Search NASA⌕ Search

SEARCH · Search NASA

Results for “Expansion Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Towards a Workforce Roadmap for Distributed Wind: Phase 1 - Identifying Needs and Barriers

Despite recent policy, research efforts, and resources available for utility-scale and offshore wind workforce development, the distributed wind (DW) industry has yet to make similar advances to address its workforce challenges. This report initiates the phased development of a DW workforce roadmap to provide a foundation for roadmap development. Phase 1, contained in this report, uses desk-based research on clean energy workforce approaches and a DW interested-party survey to discuss needs and barriers hindering the workforce from expanding. Findings are summarized into goals and solutions for Phase 2 of roadmap development, which identifies actors responsible for implementing solutions identified in Phase 1. Phase 1 results suggest that the sector's small size and limited growth motivate the short-term need for skilled workers or candidates with well-rounded and multifaceted abilities. Long-term expansion plans must diversify positions while capitalizing on existing utility-scale wind and offshore workforce efforts, as well as other renewable sector best practices where possible. The findings in this report can advance workforce development in the DW sector by aligning interested industry parties around common goals to address challenges. Training providers, installers, operators, manufacturers, federal agencies, national laboratories, academic partners, and labor unions can utilize the findings to help promote sustainable growth of the DW sector.

17 WIND ENERGY↗

Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region

As electricity systems transition to higher levels of solar and wind generation, electric system operators will likely need to hold additional reserves to manage the forecast error associated with these resources. Because wind and solar forecast errors tend to be poorly correlated across space, system operators can reduce their reserve requirements by sharing reserves. This paper examines the value of forecast error reserve sharing among balancing areas in the Southeast United States. It finds that forecast error reserve requirements increase linearly with growth in solar and wind generation capacity but that reserve sharing can significantly reduce physical (MW) reserve requirements (from 25%-26% to 18%-19% of average load in high solar scenarios). It finds that the value of forecast error reserve sharing declines with higher levels of solar and wind generation, due to lower wholesale energy and reserve prices. Even with declines in wholesale prices, forecast error reserve sharing can still provide substantial value (as much as $\$$400 million per year in a high solar scenario), though with higher levels of solar, wind, and electricity storage, this value is increasingly tied to avoiding scarcity prices. The results suggest the importance of coordinated capacity expansion planning for forecast error reserve sharing.

14 SOLAR ENERGY↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Highlights of NASA/DOE photovoltaic market assessment visit to Morocco

A broad range of agricultural, rural development, and other power applications in various regions of Morocco were examined to determine the potential market for photovoltaic products in Moroccan development. The primary focus of the study was the agriculture sector which accounts for approximately 17% of the country's GNP. The country has a clear need for reliable remote power systems, but does not have the financial resources to invest in the relatively high capital cost PV equipment. A modest potential for PV use was identified in nonagricultural rural services, such as refrigerators for rural clinics and rural radio-telephones. The main potential for PV in Morocco in the next five years lies mainly in the telecommunications sector. Applications include rural TV sets, TV repeater stations, microwave relay stations, and railroad, marine, and airline signalling. Market size estimates were derived from development and expansion plans. At an average customer cost for complete installed systems from $18/Wp to $30/Wp the total potential market value is estimated in the range of $6.6 to $11 million over the 1981-1986 period.

Source record↗

Demographics of Investigators Involved in OSSA-Funded Research

The birth of the U.S. civil space program and the subsequent, dramatic growth in the ranks of the space science research population occurred in the 1950s and 1960s'. The large, post- Sputnik/ Apollo buildup in space program manpower is now approximately one career-lifetime in the past. It is therefore natural to anticipate that a large fraction of the space program engineers, scientists, and managers who pioneered the early exploration of space are approaching retirement. Such a "retirement wave" bodes both a loss of manpower and, more fundamentally, a loss of experience from the civil-space manpower base. Such losses could play a critical role constraining in NASA's ability to expand or maintain its technical capabilities. If this indeed applies to the NASA space science research population, then the potential for problems is exacerbated by the anticipated growth in flight rates, data volume, and data-set diversity which will accompany the planned expansion in the OSSA science effort during the 1990s and 2000s. The purpose of this study was to describe the OSSA PI/Co-I population and to determine the degree to which the OSSA space science investigator population faces a retirement wave, and to estimate the future population of PIs in the 1990-2010 era. To conduct such a study, we investigated the present demographics of the PI and Co-1 population contained in the NASA/OSSA Announcement of Opportunity (AO) mailing list. PIs represent the "leadership" class of the OSSA scientific researcher population, and Co-Is represent one important, oncoming component of the "replacement" generation. Using the PI population data, we then make projection estimates of the future PI population from 1991 through 2010, under various NASA growth/PI demand scenarios.

Stern, S. Alan↗

Abernathy's Lap

A lap in this instance is not a midriff but a tool for presision.polishing and grinding. During the Saturn V moonbooster program, Marshall Space Flight Center found a need for a better lap. The need arose from the exquisitely precise tolerances required for parts of the launch vehicle's guidance,and control system. So William J. Abernathy, a former Marshall employee, built a better lap; he invented a method for charging aluminum lap plates with diamond powder, then hard-anodizing them. The resulting lap produces a high polish on materials ranging from the softest aluminum to the hardest ceramics. It operates faster, wears longer and requires less reworking. Abernathy got NASA's permission to obtain a personal patent and he formed the one-man Abernathy Laps Co. in Huntsville, which produces a variety of laps. One of Abernathy's customers is Bell Aerospace Textron, Buffalo, which uses the laps to finish polish delicate instrument parts produced for NASA's Viking and other space programs. Says a Bell official: "Time needed (with the Abernathy lap) is a fraction of that required by conventional methods. The result is extremely accurate flatness and surface finish." Abernathy is providing laps for other manufacturing applications and for preparation of metallurgical specimens. The business is small but steady, and Abernathy plans expansion into other markets.

Source record↗

Real Time Safety Monitoring: Concept for Supporting Safe Flight Operations

A number of organizations are working on processes, procedures, regulations, and technologies to maintain or improve the safety of the National Airspace System (NAS). In this paper, we describe a Real Time Safety Monitoring (RTSM) system that benefits from these efforts to define a set of safety metrics that are automatically monitored in real-time. In addition to providing information about current potentially adverse conditions to a variety of users, from those who need a broad overview of a day's flight operations to those who need to decide on a control tactic to employ in the next five minutes, the RTSM system predicts conditions within a specified prediction horizon. Its intelligent interface alerts the user, presenting the information as appropriate considering the current context and circumstances. We illustrate the system concept with five conceptual use cases, describing which safety metrics may be of the most interest to five user groups and suggesting a multi-modal display format. We posit that having access to information about adverse conditions in time to make efficient preemptive decisions without sacrificing safety will improve the already high level of safety and aid in the expansion planned for the NAS under the Next Generation Air Transportation System (NextGen).

safety↗

Reducing Barriers in Space Weather Research and Operations with Next-Generation Simulation Services at the Community Coordinated Modeling Center (CCMC)

Space weather forecasting capabilities are becoming increasingly important to the health of advanced technological infrastructure. The Community Coordinated Modeling Center (CCMC, https://ccmc.gsfc.nasa.gov) serves as a key liaison in the US space weather program between the research and operations communities by providing a wide range of tools and capabilities that help to evaluate, compare, exercise, and archive the results of simulations of a growing list of space weather models. With its unique toolset, CCMC supports space weather research and model development that advances our understanding of space weather phenomena and improves forecasting skill, while also facilitating development of space weather applications and deployment of operational capabilities. Guided by experience from over 20 years of providing simulation services, feedback from its research, operational and educational users world-wide, recommendations from CCMC Advisory Group and Programmatic Review Panel, the CCMC has begun work on the next generation system for its simulation services and model output archives. The new system has been envisioned to employ state-of-the-art technologies and standards to provide a user-oriented experience while improving ease of access, transparency, interoperability with partner systems, and enhancing reliability by incorporating advanced automation for performance monitoring and intelligent failover. In the presentation, we will give an overview of the current CCMC ecosystem and discuss updates to some of the key services of the system, including Runs-on-Request, Instant Runs, and Continuous Runs. We will also describe how a planned expansion and standardization of data archival activities will enhance the role of CCMC as a world-class provider of heliophysics information for the research and analysis of space weather. It is our hope that this evolution of the services can further reduce the barriers and burdens on researchers, forecasters and decision makers who rely on CCMC for their daily research and operations.

Space Weather↗

Multi-scale Modeling Using IDAES

This presentation was delivered at the 2023 FECM / NETL Spring R&D Project Review Meeting. It demonstrated how the IDAES platform is enabling unique analyses across multiple scales. Focus areas included solid oxide fuel cell/solid oxide electrolysis cell-based integrated energy systems with the flexibility to produce both hydrogen and electricity as well as long term expansion planning of future decarbonized electricity grids.

Burgard, Anthony↗

STREAM: A technology planning and capacity expansion model for the industrial sector

The Strategic Technology Roadmapping and Energy, Environmental, and Economic Analysis Model—STREAM—is an optimization-based modeling tool and analysis framework to assist with strategic planning and technology investments of the industrial sector. This open-source framework is written in Julia using the JuMP package, which enables users to model future “pathways” for incumbent and future production technologies, costs, fuels and energy carriers, and energy and non-energy environmental impacts from industries as they transform in pursuit of a robust and competitive manufacturing sector. The model starts with an initial stock of industrial production technologies and assets at a facility level and then determines pathways that minimize cost, subject to an array of possible constraints on demand, market shares, environmental flows, and other exogenously specified operational considerations such as capacity utilization rates or regional energy costs. Key features of the framework include flexibility to model a wide range of industries and industrial technologies/processes at varying levels of granularity, ability to perform parametric sensitivity analyses, and ability to visualize model results using visualization objects.

capacity expansion↗

Power System Planning: Advancements in Capacity Expansion Modeling

This fact sheet focuses specifically on one element of the long-term planning process, the capacity expansion model. It highlights the key advances in these models to enable planning for systems with growing shared of renewable energy and storage.

capacity expansion model↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗

Loran-C expansion: Impact on precise time/time interval

On 16 May 1974, it was announced that Loran-C was chosen as the navigation system to serve the U. S. Coastal Confluence Zone. At the present time, reliable CONUS Loran-C groundwave timing coverage extends westward only about as far as Boulder, CO. The groundwave hyperbolic and timing coverage which will result from the planned CONUS expansion are illustrated. Time frames are provided. A status report on the planned reduction in Loran-C PTTI tolerances is presented.

Roeber, J. F., Jr.↗

Research Priorities and Opportunities in United States Wholesale Electricity Markets

The power system is currently undergoing a number of changes, including a rapidly evolving resource mix, growth of distributed energy resources (DERs), more active consumer participation, increased deployment of energy storage and hybrid resources, and more advanced communication and control requirements. These changes in the power system present numerous technical, economic, implementation, and policy challenges and research opportunities for power system operators. To help address these challenges, a collaboration among five research institutions—Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University—has been established to provide technical assistance to the seven U.S. Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs). The 3-year project aims to leverage the advanced methods, tools, datasets, and resources of the collaborators to provide robust analytical support to address the high-priority market challenges that will be faced in the 2- to 10-year time horizon.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy-Efficient and Resilient Infrastructure: Simulation, Validation, and Installation

Advanced, high-performance computing at the National Renewable Energy Laboratory (NREL) has enabled access to vast data resources with cutting-edge software techniques to understand, design, plan for, and maintain energy-efficient and resilient infrastructure. We have focused on cities and airports, but the technology we have developed will easily translate to seaports, inland ports, military installations, or other complex and large-scale energy-intensive systems. We can digitally simulate and explore current and future scenarios to make datadriven decisions for optimizing advanced energy systems, transportation and building operations, infrastructure planning and expansion, and battery storage to guide short- and long-term investments, electrification strategies, and integration of new technologies.

Athena↗

Learning from Arctic Microgrids: Cost and Resiliency Projections for Renewable Energy Expansion with Hydrogen and Battery Storage

Electricity in rural Alaska is provided by more than 200 standalone microgrid systems powered predominantly by diesel generators. Incorporating renewable energy generation and storage to these systems can reduce their reliance on costly imported fuel and improve sustainability; however, uncertainty remains about optimal grid architectures to minimize cost, including how and when to incorporate long-duration energy storage. This study implements a novel, multi-pronged approach to assess the techno-economic feasibility of future energy pathways in the community of Kotzebue, which has already successfully deployed solar photovoltaics, wind turbines, and battery storage systems. Using real community load, resource, and generation data, we develop a series of comparison models using the HOMER Pro software tool to evaluate microgrid architectures to meet over 90% of the annual community electricity demand with renewable generation, considering both battery and hydrogen energy storage. We find that near-term planned capacity expansions in the community could enable over 50% renewable generation and reduce the total cost of energy. Additional build-outs to reach 75% renewable generation are shown to be competitive with current costs, but further capacity expansion is not currently economical. We additionally include a cost sensitivity analysis and a storage capacity sizing assessment that suggest hydrogen storage may be economically viable if battery costs increase, but large-scale seasonal storage via hydrogen is currently unlikely to be cost-effective nor practical for the region considered. While these findings are based on data and community priorities in Kotzebue, we expect this approach to be relevant to many communities in the Arctic and Sub-Arctic regions working to improve energy reliability, sustainability, and security.

25 ENERGY STORAGE↗