Search NASA⌕ Search

SEARCH · Search NASA

Results for “Front end”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

FELIX: a PCIe based high-throughput approach for interfacing front-end and trigger electronics in the ATLAS Upgrade framework

The ATLAS Phase-I upgrade (2019) requires a Trigger and Data Acquisition (TDAQ) system able to trigger and record data from up to three times the nominal LHC instantaneous luminosity. Furthermore, the Front-End LInk eXchange (FELIX) system provides an infrastructure to achieve this in a scalable, detector agnostic and easily upgradeable way. It is a PC-based gateway, interfacing custom radiation tolerant optical links from front-end electronics, via PCIe Gen3 cards, to a commodity switched Ethernet or InfiniBand network. FELIX enables reducing custom electronics in favour of software running on commercial servers. Here, the FELIX system, the design of the PCIe prototype card and the integration test results are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

Development and Demonstration of a Magnesium-Intensive Vehicle Front-End Substructure

This project is the final phase (designated Phase III) of an extensive, nine-year effort with the objectives of developing a knowledge base and enabling technologies for the design, fabrication and performance evaluation of magnesium-intensive automotive front-end substructures intended to partially or completely replace all-steel comparators, providing a weight savings approaching 50% of the baseline. Benefits of extensive vehicle weight reduction in terms of fuel economy increase, extended vehicle range, vehicle performance and commensurate reductions in greenhouse gas emissions are well known. An exemplary vehicle substructure considered by the project is illustrated in Figure 1, along with the exterior vehicle appearance. This unibody front-end “substructure” is one physical objective of the ultimate design and engineering aspects established at the outset of the larger collective effort.

33 ADVANCED PROPULSION SYSTEMS↗

Coupling Front-End Separations, Ion Mobility Spectrometry, and Mass Spectrometry For Enhanced Multidimensional Biological and Environmental Analyses

Ion mobility spectrometry (IMS) is a widely used analytical technique for rapid molecular separations in the gas phase. IMS alone is useful, but its coupling with mass spectrometry (MS) and front-end separations has been extremely beneficial for increasing measurement sensitivity, peak capacity of complex mixtures, and the scope of molecular information in biological and environmental sample analyses. Multiple studies in disease screening and environmental evaluations have even shown these IMS-based multidimensional separations extract information not possible with each technique individually. This review highlights 3-dimensional separations using IMS-MS in conjunction with a range of front-end techniques, such as gas chromatography (GC), supercritical fluid chromatography (SFC), liquid chromatography (LC), solid phase extractions (SPE), capillary electrophoresis (CE), field asymmetric ion mobility spectrometry (FAIMS), and microfluidic devices. The origination, current state, various applications, and future capabilities for these multidimensional approaches are described to provide insight into the utility and potential of each technique.

Environmental Molecular Sciences Laboratory↗

CW Room Temperature Re-buncher for the PIP-II Linac Front End

At Fermilab there is a plan for improvements to the Fermilab accelerator complex aimed at providing a beam power capability of at least 1 MW on target. The essential element of the plan (the Proton Improvement Plan II – PIP-II) is a new 800 MeV superconducting linac. The PIP-II linac includes a room temperature front-end and high energy part based on five types of superconducting cavities used to cover the entire velocity range required for beam acceleration. The room temperature front end is composed of an ion source, low energy beam transport line (LEBT), radio frequency quadrupole (RFQ), and a medium energy beam transport line (MEBT). The paper reports RF design of the re-buncher for MEBT along with thermal analysis of the cavity.

43 PARTICLE ACCELERATORS↗

Common front end systems for Space Shuttle and Space Station control centers at Johnson Space Center

In the beginning of the fiscal year 1992, the development organizations of Johnson Space Center (JSC) were poised to begin two major projects: the Space Station Control Center and the refurbishment of the telemetry processing area of the Space Shuttle Mission Control Center. A study team established that a common front end concept could be used and could reduce development costs for both projects. A standard processor was defined to support most of the front end functions of both control centers and supports a consolidation of control positions which effectively reduces operations cost. This paper defines that common concept and describes the progress that has been made in development of the Consolidated Communications Facility (CCF) during the past year.

Uljon, Linda↗

A Low-power CMOS Front End for Particle Detection Applications

A complete low-power front end integrates a charge sensitive amplifier with a novel adaptive biasing scheme which allows the DC bias currents to be scaled below conventional limits, with a peak detector circuit obtaining a peak value for each detection event which is then converted to digital via an 8 bit charge-redistribution successive approximation analog to digital converter. The ADC is shut off between detection events to reduce power consumption even more. The low power circuit consumes between 39muW and 400muW of power depending on the particle detection rate.

Schemm, Nathan↗

Warm Front End Upgrade for the PIP-II Linac

The warm front end for the PIP-II Linac consists of an Ion-source, an RFQ, and four buncher cavities. The LLRF systems for these were the first ones developed more than a decade ago for use at the test stands. Some were VXI crate based, and others used early generation FPGA boards that are light in resources. These LLRF systems and the one for the first superconducting cryomodule, the HWR will be upgraded with the ARRIA 10 SOC-FPGA chassis with EPICS interfaces like the rest of the PIP-II Linac. The RFQ and the HWR have unique resonance control systems which are integrated into the LLRF controller hardware. The results of the initial testing with a cavity emulator will be presented.

Reyes, Lennon [Fermilab] (ORCID:0009000891155652)↗

High speed front end of the multimegabit telemetry demodulator detector

The high speed front end (HSFE) portion of the Multimegabit Telemetry Demodulator-Detector is discussed. The HSFE accepts in-phase and quadrature analog signals from the input signal conditioner. It samples them with analog-to-digital converters at maximum rate of 64 megasamples per second. The samples are processed digitally and the integrals of I, Q, and of their crossproduct over one symbol period are supplied at symbol rate to the rest of the system.

Wechsler, E. R.↗

Status of the Warm Front End of PIP-II Injector Test

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H⁻ SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test is under construction. It includes a 10 mA DC, 30 keV H⁻ ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.

43 PARTICLE ACCELERATORS↗

Front-end Electronics for Unattended Measurement (FEUM). Results of Prototype Evaluation

The International Atomic Energy Agency (IAEA) deploys unattended monitoring systems to provide continuous monitoring of nuclear material within safeguarded facilities around the world. As the number of unattended monitoring instruments increases, the IAEA is challenged to become more efficient in the implementation of those systems. In 2010, the IAEA initiated the Front-End Electronics for Unattended Measurement (FEUM) project with the goals of greater flexibility in the interfaces to various sensors and data acquisition systems, and improved capabilities for remotely located sensors (e.g., where sensor and front-end electronics might be separated by tens of meters). In consultation with the IAEA, a technical evaluation of a candidate FEUM device produced by a commercial vendor has been performed. This evaluation assessed the device against the IAEA’s original technical specifications and a broad range of important parameters that include sensor types, cable lengths and types, industrial electromagnetic noise that can degrade signals from remotely located detectors, and high radiation fields. Testing data, interpretation, findings and recommendations are provided.

Conrad, Ryan C.↗

FRONT-END ELECTRONICS FOR UNATTENDED SAFEGUARDS SYSTEMS: TESTING OF A CANDIDATE DEVICE

The International Atomic Energy Agency (IAEA) deploys unattended monitoring systems to provide continuous monitoring of nuclear material within safeguarded facilities around the world. As the number of unattended monitoring instruments increases, the IAEA is challenged to become more efficient in the implementation of those systems. In 2010, the IAEA initiated the Front-End Electronics for Unattended Measurement (FEUM) project with the goals of greater flexibility in the interfaces to various sensors and data acquisition systems, and improved capabilities for remotely located sensors (e.g., where sensor and front-end electronics might be separated by tens of meters). In consultation with the IAEA, a technical evaluation of a candidate FEUM device produced by a commercial vendor is being performed. This evaluation is assessing the device against the IAEA’s original technical specifications and a broad range of important parameters that included sensor types, cable types, and industrial electromagnetic noise that can degrade signals from remotely located detectors. Testing has been performed in a laboratory and also in environments representative of IAEA deployments. The results are expected to inform the IAEA about where and how FEUM devices might be implemented in the field. Data and preliminary findings from the testing performed to date are presented.

Smith, Leon E.↗

Performance of a Front End prototype ASIC for picosecond precision time measurements with LGAD sensors

For the High-Luminosity phase of LHC, the ATLAS experiment is proposing the addition of a High Granularity Timing Detector (HGTD) in the forward region, to mitigate the effects of the increased pile-up. The chosen detection technology is Low Gain Avalanche Detector (LGAD) silicon sensors that can provide an excellent timing resolution below 50 ps. The front-end read-out ASIC must exploit the large signal derivative and small noise provided by the sensor, while keeping low power consumption. This paper presents the results on the first prototype of a front-end ASIC, named ALTIROC0, which contains the analog stages (preamplifier and discriminator) of the read-out chip. The ASIC was characterised both alone and as part of a module with a 2×2 LGAD array of 1.1×1.1 mm 2 pads bump-bonded to it. The various contributions of the electronics to the time resolution were investigated in test-bench measurements with a calibration setup. Both when the ASIC is alone or with a bump-bonded sensor, the jitter of the ASIC is better than 20 ps for an injected charge of 10 fC. The time walk effect, which arises from the different preamplifier response for various injected charges, can be corrected up to 10 ps using a Time Over Threshold measurement. The combined performance of the ASIC and the LGAD sensor, which was measured during a beam test campaign in October 2018 with pions of 120 GeV energy at the CERN SPS, is around 40 ps for all measured modules. All tested modules show good efficiency and time resolution uniformity.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Physics design of front ends for superconducting ion linacs

Superconducting (SC) technology is the only option for CW linacs and is also an attractive option for pulsed linacs. SC cavities are routinely used for proton and H{sup -} beam acceleration above 185 MeV. Successful development of SC cavities covering the lower velocity range (down to 0.03c) is a very strong basis for the application of SC structures in the front ends of high energy linacs. Lattice design and related high-intensity beam physics issues in a {approx}400 MeV linac that uses SC cavities will be presented in this talk. In particular, axially-symmetric focusing by SC solenoids provides strong control of beam space charge and a compact focusing lattice. As an example, we discuss the SC front end of the H{sup -} linac for the FNAL Proton Driver.

43 PARTICLE ACCELERATORS↗

Development of a Radiation-Tolerant Front End Digitizer

High-radiation and high-temperature environments represent notoriously detrimental conditions for electronics. Yet sensors and instrumentation are critically important for the safe operation of nuclear reactors and for the validity of the scientific experiments conducted within them. Traditionally, sensors in such extreme environments operate with few active components, resulting in small signals (mV–V, nA–µA range) that must be transmitted through long cable runs before digitization by sensitive data acquisition systems located in clean, less-harsh environments. Long cables are prone to picking up noise through electromagnetic interference and distortion caused by their parasitic impedances, resulting in signal degradation. The Front End Digitizer (FREND) system described and demonstrated herein seeks to address these issues by enabling the placement of a radiation-resistant analog front end within reactor containment, or other high-radiation environments. FREND will enable early signal pre-amplification, digitization, and optical encoding within the high-radiation field to transmit sensor signals over an optical fiber to the non-nuclear environment of an instrument room. Early signal pre-amplification and digitization maintain signal integrity, whereas optical transmission renders the system blind to induced electromagnetic noise over the long cable runs. This report describes the FREND initial prototype, which can multiplex and optically encode data from up to four sensor inputs, though, in principle, this can be extended to any number of sensor inputs. The end result is an extremely flexible, high-fidelity system.

42 ENGINEERING↗

Analysis and recombination of multiple-charge-state beams from an ECR ion source.

To meet the beam power requirements for high-intensity ion linacs being proposed for rare isotope beam production and other nuclear physics applications, we have developed an injector system to extract, accelerate, analyze, and recombine multiple charge states of any heavy-ion beam. The injector consists of an electron cyclotron resonance ion source, a 100 kV platform and an achromatic low-energy beam transport system. Two charge states of bismuth-209 (20+ and 21+) were successfully accelerated by the high-voltage platform potential, separated and perfectly recombined in the transverse phase space with 100% transmission. The perfect recombination and maximum transmission of the cw beam are essential for smooth injection into a subsequent rf accelerator.

43 PARTICLE ACCELERATORS↗