Search NASA⌕ Search

SEARCH · Search NASA

Results for “Feasibility Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A feasibility study of dynamic adaptive radiotherapy for nonsmall cell lung cancer

Purpose: The final state of the tumor at the end of a radiotherapy course is dependent on the doses given in each fraction during the treatment course. This study investigates the feasibility of using dynamic adaptive radiotherapy (DART) in treating lung cancers assuming CBCT is available to observe midtreatment tumor states. DART adapts treatment plans using a dynamic programming technique to consider the expected changes of the tumor in the optimization process. Methods: DART is constructed using a stochastic control formalism framework. It minimizes the total expected number of tumor cells at the end of a treatment course, which is equivalent to maximizing tumor control probability, subject to the uncertainty inherent in the tumor response. This formulation allows for nonstationary dose distributions as well as nonstationary fractional doses as needed to achieve a series of optimal plans that are conformal to the tumor over time, i.e., spatiotemporally optimal plans. Sixteen phantom cases with various sizes and locations of tumors and organs-at-risk (OAR) were generated using in-house software. Each case was planned with DART and conventional IMRT prescribing 60 Gy in 30 fractions. The observations of the change in the tumor volume over a treatment course were simulated using a two-level cell population model. Monte Carlo simulations of the treatment course for each case were run to account for uncertainty in the tumor response. The same OAR dose constraints were applied for both methods. The frequency of replanning was varied between 1, 2, 5 (weekly), and 29 times (daily). The final average tumor dose and OAR doses have been compared to quantify the potential dosimetric benefits of DART. Results: The average tumor max, min, mean, and D95 doses using DART relative to these using conventional IMRT were 124.0%–125.2%, 102.1%–114.7%, 113.7%–123.4%, and 102.0%–115.9% (range dependent on the frequency of replanning). The average relative maximum doses for the cord and esophagus, mean doses for the heart and lungs, and D05 for the unspecified tissue resulting 84%–102.4%, 99.8%–106.9%, 66.9%–85.6%, 58.2%–78.8%, and 85.2%–94.0%, respectively. Conclusions: It is feasible to apply DART to the treatment of NSCLC using CBCT to observe the midtreatment tumor state. Potential increases in the tumor dose and reductions in the OAR dose, particularly for parallel OARs with mean or dose–volume constraints, could be achieved using DART compared to nonadaptive IMRT.

60 APPLIED LIFE SCIENCES↗

Feasibility study for detection of fuel assemblies state inside sealed dry storage casks using external gamma flux measurements - 25445

The license for the storage of spent nuclear fuel assemblies in dry casks is limited to 40 years. In Germany, a site for a final repository of spent fuel is not yet available. Therefore, this license has to be renewed for prolonged storage period. Currently, there is no experience with dry cask storage worldwide that goes beyond a period of 40 years. Beside regulatory and security aspects, there are questions concerning the long-term integrity of the spent fuel assemblies as this is of relevance for final transportation and reloading to final waste repository casks. Once the cask is filled and sealed, the knowledge about the state of the fuel assemblies is limited. This study investigates the feasibility of using external gamma flux measurements to detect the state of the spent fuel assemblies inside the cask. Monte-Carlo simulations were performed to evaluate the gamma flux distribution outside the sidewall of a cask with all intact fuel assemblies and a cask with one damaged fuel assembly, mimicking a fuel assembly with expanded rods and fuel relocation. The evaluation was performed for different location of the damaged fuel assembly and different storage times. The results of the investigation showed that the intensity and the shape of the gamma flux outside the sidewall of the cask are sufficient to identify the damaged fuel assembly, in case it is located near the inner wall of the cask. The detection of the inner damaged fuel assemblies, however, is less feasible. Due to the self-shielding of the fuel assemblies, the gamma photons which come from the inner fuel assemblies stopped within the fuel basket and assemblies materials. The gamma photons which do survive the fuel assemblies self-shielding reach the inner cask wall with not enough energy to escape the shielding of the thick cast iron wall. In general, it can be concluded that the more the damaged fuel assembly is close to the cask inner walls and that the damage is in a large scale (i.e., significant fuel relocation), the more it can be detected by external gamma flux measurements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space station tracking requirements feasibility study, volume 2

The objective of this feasibility study is to determine analytically the accuracies of various sensors being considered as candidates for Space Station use. Specifically, the studies were performed whether or not the candidate sensors are capable of providing the required accuracy, or if alternate sensor approaches should be investigated. Other topics related to operation in the Space Station environment were considered as directed by NASA-JSC. The following topics are addressed: (1) Space Station GPS; (2) Space Station Radar; (3) Docking Sensors; (4) Space Station Link Analysis; (5) Antenna Switching, Power Control, and AGC Functions for Multiple Access; (6) Multichannel Modems; (7) FTS/EVA Emergency Shutdown; (8) Space Station Information Systems Coding; (9) Wanderer Study; and (10) Optical Communications System Analysis. Brief overviews of the abovementioned topics are given. Wherever applicable, the appropriate appendices provide detailed technical analysis. The report is presented in two volumes. This is Volume 2, containing Appendices K through U.

Udalov, Sergei↗

Space station tracking requirements feasibility study, volume 1

The objective of this feasibility study is to determine analytically the accuracies of various sensors being considered as candidates for Space Station use. Specifically, the studies were performed whether or not the candidate sensors are capable of providing the required accuracy, or if alternate sensor approaches be investigated. Other topics related to operation in the Space Station environment were considered as directed by NASA-JCS. The following topics are addressed: (1) Space Station GPS; (2) Space Station Radar; (3) Docking Sensors; (4) Space Station Link Analysis; (5) Antenna Switching, Power Control, and AGC Functions for Multiple Access; (6) Multichannel Modems; (7) FTS/EVA Emergency Shutdown; (8) Space Station Information Systems Coding; (9) Wanderer Study; and (10) Optical Communications System Analysis. Brief overviews of the abovementioned topics are given. Wherever applicable, the appropriate appendices provide detailed technical analysis. The report is presented in two volumes. This is Volume 1, containing the main body and Appendices A through J.

Udalov, Sergei↗

FEASIBILITY STUDY FOR THE DEVELOPMENT OF A TEST BED PROGRAM FOR NOVEL DETECTORS AND DETECTOR MATERIALS AT SRS H-CANYON SEPARATIONS FACILITY

Researchers at the Savannah River National Laboratory (SRNL) have proposed that a test bed for advanced detectors be established at the H-Canyon separations facility located on the DOE Savannah River Site. The purpose of the proposed test bed will be to demonstrate the capabilities of emerging technologies for national and international safeguards applications in an operational environment, and to assess the ability of proven technologies to fill any existing gaps. The need for such a test bed has been expressed in the National Nuclear Security Administration's (NNSA) Next Generation Safeguards Initiative (NGSI) program plan and would serve as a means to facilitate transfer of safeguards technologies from the laboratory to an operational environment. New detectors and detector materials open the possibility of operating in a more efficient and cost effective manner, thereby strengthening national and international safeguards objectives. In particular, such detectors could serve the DOE and IAEA in improving timeliness of detection, minimizing uncertainty and improving confidence in results. SRNL's concept for the H Canyon test bed program would eventually open the facility to other DOE National Laboratories and establish a program for testing national and international safeguards related equipment. The initial phase of the test bed program is to conduct a comprehensive feasibility study to determine the benefits and challenges associated with establishing such a test bed. The feasibility study will address issues related to the planning, execution, and operation of the test bed program. Results from the feasibility study will be summarized and discussed in this paper.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study Public Data

Data from award DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study performed by the Energy & Environmental Research Center including the following: - 2D Seismic {Input data, sgy files, maps, logs, and descriptors} - Core Petrophysics {Core analysis of plugs from the two stratigraphic test wells (Flemmer-1 [API 33-057-00039] and BNI-1 [API 33-065-00018])} - North Dakota Oil and Gas File No 37380 Files - North Dakota Oil and Gas File No 37672 Files - Well Testing Data {Summary of well testing methods and results from the stratigraphic test wells (Flemmer-1 and BNI-1)} Additional References: https://www.netl.doe.gov/sites/default/files/2017-12/Wesley-Peck-_Mastering-the-Subsurface_CarbonSAFE-Phase-II_August-2017-final.pdf Peck, W.D., Ayash, S.C., Klapperich, R.J., Gorecki, C.D. (2019) The North Dakota integrated carbon storage complex feasibility study, International Journal of Greenhouse Gas Control, Volume 84, 2019, Pages 47-53, https://doi.org/10.1016/j.ijggc.2019.03.001

Carbon Storage↗

A Summary of Two Recent UAS Command and Control (C2) Communications Feasibility Studies

In Spring of 2015, the NextGen Institute conducted two UAS C2 Communications Feasibility Studies on behalf of the FAA UAS Integration Office to develop two limited UAS C2 operational examples, each involving low-altitude BLOS (Beyond Line of Sight) Line of Communication (LOC) UAS applications, as part of assessing the myriad practical UAS C2 deployment challenges associated with these approaches. The studies investigated the feasibility of "Point-to-Point" (PTP) and "Network" approaches to UAS C2 to better understand potential user needs and to explore evolutionary paths to establishing a nation-wide system for delivering UAS C2 communications. This paper will summarize the solicitation, approach and results of the two studies teams led by Aviation Management Associates, Inc. and Exelis Inc.

Navigation↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Feasibility Study of a Satellite Solar Power Station

A feasibility study of a satellite solar power station (SSPS) was conducted to: (1) explore how an SSPS could be flown and controlled in orbit; (2) determine the techniques needed to avoid radio frequency interference (RFI); and (3) determine the key environmental, technological, and economic issues involved. Structural and dynamic analyses of the SSPS structure were performed, and deflections and internal member loads were determined. Desirable material characteristics were assessed and technology developments identified. Flight control performance of the SSPS baseline design was evaluated and parametric sizing studies were performed. The study of RFI avoidance techniques covered (1) optimization of the microwave transmission system; (2) device design and expected RFI; and (3) SSPS RFI effects. The identification of key issues involved (1) microwave generation, transmissions, and rectification and solar energy conversion; (2) environmental-ecological impact and biological effects; and (3) economic issues, i.e., costs and benefits associated with the SSPS. The feasibility of the SSPS based on the parameters of the study was established.

Glaser, P. E.↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Vincent Mullins Landfill in Tucson, Arizona

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vincent Mullins Landfill in Tucson, Arizona, for a feasibility study of renewable energy production. Under the RE-Powering America's Land initiative, the EPA provided funding to the National Renewable Energy Laboratory (NREL) to support the study. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this report is to assess the site for a possible PV installation and estimate the cost and performance of different PV configurations, as well as to recommend financing options that could assist in the implementation of a PV system. In addition to the Vincent Mullins site, four similar landfills in Tucson are included as part of this study. The feasibility of a PV system depends greatly on both site-specific and economic factors. Site specific factors include the available area for an array, solar resource, distance to transmission lines, and distance to major roads. In addition, the operating status, ground conditions, and restrictions associated with redevelopment of contaminated sites impact the feasibility of a PV system. Economic factors include purchase price of the electricity produced, power purchase agreement (PPA) price, and retail electric rates along with federal, state, and utility incentives for PV systems. Based on an assessment of these factors, the Vincent Mullins Landfill and other closed landfills in Tucson were found to be suitable sites for deployment of utility-scale PV systems. This study evaluated two development scenarios for implementing large-scale PV systems on Tucson’s landfills—one in which the city owns and operates the system, and one where a private entity is allowed to develop the site using a PPA. Table ES-1 summarizes the predicted economics of the two scenarios along with the system size, energy production, and cost.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Biomass Power Generation at the Former Farmland Industries Site in Lawrence, Kansas - A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

Under the RE-Powering America's Land initiative, the U.S. Environmental Protection Agency (EPA) provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of biomass renewable energy generation at the former Farmland Industries site in Lawrence, Kansas. Feasibility assessment team members conducted a site assessment to gather information integral to this feasibility study. Information such as biomass resources, transmission availability, on-site uses for heat and power, community acceptance, and ground conditions were considered.

09 BIOMASS FUELS↗

Future Circular Collider Feasibility Study Report

In response to the 2020 Update of the European Strategy for Particle Physics , the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme , which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase. The FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW pair production threshold, the ZH production peak, and the top/anti-top production threshold—each delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes between the Z, WW, and ZH substages remains flexible. The FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV—nearly an order of magnitude higher than the LHC—and is designed to deliver 5 to 10 times the integrated luminosity of the upcoming High-Luminosity LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, the FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes. This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.

Benedikt, M. [European Organization for Nuclear Re↗

A wire calorimeter for the SPIDER beam: Experimental tests and feasibility study

To study and optimize negative ion production and acceleration, in view of the use of neutral beam injectors in the ITER project, the SPIDER test facility (particle energy 100keV; beam current 50A, distributed over 1280 beamlets) is under construction in Padova, with the aim of testing beam characteristics and to verify the source proper operation, by means of several diagnostic systems. An array of tungsten wires, directly exposed to the beam and consequently heated to high temperature, is used in similar experiments at IPP-Garching to study the beam optics, which is one of the most important issues, in a qualitative way. The present contribution gives a description of an experimental investigation of the behavior of tungsten wires under high heat loads in vacuum. Samples of tungsten wires are heated by electrical currents and the emitted light is measured by a camera in the 400-1100nm wavelength range, which is proposed as a calibration tool. Simultaneously, the voltage applied to the wire is measured to study the dependency of emissivity on temperature. The feasibility study of a wire calorimeter for SPIDER is finally proposed; to this purpose, the expected behaviour of tungsten with the two-dimensional beam profile in SPIDER is numerically addressed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Feasibility Study of Economics and Performance of Solar PV at the Atlas Industrial Park in Duluth, Minnesota - A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America’s Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. The EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installation and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

To'Hajiilee Economic Development, Inc. (TEDI) Feasibility Study for Utility-Scale Solar

To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viability of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.

14 SOLAR ENERGY↗

Updated (BP3) Technical and Economic Feasibility Study - Electrochemical Membrane for Carbon Dioxide Capture and Power Generation

This topical report summarizes the results of an updated Technical & Economic Feasibility Study (T&EFS) which was conducted in Budget Period 3 of the project to evaluate the performance and cost of the Electrochemical Membrane (ECM)-based CO2 capture system. The ECM technology is derived from commercially available inorganic membranes; the same used in FuelCell Energy’s commercial fuel cell power plants and sold under the trade name Direct FuelCell® (DFC®). The ECM stacks are utilized in the Combined Electric Power (generation) And Carbon dioxide Separation (CEPACS) systems which can be deployed as add-ons to conventional power plants (Pulverized Coal, Combined Cycle, etc.) or industrial facilities to simultaneously produce power while capturing >90% of the CO2 from the flue gas. In this study, an ECM-based CEPACS plant was designed to capture and compress >90% of the CO2 (for sequestration or beneficial use) from the flue gas of a reference 550 MW (nominal, net AC) Pulverized Coal (PC) Rankine Cycle (Subcritical steam) power plant. ECM performance was updated based on bench scale ECM stack test results. The system process simulations were performed to generate the CEPACS plant performance estimates. The performance assessment included estimation of the parasitic power consumption for CO2 capture and compression, and the efficiency impact on the PC plant. While the ECM-based CEPACS system for the 550 MW PC plant captures 90% of CO2 from the flue gas, it generates additional (net AC) power after compensating for the auxiliary power requirements of CO2 capture and compression. An equipment list, ECM stacks packaging design, and CEPACS plant layout were developed to facilitate the economic analysis. Vendor quotes were also solicited. The economic feasibility study included estimation of CEPACS plant capital cost, cost of electricity (COE) analyses and estimation of cost per ton of CO2 captured. The incremental COE for the ECM-based CO2 capture is expected to meet U.S. DOE’s target of 35%. This study has indicated that CEPACS systems offer significant benefits with respect to cost, performance, water consumption and emissions to environment. The realization of these benefits will provide a single solution to carbon dioxide capture in addition to meeting the increasing demand for electricity.

20 FOSSIL-FUELED POWER PLANTS↗