Search NASA⌕ Search

SEARCH · Search NASA

Results for “Environmental cleanup”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Assessing Effects of Climate Change on Legacy Waste at the Enewetak Atoll

The Republic of the Marshall Islands (RMI) is in the central Pacific Ocean ~4,500 km west of Hawaii. The Enewetak Atoll, located in the northwest part of the RMI, was the site for 43 nuclear weapon tests between 1948 and 1958. Fallout and deposition from the tests contaminated the island surfaces, lagoon waters and sediment, and nearby ocean waters at the atoll. In the 1970s, a cleanup effort collected radioactive waste and placed it in the Cactus Crater on Runit Island (also called the Runit Dome). In December 2021, Congress directed the U.S. Department of Energy to study the impacts of climate change on the Runit Dome nuclear waste disposal site. Pacific Northwest National Laboratory (PNNL) assembled a multidisciplinary team of climate scientists, ocean modelers, environmental scientists, and health physicists to assess the likely effects of remaining radionuclides at the Enewetak Atoll. PNNL’s approach focused on effects of tropical cyclones that were postulated to mobilize and transport contaminated lagoon sediments and result in human and biota exposure. PNNL’s study estimated (1) the radionuclide source term, (2) the effects of climate change on severe storms, (3) mobilization and transport of radionuclides, and (4) radiation dose to humans and biota. Radionuclides in the lagoon and/or ocean waters of the Enewetak Atoll were characterized by the U.S. Atomic Energy Commission (AEC) in 1972, Woods Hole Oceanographic Institution in 2015, and Lawrence Livermore National Laboratory in 2018. The RMI Nationwide Radiological Study was conducted in the early 1990s for radionuclides remaining in island soils. The 1972 AEC survey remains the most comprehensive source of radionuclide data on lagoon sediments. Climate change modeling at a regional scale in the central Pacific Ocean is limited. PNNL climate scientists simulated severe historical storms postulated to occur both in a recent climate (2015) and in the future (2090) using the Advanced Research Weather Research and Forecasting (WRF-ARW) model, employing a pseudo-global-warming technique. A postulated complete, future failure of the Runit Dome was also considered. PNNL developed a high-resolution regional ocean hydrodynamics model covering the entire RMI extended economic zone using the Finite Volume Coastal Ocean Model (FVCOM). The FVCOM model was run using global reanalysis data for current climate and WRF-ARW simulation for the future climate. PNNL also developed a radionuclide fate and transport model using the FVCOM Integrated Compartment Model (FVCOM-ICM) to simulate the current and future mobilization and transport of radionuclides sorbed to lagoon sediments and the exchange of radionuclides between the water and sediment. FVCOM-ICM-predicted radionuclide concentrations were then used to estimate radiation dose to humans and biota at all islands of the Enewetak Atoll. Under current climate conditions, annual radiation exposures for the southern islands including Enewetak (Fred) and Medren (Elmer) were below the current U.S. standards. Radiation doses were somewhat elevated starting at Runit Island northward and westward to Enjebi Island (Janet). The islands in the northwest quadrant, particularly Bokoluo (Alice) and Bokombako (Belle), remain relatively contaminated. The islands in the southwestern quadrant have low contamination. The highest contribution to radiation doses comes from consumption of locally grown foods. Two radionuclides, 90Sr and 137Cs, contributed the greatest fraction for most terrestrial foods. In current climate conditions, the storms temporarily increased radionuclide concentrations in the lagoon waters, increasing the radiation dose slightly. In future conditions, doses are expected to be smaller, primarily because of the radioactive decay of the shorter-lived radioisotopes of 90Sr and 137Cs. This could make all islands in the far northwest of the atoll – except Bokombako (Belle) and perhaps Bokoluo (Alice) – suitable for residency. For the f

Prasad, Rajiv↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Recharge Sensitivity Case

The Plateau-to-River (P2R) model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in south-central Washington State. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe a recharge sensitivity case of the CA base case. The recharge sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium [H-3] and iodine-129 [I-129]), BC Cribs and Trenches model (for I-129 and technetium-99 [Tc-99]), or the Plutonium Uranium Extraction (PUREX) Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of fate and transport of contaminants reported in this case will support dose predictions as part of the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flexible Gasification of Coal and Biomass to Generate Carbon Free Electric Power and Hydrogen

This paper describes the development of a coal and biomass-fed plant concept to co-produce electric power and hydrogen with net-negative CO2 emissions under the aegis of the 21st Century Power Plant initiative of the U.S. Department of Energy (DOE), whose goal is to advance innovative power plant concepts that are capable of flexible, net-zero carbon emission operations while producing cost-effective “blue” hydrogen to support economy-wide decarbonization goals. The proposed standalone plant will be in Nebraska, USA. The specified design feedstock is a hybrid blend of Powder River Basin (PRB) subbituminous coal from Wyoming and local Nebraska biomass (corn stover), 50 wt.% each (dry basis). Other potential feedstocks, including woody biomass (eastern red cedar) and waste plastic (auto shredder residue) were evaluated or reviewed as alternates. The proposed process block comprises a high-pressure, oxygen-blown fluidized bed gasifier (GTI Energy U-GAS® process) coupled with water gas shift, the Selexol process for acid gas (H2S and CO2) removal, and pressure-swing adsorption (PSA) to yield 8,500 kg/h of high-purity hydrogen. The off gas from the PSA unit is used in the power block (gas turbine combined cycle) to generate electric power to support the gasification process, hydrogen production, and 50 MWe net electric power to the grid. All major plant equipment including the gasifier, gas cleanup system, and power generation are commercially available and proven in other applications and considered at TRL 8-9. However, gasification of corn stover biomass is considered at TRL 6. Overall thermal efficiency of the plant is 50% (net HHV) with net atmospheric CO2 removal at a rate of 250-300,000 tpa. Design activities necessary to provide input to a FEED study (Phase II of the project), including the development of the Environmental Information Volume (EIV) for the host site, and an investment case, based on a pro-forma pre-FEED level cost estimate, have been completed and are described in detail in this paper.

Gülen, S. Can↗

Pilot-Scale Modular Research Facility for Acidic Water Pollution Cleanup and Domestic Production of Critical Minerals for National Security

A recent study by Penn State researchers revealed that Pennsylvania AMD streams originate from abandoned mines, with coal refuse piles of the lower Kittanning coal seam containing the most valuable heavy rare earth elements. Penn State has developed a three-stage process to recover these critical minerals, tested it for proof of concept, and secured a patent. Funded by the US DOE, a modular pilot-scale research and development unit has been designed and built to process 1,000 gallons per day of AMD from a site managed by the Pennsylvania Department of Environmental Protection (PA DEP). The system will selectively recover iron, aluminum, rare earth elements, and cobalt-nickel-manganese concentrates from AMD, followed by a proprietary downstream purification process. These operations aim to produce concentrates of critical minerals while treating acid mine drainage to meet environmental standards and evaluate different feedstocks. This presentation will describe the design, operation, and innovations of the proposed process and pilot facility, emphasizing its role in promoting sustainable recovery of critical minerals from legacy waste streams.

Pisupati, Sarma V [Center for Critical Minerals, T↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Inventory Sensitivity Case

The Plateau to River (P2R) Model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in Washington State. The model simulates contaminants of concern within the saturated zone of the uppermost aquifer beneath the Central Plateau and downgradient to the Columbia River. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe an inventory sensitivity case of the CA base case. The inventory sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium (H-3) and iodine-129 (I-129)), BC Cribs and Trenches model (for I-129 and technetium-99 (Tc-99)), and the PUREX Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of F&T of contaminants reported in this case will support dose predictions as part of the Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Role of uncertainties in protecting ecological resources during remediation and restoration

Cleanup of contaminated waste sites is a National priority to protect human health and the environment, while restoring land to productive uses. While there are uncertainties with under standing risk to individuals from exposure, the aim of this study was to focus on uncertainties and complexities for ecological systems, complicated by hundreds of species occupying any remediation site which participate in multiple-interacting food webs. The ability to better predict the effectiveness of remediation in fostering future ecosystems might facilitate remedy selection and improve strategic environmental management. This investigation examined (1) uncertainties in ecosystem processes, (2) uncertainties in exposure from contamination before remediation, and (3) uncertainties during remediation. Two Department of Energy sites Hanford Site and Savannah River Site were used as case studies to illustrate how the uncertainties affect eco-receptors. Several types of ecological, physical, and human dimension uncertainties are defined. Ecological uncertainties include temporal, spatial, individual, developmental, and exogenous types. Physical uncertainties are weather-related, watershed variations, slope/aspect, soil/sediment structure and form, unforeseen events, and temporal patterns. Human dimension uncertainties include current land use, future land use, extractive and non-extractive recreation. The effects of remedial strategies varied between the two sites because Hanford is a primarily arid shrub-steppe ecotype, while Savannah River is a wet forest ecotype. Defining the associated ecological sensitivities and uncertainties and providing examples might help policy-makers, managers, planners, and contractors to be aware of issues to consider throughout planning, remediation, and restoration. Adding ecological uncertainty analysis to risk evaluations and remediation planning is analogous to using safety factors in human health risk assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of the Waste-to-Energy System Simulation (WESyS) Model

The leveraging of waste streams for energy and chemical production could add revenue to waste disposal operations, and it presents opportunities for addressing a variety of economic and environmental objectives at the local, state, and national levels. The Waste-to-Energy System Simulation (WESyS) model is a system dynamics model that was created to simulate the development of the U.S. waste-to-energy industry over time. For each of the three primary waste resources modeled (landfills, concentrated animal feeding operations, and publicly owned treatment works), WESyS simulates technically feasible scenarios for use of the waste, including direct conversion to fuels, and anaerobic digestion followed by flaring, electricity generation, combined heat and power, cleanup and compression to compressed natural gas, and cleanup and injection into an existing pipeline. The model allows users to explore numerous plausible future scenarios for the development of the U.S. waste-to-energy industry. This report provides an overview of the WESyS model and documents the key assumptions, equations, and data sources used to create the model.

09 BIOMASS FUELS↗

Low Count and Background Radionuclides Analysis - 20488

The US Department of Energy (DOE) is often faced with the need to evaluate radionuclides at low concentrations. When site sample data are likely to be close to threshold activity concentrations of interest, then the means by which the radiochemical analysis is performed and reported is critical. This situation can occur when differentiating from zero (presence/absence) for radionuclides that do not occur naturally, close comparison with environmental background for naturally occurring radionuclides, close comparison with a risk- or dose-based threshold concentrations of interest, or even comparisons across studies. There are several analytical issues that are of concern, but the two that appear to cause incorrect decisions to be made most often involve establishing detection limits and subtracting ambient background conditions in the laboratory. These issues are not critical when radionuclide activity concentrations are large relative to thresholds of concern, but they seem to be poorly understood when it matters. When the comparisons are important and are likely to be close to a threshold of interest, then the general contract with the analytical laboratories needs to be changed so that the right or appropriate data are obtained. The concern is that important decisions are made incorrectly more often as greater scrutiny is placed on DoE's radionuclide cleanup or monitoring decisions by the public and other stakeholders. Examples are presented of problems that have been observed for different projects, both within and outside the realm of DOE and NRC remediation and radioactive waste disposal problems, and solutions are offered that should lead to better data from which important decisions need to be made. The first example is from Los Alamos National Laboratory (LANL) and involves radionuclide concentrations in soil and rock beneath LANL's Material Disposal Area (MDA) G. An initial review of the data led to a conclusion that americium and plutonium are a long way present beneath MDA G. A more thorough review of the data that accounted properly for ambient background and the detection limits that had been established led to the opposite conclusion. Another example is from the Nevada National Security Site where tritium results from one of the wells were unexpectedly high. Proper understanding and analysis of ambient background led to the conclusion that the increased concentrations were not so obvious, and that a different contract with the analytical laboratory was needed to provide more appropriate data to support a better determination. Other examples are used from regulatory review of projects in Nevada, where background levels and secular equilibrium for naturally occurring radionuclides are not established correctly because of analytical issues. The same basic issues have also been found to create difficulties analyzing historical data from the West Valley Demonstration Project. There is evidence in the data that the apparent lack of secular equilibrium where it is expected to exist is related to ambient background subtraction or other analytical issues. A final example is presented for analysis of Tc-99 in samples of depleted uranium. In this case, two different studies that were performed only three months apart provide quite different results. The US Environmental Protection Agency (EPA) established the data quality objectives (DQO) process in the mid-1980's to establish decision performance criteria for data collection. EPA guidance (EPA G-4, for example) clearly distinguishes between DQOs and measurement performance objectives (MQOs) that should be addressed for laboratory analysis of samples. The language of DQOs and MQOs has become confused over time it seems, and the subsequent effects seem to include a lack of attention to decision performance and a routine approach to measurement quality. In order to better address radionuclide sample analysis when the concentrations are close to thresholds of concern, which might be zero for some radionuclides, background for others, and risk-based thresholds for yet others, it is important that routine laboratory analysis methods are adjusted, and that the project team and the laboratory work closely together to ensure that the data meets the MQO requirements of laboratory analysis and reporting of results, and that the MQOs effectively support project-specific DQOs. This basic approach will be applied in Los Alamos in the coming year to the collection of moisture data from underneath MDA T that will be analyzed for americium and neptunium isotopes. Proper understanding of the radiochemistry methods and reporting, and of appropriate statistical methods is critical to the success of such projects, ensuring that the right decisions are made. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

A single column separation method for barium isotope analysis of geologic and hydrologic materials with complex matrices

Abstract The increasing significance of barium (Ba) in environmental and geologic research in recent years has led to interest in the application of the Ba isotopic composition as a tracer for natural materials with complex matrices. Most Ba isotope measurement techniques require separation of Ba from the rest of sample prior to analysis. This paper presents a method using readily available materials and disposable columns that effectively separates Ba from a range of geologic and hydrologic materials, including carbonate minerals, silicate rocks, barite, river water, and fluids with high total dissolved solids and organic content such as oil and gas brines, rapidly and without need for an additional cleanup column. The technique involves off-the-shelf columns and cation exchange resin and a two-reagent elution that uses 2.5 N HCl followed by addition of 2.0 N HNO 3 . We present data to show that major matrix elements from almost any natural material are separated from Ba in a single column pass, and that the method also effectively reduces or eliminates isobaric interferences from lanthanum and cerium.

Matecha, R. M.↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap (Roadmap) presents a comprehensive, integrated assessment of the technology elements related to maintaining the River Protection Project baseline, reducing risk, and providing opportunity for improvement. These elements contribute to achieving successful completion of the Hanford Site tank waste cleanup mission. Key near-term U.S. Department of Energy (DOE), Office of River Protection (ORP) River Protection Project (RPP) mission needs with respect to the next 10 years are identified and prioritized. This Roadmap is used to assist with planning near-term scope to address technology development priorities in fiscal year 2021.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to ecological resources following remediation can be due mainly to increased resource value of successful restoration: A case study from the Department of Energy's Hanford Site

Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗