Search NASA⌕ Search

SEARCH · Search NASA

Results for “GROUND SUPPORT EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Landsat 9 Thermal Infrared Sensor 2 Pre-Launch Characterization: Initial Imaging & Spectral Performance Results

The Thermal Infrared Sensor-2 (TIRS-2) scheduled to launch in December 2020 aboard Landsat 9 will continue Landsat's four decade-long legacy of providing moderate resolution thermal imagery from low earth orbit (at 705 km) for environmental applications. Like the Thermal Infrared Sensor aboard Landsat 8, it is a pushbroom sensor with a cross-track field of view of 15 and provides two spectral channels at 10.8 and 12 um. To ensure radiometric, spatial, and spectral performance, a comprehensive pre-launch testing program is being conducted at NASA Goddard Space Flight Center at the component, subsystem, and instrument level. This effort will focus on the results from the subsystem level testing to assess TIRS-2 imaging performance including focus, spatial performance, and stray light rejection. It is also used to provide a preliminary assessment of spectral performance. The TIRS-2 subsystem is placed in a thermal vacuum chamber with the calibration ground support equipment, which provides a flexible blackbody illumination source and optics to assess imaging performance. Spectral performance is tested using a spectral response test setup with its own illumination source outside the chamber that propagates through the calibration ground support equipment in an optical configuration designed for this purpose. The results show that TIRS-2 performance is expected to meet all of its performance requirements with few waivers and deviations.

scatter↗

Creating the Required Deep Space Environments for Testing the James Webb Space Telescope (JWST) at NASA Johnson Space Center's Chamber A

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA was directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper will discuss the thermal vacuum test of the Optical Telescope Element (OTE) plus Integrated Science Instrument Module (ISIM) (OTIS) as well as the extensive series of tests that were performed to incrementally validate the operations and performance of the Chamber and Ground Support Equipment (GSE). Each test required a unique thermal vacuum profile for cool down and warm up, steady state operations, GSE testing and contamination control. Select results will be presented on Facility Functional Testing, Chamber Bake-out, GSE Cryo-Proof Testing, Chamber Commissioning, the Optical Ground Support Equipment (OGSE) Test series and the final thermal vacuum test of the OTIS with respect to facility operations to meet JWST program test requirements.

Francis, Andrew↗

Saturn V launch vehicle report.

Ground testing, development of engines, stages and ground support equipment of Saturn V launch vehicle

GROUND SUPPORT EQUIPMENT↗

Apollo 16 Mission Anomaly Report No. 1: Oxidizer Deservicing Tank Failure

The command module reaction control system is emptied of all remaining propellant using ground support equipment designed to provide an acid/base neutralization of the propellant in both the liquid and gaseous phases so that it may be disposed of safely. During the deactivation operation of the oxidizer from the Apollo 16 command module on 7 May 1972, the scrubber tank of the decontamination unit exploded, destroying the ground support equipment unit and damaging the building that housed the operation. Only minor injuries were received by the personnel in the area and the command module was not damaged. Test results show that the failure was caused by an insufficient quantity of neutralizer for the quantity of oxidizer. This insufficiency lead to exothermic nitration-type reactions which produced large quantities of gas at a very high rate and failed the decontamination tank.

Source record↗

Thermal Testing and Integration: Magnetospheric MultiScale (MMS) Observatories with Digital 1-Wire Sensors

Thermocouples require two thin wires to be routed out of the spacecraft to connect to the ground support equipment used to monitor and record the temperature data. This large number of wires that exit the observatory complicates integration and creates an undesirable heat path during testing. These wires exiting the spacecraft need to be characterized as a thermal short that will not exist during flight. To minimize complexity and reduce thermal variables from these ground support equipment (GSE) wires, MMS pursued a hybrid path for temperature monitoring, utilizing thermocouples and digital 1-wire temperature sensors. Digital 1-wire sensors can greatly reduce harness mass, length and complexity as they can be spliced together. For MMS, 350 digital 1-wire sensors were installed on the spacecraft with only 18 wires exiting as opposed to a potential 700 thermocouple wires. Digital 1-wire sensors had not been used in such a large scale at NASAGSFC prior to the MMS mission. During the MMS thermal vacuum testing a lessons learned matrix was formulated that will assist future integration of 1-wires into thermal testing and one day into flight.

Sensors↗

Defining Pupil Knowledge Requirements for Roman Space Telescope Integrated Payload Assembly Testing

This thesis examines the use of phase retrieval to characterize an optical system under testing conditions with pupil knowledge error. The purpose of this research is to define pupil knowledge requirements for the integrated payload testing of the Roman Space Telescope (RST). I have conducted a Monte Carlo study to determine how uncertainty in the location of the ground support equipment relative to the payload will affect the ability to use image-based wavefront sensing during the test to characterize system alignment. This test will be conducted in the Space Environment Simulator (SES) with the presence of Wavefront Error (WFE) due to gravity sag on the primary mirror. In this study, I incrementally decentered a piece of ground support equipment, the SubAperture Metrology System (SAMS), and evaluated how the phase retrieval algorithm attempted to fit the wavefront with the pupil mismatch. The results of this study are a factor in the overall Integrated Payload Assembly (IPA) testing WFE budget.

Roman Space Telescope↗

Defining Pupil Knowledge Requirements for Roman Space Telescope Integrated Payload Assembly Testing

This thesis examines the use of phase retrieval to characterize an optical system under testing conditions with pupil knowledge error. The purpose of this investigation is to define pupil knowledge requirements for the integrated payload testing of the Roman Space Telescope. We have conducted a Monte Carlo study to determine how location uncertainty of the ground support equipment relative to the payload caused by the temperature deformation in the Space Environment Simulator will affect our ability to use image-based wavefront sensing during the test to characterize system alignment. This test will be conducted with significant wavefront error (WFE) present due to gravity sag on the primary mirror. The study incrementally decenters two pieces of ground support equipment and evaluates how the phase retrieval algorithm attempts to fit the wavefront. We conducted this investigation in two steps. First, we used an ideal optical model of the test configuration without the gravity sag on the primary mirror to see the fitting effects related only to pupil knowledge error introduced by the decentering. Then, we used perturbed and gravity sag models to investigate the effects of decentering dependent wavefront effects in addition to pupil knowledge error. The results from the ideal model provided a clear limit of the amount of pupil knowledge error that can be present before seeing significant WFE in the phase retrieval. For the second study, we used the decentering tolerances from the ideal model results to determine the WFE effects of decentering in the presence of gravity sag and system misalignments. The second part of this study will be factored into the overall integrated payload assembly testing WFE budget.

Roman Space Telescope↗

Energetic particle flux experiment (IMP-F and G)

The technical aspects of the University of California IMP-F experiment aboard the Explorer-34 and the University of California IMP-G (S1) and (S2) experiments aboard the Explorer-41. The experiment detectors and electronics are discussed for each experiment as well as the fabrication, preflight and post-flight history. A description of the ground support equipment is also given for each experiment. These three experiments were essentially all different. The IMP-G experiment was essentially the IMP-F experiment with the addition of four Geiger-Mueller detectors. The IMP-G (S-2) was a supplementary experiment and differed completely from the IMP-F and IMP-G experiments. It was concluded that the ground support equipment approach used for the IMP-F and IMP-G experiments where emphasis was placed on a thorough exercise and monitoring of the experiment operation during various testing phases provided a high degree of confidence and reliability in these experiments. No known electronic failures have occurred during the spacecraft lifetime although some detector problems were experienced.

Anderson, K. A.↗

Strategies for Validation Testing of Ground Systems

In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)

Annis, Tammy↗

Low-cost TDRSS communications for NASA's long duration balloon project

A new transponder and RF ground support equipment for the NASA Tracking and Data Relay Satellite System (TDRSS) intended to support long duration scientific balloon flights in Antarctica are described. The new balloon class transponder features a highly integrated spread spectrum receiver design based on programmable charge coupled device (CCD) correlators and digital signal processing chips. The correlator chip is a Lincoln Labs 4ABC with four CCD channels. The balloon transponder is capable of reporting an estimate of its input bit error rate using digital signal processing. The TDRSS user RF test set is based on a set of RF ground support equipment capable of providing both the RF communications and direct control and monitoring necessary for transponder testing and a two-way RF link for preflight testing.

Israel, David J.↗

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

Shield to Pin Coupling of Lightning-Like Transients on Payload Umbilical Cables on a Launch Pad

In this paper we describe in-situ testing of a long payload umbilical, on a launch site, injected with “lightning- like” transients and describe resulting pin-to-pin voltages. Injections and voltage measurements near the ground support equipment room, as well as at a location near the payload junction box, are made. The umbilical cables tested include an outer over-braid and the inner conductor coupling is examined for open circuit, short-circuit and various loads representative of spacecraft input impedances. This testing is important because the Kennedy Space Center (KSC) where the lightning occurrence is the highest in the United States, is the primary launch site for Launch Services Program spacecraft customers. Lightning planning is essential but developing a lightning plan is often overlooked or not adequately analyzed leaving the spacecraft vulnerable to time delays or even damage when lightning occurs. At other popular launch sites like Vandenberg Air Force Base (VAFB) where lightning occurs less often, although at the same or greater intensity when it does occur, lightning planning is often completely ignored by the spacecraft. The two major questions to be addressed in the lightning plan are what retesting should be done to establish a “goodness” level and what is the trigger criteria for this testing? The spacecraft will typically use a standard spacecraft check-out procedure to address the necessary retesting, but determining the trigger criteria is often an issue. For instance, a spacecraft needs to understand what their immunity is to a certain lightning magnitude and location. Determining the amount of current that can be coupled onto a spacecraft umbilical can be calculated by using worst case assumptions or measured with current probes and current measurement devices. Spacecraft can also determine what pin-to-pin voltages they are sensitive to, however pin-to-pin voltage measurements are not typically taken during the strike due to the invasive nature of this measurement. In this paper, we present detailed data on the shield to pin voltage transfer functions to provide insight to the spacecraft developers for lightning retest criteria planning. The results from this unique testing opportunity provide essential details on specific coupling mechanisms affecting spacecraft hardware that interfaces with the ground support equipment. This missing link between cable shield currents and payload susceptibility voltages has been methodically tested and representative data presented.

Trout, Dawn↗

Quick-disconnect at countdown.

Umbilical carriers and quick-disconnect facilities of Saturn V ground support equipment noting location, ejecting methods, etc

UMBILICAL TOWER↗

The Development and Implementation of Ground Safety Requirements for Project Orion Abort Flight Testing - A Case Study

A rigorous set of detailed ground safety requirements is required to make sure that ground support equipment (GSE) and associated planned ground operations are conducted safely. Detailed ground safety requirements supplement the GSE requirements already called out in NASA-STD-5005. This paper will describe the initial genesis of these ground safety requirements, the establishment and approval process and finally the implementation process for Project Orion. The future of the requirements will also be described. Problems and issues encountered and overcame will be discussed.

Kirkpatrick, Paul D.↗