complex problem. Much research has been performed at smaller laboratory scales to understand the fundamental physical and chemical degradation mechanisms, but little structural testing research has been performed at larger scales to understand how these physical and chemical interactions scale and how they should be accounted for in the design process. The Advanced Materials project is a multilaboratory research collaboration that addresses these issues with the intention of reducing risks and barriers to marine energy developers wanting to adopt advanced composite materials. The National Laboratory of the Rockies has been playing a leading role in developing larger-scale testing infrastructure and test methods to validate complex numerical degradation models and standardize testing procedures to do so. This paper reviews past structural testing activities, how they have grown into current research activities, and how they will continue to evolve to directly address industry needs. This paper covers key research areas - large-scale water absorption and subsequent structural validation testing, qualification of bolted and adhesive connections, and combined submerged fatigue testing at increasing scales. It provides insights into the complex requirements for testing infrastructure and test method development to effectively qualify materials and certify marine energy structures for harsh marine environments. This research program paves the way for better guidance and standardization within the industry when adopting advanced composite materials.

16 TIDAL AND WAVE POWER↗

Environmental Durability Assessment and Development of Subcomponent Test Methods for Advanced Materials in Marine Energy Applications: Preprint

Marine energy developers are beginning to rely more heavily on advanced composite materials for their load bearing structures. Understanding how these materials respond and degrade in harsh marine environments is a complex problem. Much research has been performed at smaller laboratory scales to understand the fundamental physical and chemical degradation mechanisms, but little structural testing research has been performed at larger scales to understand how these physical and chemical interactions scale and how they should be accounted for in the design process. The Advanced Materials project is a multilaboratory research collaboration that has been addressing these issues with the intention of reducing risks and barriers to marine energy developers wanting to adopt advanced composite materials. The National Laboratory of the Rockies has been playing a leading role in developing larger scale testing infrastructure and test methods to validate complex numerical degradation models and standardize testing procedures to do so. This paper provides a review of past structural testing activities and how they have grown into current research activities and will continue to evolve into the future to directly address industry needs. This paper covers key research areas large-scale water absorption and subsequent structural validation testing, qualification of bolted and adhesive connections, and conducting combined submerged fatigue testing at increasing scales. This paper provides insights into the complex requirements for testing infrastructure and test method development to effectively qualify materials and certify marine energy structures for harsh marine environments. This research program paves the way for better guidance and standardization within the industry when adopting advanced composite materials.

16 TIDAL AND WAVE POWER↗

Quantitative assessment of environmental phenomena on maximum pit size predictions in marine environments

Maximum pit sizes were predicted for dilute and concentrated NaCl and MgCl 2 solutions as well as sea-salt brine solutions corresponding to 40% relative humidity (RH) (MgCl 2 -rich) and 76% RH (NaCl-rich) at 25 °C. A quantitative method was developed to capture the effects of various cathode evolution phenomena including precipitation and dehydration reactions. Additionally, the sensitivity of the model to input parameters was explored. Despite one's intuition, the highest chloride concentration (roughly 10.3 M Cl – ) did not produce the largest predicted pit size as the ohmic drop was more severe in concentrated MgCl 2 solutions. Therefore, the largest predicted pits were calculated for saturated NaCl (roughly 5 M Cl – ). Next, it was determined that pit size predictions are most sensitive to model input parameters for concentrated brines. However, when the effects of cathodic reactions on brine chemistry are considered, the sensitivity to input parameters is decreased. Although there was not one main input parameter that influenced pit size predictions, two main categories were identified. Under similar chloride concentrations (similar RH), the water layer thickness (WL), and pit stability product, (i · x) sf , are the most influential factors. When varying chloride concentrations (RH), changes in WL, the brine specific cathodic kinetics on the external surface (captured in the equivalent current density (i eq )), and conductivity (k o ) are the most influential parameters. Finally, it was noted that dehydration reactions coupled with precipitation in the cathode will have the largest effect on predicted pit size, and cause the most significant inhibition of corrosion damage.

54 ENVIRONMENTAL SCIENCES↗