Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fleet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Structural risk assessment and aircraft fleet maintenance

In the present analysis, deterministic flaw growth analysis is used to project the failure distributions from inspection data. Inspection data is reported for each critical point in the aircraft. The data will indicate either a crack of a specific size or no crack. The crack length may be either less than, equal to, or greater than critical size for that location. Non-critical length cracks are projected to failure using the crack growth characteristics for that location to find the life when it will be at critical length. Greater-than-critical length cracks are projected back to determine the life at failure, that is, when it was at critical length. The same process is used as in the case of a non-critical crack except that the projection goes the other direction. These points, along with the critical length cracks are used to determine the failure distribution. To be able to use data from different aircraft to build a common failure distribution, a consistent life variable must be used. Aircraft life varies with the severity of the usage; therefore the number of flight hours for a particular aircraft must be modified by its usage factor to obtain a normalized life which can be compared with that from other aircraft.

Smith, Herb, Jr.↗

Scheduling of an aircraft fleet

Scheduling is the task of assigning resources to operations. When the resources are mobile vehicles, they describe routes through the served stations. To emphasize such aspect, this problem is usually referred to as the routing problem. In particular, if vehicles are aircraft and stations are airports, the problem is known as aircraft routing. This paper describes the solution to such a problem developed in OMAR (Operative Management of Aircraft Routing), a system implemented by Bull HN for Alitalia. In our approach, aircraft routing is viewed as a Constraint Satisfaction Problem. The solving strategy combines network consistency and tree search techniques.

Paltrinieri, Massimo↗

The In-Orbit Performance of Batteries on the Skynet 4 Spacecraft Fleet: A NIckel-Cadmium Success Story

The SKYNET 4 constellation consists of three spacecraft which were launched between December 1988 and August 1990. The spacecraft are three-axis stabilized geostationary earth-orbiting military communications satellites with a design life of seven years on station. With the mission objective achieved all the batteries continue to give excellent performance. This paper presents a review of the history of the six batteries from cell procurement to the end of their design life and beyond. Differences in operational strategies are discussed and the lifetime trends in performance are analyzed. The combination of procurement acceptance criteria and the on-station battery management strategy utilized are presented as the prime factors in achieving completely successful battery performance throughout the mission.

Johnson, P. J.↗

Payload Flight Assignments: NASA Mixed Fleet

This manifest summarizes the missions planned by NASA for the Space Shuttle and Expendable Launch Vehicles (ELV's) as of the date of publication. Space Shuttle and ELV missions are shown through calendar year 2003. Space Shuttle missions for calendar years 2002-2003 are under review pending the resolution of details in the assembly sequence of the International Space Station (ISS).

Parker, Robert A. R.↗

Planning and Scheduling for Fleets of Earth Observing Satellites

We address the problem of scheduling observations for a collection of earth observing satellites. This scheduling task is a difficult optimization problem, potentially involving many satellites, hundreds of requests, constraints on when and how to service each request, and resources such as instruments, recording devices, transmitters, and ground stations. High-fidelity models are required to ensure the validity of schedules; at the same time, the size and complexity of the problem makes it unlikely that systematic optimization search methods will be able to solve them in a reasonable time. This paper presents a constraint-based approach to solving the Earth Observing Satellites (EOS) scheduling problem, and proposes a stochastic heuristic search method for solving it.

Frank, Jeremy↗

A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites

Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.

Globus, Al↗

Development of the Architectural Simulation Model for Future Launch Systems and its Application to an Existing Launch Fleet

A significant portion of lifecycle costs for launch vehicles are generated during the operations phase. Research indicates that operations costs can account for a large percentage of the total life-cycle costs of reusable space transportation systems. These costs are largely determined by decisions made early during conceptual design. Therefore, operational considerations are an important part of vehicle design and concept analysis process that needs to be modeled and studied early in the design phase. However, this is a difficult and challenging task due to uncertainties of operations definitions, the dynamic and combinatorial nature of the processes, and lack of analytical models and the scarcity of historical data during the conceptual design phase. Ultimately, NASA would like to know the best mix of launch vehicle concepts that would meet the missions launch dates at the minimum cost. To answer this question, we first need to develop a model to estimate the total cost, including the operational cost, to accomplish this set of missions. In this project, we have developed and implemented a discrete-event simulation model using ARENA (a simulation modeling environment) to determine this cost assessment. Discrete-event simulation is widely used in modeling complex systems, including transportation systems, due to its flexibility, and ability to capture the dynamics of the system. The simulation model accepts manifest inputs including the set of missions that need to be accomplished over a period of time, the clients (e.g., NASA or DoD) who wish to transport the payload to space, the payload weights, and their destinations (e.g., International Space Station, LEO, or GEO). A user of the simulation model can define an architecture of reusable or expendable launch vehicles to achieve these missions. Launch vehicles may belong to different families where each family may have it own set of resources, processing times, and cost factors. The goal is to capture the required resource levels of the major launch elements and their required facilities. The model s output can show whether or not a certain architecture of vehicles can meet the launch dates, and if not, how much the delay cost would be. It will also produce aggregate figures of missions cost based on element procurement cost, processing cost, cargo integration cost, delay cost, and mission support cost. One of the most useful features of this model is that it is stochastic where it accepts statistical distributions to represent the processing times mimicking the stochastic nature of real systems.

Rabadi, Ghaith↗

Continued Evaluation of Gear Condition Indicator Performance on Rotorcraft Fleet

This paper details analyses of condition indicator performance for the helicopter nose gearbox within the U.S. Army's Condition-Based Maintenance Program. Ten nose gearbox data sets underwent two specific analyses. A mean condition indicator level analysis was performed where condition indicator performance was based on a 'batting average' measured before and after part replacement. Two specific condition indicators, Diagnostic Algorithm 1 and Sideband Index, were found to perform well for the data sets studied. A condition indicator versus gear wear analysis was also performed, where gear wear photographs and descriptions from Army tear-down analyses were categorized based on ANSI/AGMA 1010-E95 standards. Seven nose gearbox data sets were analyzed and correlated with condition indicators Diagnostic Algorithm 1 and Sideband Index. Both were found to be most responsive to gear wear cases of micropitting and spalling. Input pinion nose gear box condition indicators were found to be more responsive to part replacement during overhaul than their corresponding output gear nose gear box condition indicators.

Delgado, Irebert R.↗

FLEET Velocimetry in the Common Research Model’s Wing Wake

Femtosecond laser electronic excitation tagging was used to make velocity measurements in the wake of the wing of the Common Research Model (CRM). Experiments were performed in the NASA Langley Research Center’s National Transonic Facility over a range of tunnel operating conditions. Pressures ranged from 205 to 411 kPa, temperatures from 278 to 323 K, and Mach from 0.1 to 0.9. Velocity was also determined over a range of model angles of attack. Time-averaged velocity results were obtained in both air and nitrogen, while single-shot velocity was obtained under certain tunnel operating conditions. Spatially-resolved, two dimensional, single component velocity measurements were achieved using a newly-developed laser scanning technique, which proved sufficiently sensitive to measure an approximately 5% velocity deficit in the wing wake region of the CRM.

Daniel T Reese↗