Search NASA⌕ Search

SEARCH · Search NASA

Results for “FNAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Negative hydrogen ion sources for particle accelerators: Sustainability issues and recent improvements in long-term operations

High brightness, negative hydrogen ion sources are used extensively in scientific facilities operating worldwide. Negative hydrogen beams have become the preferred means of filling circular accelerators and storage rings as well as enabling efficient extraction from cyclotrons. Several well-known facilities now have considerable experience with operating a variety of sources such as RF-, filament-, magnetron- and Penning-type H- ion sources. These facilities include the US Spallation Neutron Source (SNS), Japan Proton Accelerator Research Complex (J-PARC), Rutherford Appleton Laboratory (RAL-ISIS), Los Alamos Neutron Science Center (LANSCE), Fermi National Accelerator Laboratory (FNAL), Brookhaven National Laboratory (BNL), numerous installations of D-Pace (licenced by TRIUMF) ion sources used mainly on cyclotrons and, most recently, the CERN-LINAC-1 injector. This report first summarizes the current performance of these ion sources in routine, daily operations with attention toward source service-periods and availability metrics. Sustainability issues encountered at each facility are also reported and categorized to identify areas of common concern and key issues. Recent ion source improvements to address these issues are also discussed as well as plans for meeting future facility upgrade requirements.

Welton, Robert F.↗

Field Quality Study of a 1-m-Long Single-Aperture 11-T Nb$_3$Sn Dipole Model for LHC Upgrades

FNAL and CERN are carrying out a joint R&D program with the goal of building a 5.5-m-long twin-aperture 11-T Nb_3Sn dipole prototype that is suitable for installation in the LHC. An important part of the program is the development and test of a series of short single-aperture and twin-aperture dipole models with a nominal field of 11 T at the LHC operation current of 11.85 kA and 20% margin. This paper presents the results of magnetic measurements of a 1-m-long single-aperture Nb_3Sn dipole model fabricated and tested recently at FNAL, including geometrical field harmonics and effects of coil magnetization and iron yoke saturation.

43 PARTICLE ACCELERATORS↗

Torus CLAS12-Superconducting Magnet Quench Analysis

The JLAB Torus magnet system consists of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration. These coils are wound with SSC-36 Nb-Ti superconductor and have the peak magnetic field of 3.6 T. The first coil manufacturing based on the JLAB design began at FNAL. The large magnet system dimensions (8 m diameter and 14 MJ of stored energy) dictate the need for quench protection. Each coil is placed in an aluminum case mounted inside a cryostat and cooled by 4.6 K supercritical helium gas flowing through a copper tube attached to the coil ID. The large coil dimensions and small cryostat thickness drove the design to challenging technical solutions, suggesting that Lorentz forces due to transport currents and eddy currents during quench and various failure scenarios are analyzed. The paper covers the magnet system quench analysis using the OPERA3d Quench code.

Kashikhin, V S↗

11 T Twin-Aperture Nb$_3$Sn Dipole Development for LHC Upgrades

FNAL and CERN are developing a twin-aperture 11 T Nb3Sn dipole suitable for installation in the LHC. This paper describes the design and parameters of the 11 T dipole developed at FNAL for the LHC upgrades in both single-aperture and twin-aperture configurations, and presents details of the constructed dipole models. Results of studies of magnet quench performance, quench protection and magnetic measurements performed using short 1 m long coils in the dipole mirror and single-aperture configurations are reported and discussed.

43 PARTICLE ACCELERATORS↗

Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC

The planned upgrade of the LHC collimation system includes additional collimators in the LHC lattice. The longitudinal space for the collimators could be obtained by replacing some LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. A joint development program with the goal of building a 5.5 m long two-in-one aperture Nb_3Sn dipole prototype suitable for installation in the LHC is being conducted by FNAL and CERN magnet groups. As part of the first phase of the program, 1 m long and 2 m long single aperture models are being built and tested, and the collared coils from these magnets will be assembled and tested in two-in-one configuration in both laboratories. In parallel with the short model magnet activities, the work has started on the production line in view of the scale-up to 5.5 m long prototype magnet. The development of the final cryo-assembly comprising two 5.5 m long 11 T dipole cold masses and the warm collimator in the middle, fully compatible with the LHC main systems and the existing machine interfaces, has also started at CERN. This paper summarizes the progress made at CERN and FNAL towards the construction of 5.5 m long 11 T Nb_3Sn dipole prototype and the present status of the activities related to the integration of the 11 T dipole and collimator in the LHC.

43 PARTICLE ACCELERATORS↗

Characterization of NbTi busbar for HL LHC Interaction Region Quadrupoles

The US Accelerator Upgrade for the HiLumi-LHC (US-HL-LHC AUP) project and CERN are designing and fabricating superconducting quadrupole magnets for the interaction regions of the High Luminosity Large Hadron Collider (HLLHC). The triplet is made of three optical elements: Q1, Q2, and Q3. The Nb3Sn quadrupole magnets operate in superfluid He at 1.9 K with a nominal field gradient of 132.6 T/m. The three inner triplet elements are connected together with superconducting buses. The design and fabrication of the through and local buses is carried out at Applied Physics and Superconducting Technology Division (APS-TD) at Fermilab (FNAL). This paper reports the characterization of the bus-bar thermoelectric properties. The bus was tested with a short Nb3Sn magnet (MQXFS1e) in the vertical test facility of the APS-TD at FNAL. The test demonstrated that the bus design is adequate since no spontaneous quench took place up to 17.87 kA current value. Quench propagation velocities were investigated over a range of currents that is typical for accelerator superconducting magnets. Temperature margins were found above that required for the Hi- Lumi triplet bus. The design guarantees the protection of the bus at operational current value according to the quench detection voltage threshold (100 mV) established for the Hi-Lumi LHC interaction region.

43 PARTICLE ACCELERATORS↗

Production of Copper-Plated Beamline Bellows and Spools for LCLS-II

The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are participating in this project. The 1.3-GHz cryomodules for this project consist of eight cavities separated by bellows (expansion joints) and spools (tube sections), which are copper plated for RF conduction. JLab is responsible for procurement of these bellows and spools, which are delivered to JLab and FNAL for assembly into cryomodules. Achieving accelerator-grade copper plating is always a challenge and requires careful specification of requirements and application of quality control processes. Due to the demanding technical requirements of this part, JLab implemented procurement strategies to make the process more efficient as well as provide process redundancy. This paper discusses the manufacturing challenges that were encountered and resolved, as well as the strategies that were employed to minimize the impact of any technical issues.

Wilson, Katherine M.↗

Update on Plasma Processing R&D for LCLS-II

SRF cavities performance preservation is crucial, from vertical test to accelerator operation. Field emission is still one of the main problems to overcome and plasma cleaning has been proven successful by SNS, in cleaning field emitters and increasing the work function of Nb. A collaboration has been established between FNAL, SLAC and ORNL with the purpose of applying plasma processing to LCLS-II cavities, in order to minimize and overcome field emission without affecting the high Q of N-doped cavities. The recipe will follow the neon-oxygen active plasma adopted at SNS, allowing in-situ processing of cavities and cryomodules from hydrocarbon contaminants. A novel method for plasma ignition has been developed at FNAL: a plasma glow discharge is ignited using high order modes to overcome limitations imposed by the fundamental power coupler. The results of experiments on 9-cell LCLS-II cavity are presented, along with plasma ignition studies. In addition the RF system is shown and N-doped Nb samples studies are discussed.

43 PARTICLE ACCELERATORS↗

Preliminary Cryogenic Cold Test Results of the First 9-Cell LSF Shape Cavity

Following successful prototyping and testing of single- & 5-cell LSF shape cavities *, **, the first 9-cell LSF shape cavity LSF9-1 was successfully constructed using an innovative process at JLab with the in-house facilities. The cavity was then shipped to KEK for post-fabrication mechanical adjustment and ILC TDR style treatment and surface processing. Cold testing was carried out at the JLab VTA facility, instrumented with a suite of Kyoto instruments. Favorable values for the bath pressure detuning sensitivity and Lorentz force detuning coefficient were experimentally measured, validating the design improvement in cell stiffeners. Pass-band measurements indicate 4 out of 9 cells reaching gradient capability of > 45 MV/m, including 2 cells reaching 51 MV/m. Cornell OST detectors identified the cell and location responsible for the current hard quench limit. Multipacting-like barriers observed in end cells are investigated both analytically and numerically. The cavity was shipped to FNAL and received a light EP at the joint ANL/FNAL facility for further cold testing at Jlab. Two new 9-cell LSF cavities are being constructed including one made of large-grain niobium material.

43 PARTICLE ACCELERATORS↗

LCLS-II CRYOMODULE TRANSPORT SYSTEM TESTING

The Cryomodules (CM) for the Linear Coherent Light Source II (LCLS-II) will be shipped to SLAC (Menlo Park, California) from JLab (Newport News, Virginia) and FNAL (Batavia, Illinois). A transportation system has been designed and built to safely transport the CMs over the road. It uses an array of helical isolator springs to attenuate shocks on the CM to below 1.5g in all directions. The system rides on trailers equipped with Air-Ride suspension, which attenuates vibration loads. The prototype LCLS-II CM (pCM) was driven 750 miles to test the transport system; shock loggers recorded the shock attenuation on the pCM and vacuum gauges were used to detect any compromises in beamline vacuum. Alignment measurements were taken before and after the trip to check whether cavity positions had shifted beyond the ± 0.2mm spec. Passband frequencies and cavity gradients were measured at 2K at the Cryomodule Test Facility (CMTF) at JLab to identify any degradation of CM performance after transportation. The transport system was found to have safely carried the CM and is cleared to begin shipments from JLab and FNAL to SLAC.

Huque, Naeem↗

Improvements to LCLS-II Cryomodule Transportation

The Linear Coherent Light Source (LCLS-II) is currently being constructed at the SLAC National Laboratory. A total of 35 cryomodules will be fabricated at Jefferson Lab (JLab) in Virginia and Fermi National Laboratory (FNAL) in Illinois and transported via road to SLAC. A shipping frame with an inner bed isolated by springs was designed to protect the CMs from shocks and vibrations during shipments. Successful road testing of the JLab prototype paved the way for production CM shipments. The initial production shipments lead to several catastrophic failures in beamline vacuum in the cryomodules. The failures were determined to be due to fatigue in Fundamental Power Coupler (FPC) bellows due to excessive motion during shipment. A series of instrumented CM shipping tests and component tests were undertaken to develop a solution. A modified spring layout was tested and implemented, which reduced shocks on the CMs. FPC coupler bellows restraints were tested on a shaker table and on a CM during shipping; they were able to reduce bellows motion by a factor of three. The updated shipping system is currently in use and has successfully delivered six cryomodules to SLAC from JLab and FNAL.

43 PARTICLE ACCELERATORS↗

Extra-Cold EP Process at Fermilab

FNAL has established a cold Electro-Polishing (EP) method which maintains the outer surface temperature of cavity cell around 12~15°C during EP process. Cold EP has been applied on the various SRF cavities and contributed to achieve high RF performances with them. To investigate more feasibility and capability of EP at lower temperature, the FNAL EP temperature control tool was recently improved. Extra-cold EP process below 0°C at cavity cell region was successfully performed on 1.3 GHz 1-cell cavity. A compatible RF performance with cold EP method was also demonstrated during the cavity vertical testing. The details of extra-cold EP process and the cavity test results will be presented.

43 PARTICLE ACCELERATORS↗

First N-Doping and Mid-T Baking of Medium-ß 644 MHz 5-Cell Elliptical Superconducting RF Cavities for Michigan State University’s Facility for Rare Isotope Beams

Two hadron linacs currently under development in the US, the PIP-II linac at Fermi National Accelerator Laboratory (FNAL) and the upgrade for Michigan State University’s Facility For Rare Isotope Beams (FRIB), will employ 650 and 644 MHz ß-0.6 elliptical superconducting cavities respectively to meet their design energy requirements. The desired CW operation modes of these two linacs sets Q-factor requirements well above any previously achieved for cavities at this operating frequency and velocity, driving the need to explore new high-Q treatments. The N-doping technique developed at FNAL and employed at an industrial scale to the LCLS-II cryomodules is a strong candidate for high-Q treatments, but work is needed to refine the treatment to the lower operating frequency and velocity regime. We present the first results of the first N-doping tests and a "mid-T" bake test in the FRIB 644 MHz 5-cell elliptical cavities.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

Low RF Power Plasma Ignition and Detection for In-Situ Cleaning of 1.3 GHz 9-Cell Cavities

Superconducting Radio Frequency (SRF) cavities performance preservation is crucial, from vertical test to accelerator operation. Field Emission (FE) is still one of the performance limiting factors to overcome and plasma cleaning has been proven successful by the Spallation Neutron Source (SNS), in cleaning field emitters and increasing the work function of Nb. A collaboration has been established between Fermi National Accelerator Laboratory (FNAL), SLAC National Accelerator Lab- oratory and Oak Ridge National Laboratory (ORNL) with the purpose of applying plasma processing to the Linac Coherent Light Source-II (LCLS-II) cavities, in order to minimize and overcome field emission without affecting the high Q of nitrogen-doped cavities. The cleaning for LCLS-II will follow the same plasma composition adopted at SNS, which allows in-situ processing of cavities installed in cryomod-ules from hydrocarbon contaminants. A novel method for plasma ignition has been developed at FNAL: a plasma glow discharge is ignited using high order modes to overcome limitations imposed by the fundamental power coupler, allowing in-situ cleaning for cavities in cryomodule. The plasma can be easily ignited and tuned in each of the cavity cells using low RF power. A method for plasma detection has been developed as well, which allows the detection of the plasma location in the cavity without the need of cameras at both cavity ends. The presented method can be applied to other multi-cell cavity designs, even for accelerators where the coupling for the fundamental modes at room temperature is very weak.

43 PARTICLE ACCELERATORS↗

The FIFE Project: Supporting Non-LHC Experiments at Fermilab [PowerPoint]

FabrIc for Frontier Experiments (FIFE) standardizes computing framework for non-LHC FNAL experiments and offers a robust, shared, and modular set of tools for experiments. The FIFE project provides a valuable service for FNAL non-LHC experiments and makes life much easier for those on multiple experiments. Plans include increasing containerization and transition to other. Following existing approaches saves time and effort and enables easy international cooperation. We are eagerly seeking common approaches as widely as possible in future projects (Rucio, HPC, IRIS_HEP, etc.).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development of High Performance Medium Velocity Superconducting Elliptical Cavities for Hadron Linacs

There is a solid scientific need for continuous wave (CW) proton or heavy ion linear accelerators (linacs) in the energy range up to about 1 GeV per nucleon (GeV/u). Only superconducting (SC) cavities can provide cost-efficient acceleration in CW mode. While low velocity, bc < 0.5 (b is the relative velocity of a charged particle and c is the speed of light), and high velocity, bc > 0.9, SC accelerating structures are established, there is a need in high-performance medium velocity SC accelerating structures. Currently, no superconducting (SC) CW proton or ion accelerators operate in the medium velocity range. We have developed a robust technology for producing high-performance medium-velocity elliptical cavities operating in the frequency range between 600 and 700 MHz. The project was performed in collaboration with Fermi and Argonne National Laboratories. The 5-cell, βopt = 0.65, 644 MHz elliptical cavities built at MSU have been used for this research. An advanced surface treatment method based on nitrogen doping to achieve a high-quality factor and a high accelerating gradient has been demonstrated. The surface treatment has been performed at ANL, and nitrogen doping at FNAL. A stable resonance control with the slow and fast tuner system has also been verified. FNAL developed a dedicated resonance control system for the stable operation of the combined tuner.

43 PARTICLE ACCELERATORS↗

US HL-LHC Accelerator Upgrade Project: MQXFA11 shipping incident report

The truck transporting the MQXFA11 magnet from LBNL to BNL was involved in an accident on 7/20/22. It was rear ended by another truck. Drivers were not injured. The main hit took place on the right back corner. The truck with the MQXFA11 magnet was towed to a tow yard in Rockdale, IL (~50 min drive from Fermilab). Subsequently, it was moved on another truck and moved to Fermilab. Fermilab employees added 3 accelerometers on the crate before it was moved on the new truck and attended all loading/unloading operations at the tow yard and at FNAL. The magnet arrived at FNAL on July 28 th . Upon arrival a visual inspection was performed. Accelerometers were removed and shock data were analyzed. Electrical checkout and a metrology survey were carried out. Strain data were also collected from the fiber optics installed on two coils and compared with data obtained before shipment. This report presents a summary of results. More pictures and details can be found at: https://indico.fnal.gov/event/55698/

43 PARTICLE ACCELERATORS↗