Search NASA⌕ Search

SEARCH · Search NASA

Results for “Galileo Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Ultraviolet Studies of Jupiter's Hydrocarbons and Aerosols from Galileo

This is the final report for this project. The purpose of this project was to support PI Wayne Pryor's effort to reduce and analyze Galileo UVS (Ultraviolet Spectrometer) data under the JSDAP program. The spectral observations made by the Galileo UVS were to be analyzed to determine mixing ratios for important hydrocarbon species (and aerosols) in Jupiter's stratosphere as a function of location on Jupiter. Much of this work is still ongoing. To date, we have concentrated on analyzing the variability of the auroral emissions rather than the absorption signatures of hydrocarbons, although we have done some work in this area with related HST-STIS data.

Gladstone, G. Randall↗

Maintaining outer space for peaceful purposes through international cooperation

NASA activities in support of international cooperation in space exploration and exploitation are briefly reviewed, with a focus on their compatibility with UN treaties. Particular attention is given to the provisions of the National Aeronautics and Space Act of 1958 and other applicable legislation, the over 1000 bilateral and international agreements NASA has entered into since 1958, international participation in currently ongoing NASA projects (Hubble Space Telescope, Galileo, Ulysses, Rosat, the D-2 Spacelab mission), and plans for the International Space Station.

Reese, George E.↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET)

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes > 3500 W/cm2 and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufacturing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured. The base 3D-woven material consists of a dual layer weave with a high-density outer layer to manage recession in the system and a lower density, lower thermal conductivity inner layer to manage the heat load. At the start of the project it was understood that due to weaving limitations the heat shield was going to be manufactured from a series of tiles. And it was recognized that the development of a seam solution that met the structural and thermal requirements of the system was going to be the most challenging aspect of the project. It was also recognized that the seam design would drive the final integration approach and therefore the integration of the ETU was kept in-house within NASA. A final seam concept has been successfully developed and implemented on the ETU. The structural testing and analysis covers from characterization of the different layers of the infused material as functions of weave direction and temperature to sub-component level testing such as 4pt bend testing at sub-ambient and elevated temperature and culminates in testing of the ETU results from which will validate the structural models developed using the element and sub-component level tests. Given the seam has to perform both structurally and aerothermally during entry a novel 4pt bend test fixture was developed allowing articles to be tested while the front surface is heated with a laser. These tests are being utilized to establish the systems structural capability during entry.A broad range of aerothermal tests (arcjet tests) were performed to develop material response models for predicting the required TPS thickness to meet a missions needs and to evaluate failure modes and establish the capability of the system. The final aspect of the project is to develop a comprehensive Design and Data Book such that a future mission will have the information necessary to adopt the technology. This presentation will provide an overview for each of these areas and argue that HEEET has successfully achieved TRL 6.

HEEET↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET)

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes > 3500 W/sq cm and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufacturing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured.

Thermal Protection System↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET) Project

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes up to 5000 watts per square centimeter and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufactruing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured. The base 3D-woven material consists of a dual layer weave with a high density outer layer to manage recession in the system and a lower density, lower thermal conductivity inner layer to manage the heat load. At the start of the project it was understood that due to weaving limitations the heat shield was going to be manufactured from a series of tiles. And it was recognized that the development of a seam solution that met the structural and thermal requirements of the system was going to be the most challenging aspect of the project. It was also recognized that the seam design would drive the final integration approach and therefore the integration of the ETU was kept in-house within NASA. A final seam concept has been successfully developed and implemented on the ETU and will be discussed. The structural testing and analysis covers from characterization of the different layers of the infused material as functions of weave direction and temperature, to sub-component level testing such as 4-pt bend testing at sub-ambient and elevated temperature. ETU test results are used to validate the structural models developed using the element and sub-component level tests. Given the seam has to perform both structurally and aerothermally during entry a novel 4-pt bend test fixture was developed allowing articles to be tested while the front surface is heated with a laser. These tests are intended to establish the system's structural capability during entry. A broad range of aerothermal tests (arcjet tests) are being performed to develop material response models for predicting the required TPS thickness to meet a mission's needs and to evaluate failure modes. These tests establish the capability of the system and assure robustness of the system during entry. The final aspect of the project is to develop a comprehensive Design and Data Book such that a future mission will have the information necessary to adopt the technology. This presentation will provide an overview and status of the project and describe the status of the tehnology maturation level for the inner and outer planet as well as earth entry sample return missions.

Ellerby, Don↗

Recent Progress at the International Laser Ranging Service (ILRS)

The International Laser Ranging Service (ILRS) is experiencing significant growth. New stations are being built and brought into operation, expanding the spatial and temporal coverage of the Satellite Laser Ranging (SLR) observations. Some of these stations are multi-technique Core Sites that allow us to exploit the combined strengths of different geodetic space techniques. New satellites are strengthening the ILRS contribution to the International Terrestrial Reference Frame (ITRF), and expanding the spectrum of satellite applications supported by the ILRS. New analysis, modeling, and data processing techniques continue to improve the science products. New campaigns are continuing to expand SLR applications into relativity and the study of non-gravitational forces. The ILRS is currently participating in the Galileo for Science campaign (G4S_2.0 project), funded by the Italian Space Agency (ASI), which aims to perform a set of measurements in the field of gravitation with the Galileo satellites, taking advantage of the accuracy of the on-board atomic clocks and, in particular, of GSAT0201and GSAT0202 by exploiting their relatively high eccentricity (~0.16). New activities underway in Lunar Laser Ranging (LLR), with the imminent launch and deployment of the upcoming Next Generation Lunar Retroreflector - 1 (NGLR-1) to the lunar surface. Some new satellites supported by the ILRS are now exploring means of capturing Space Debris, while some ILRS stations run local laser ranging projects to track space debris, contributing to the maintenance of various data catalogs. Time transfer experiments are also expanding the application of laser ranging, linking two fully characterized optical clocks at different locations with SLR (Einstein Synchronization) providing measurements of height differences, demonstrating the feasibility of a physical height system. Two-way and one-way transponders activity has been underway since the LASSO experiment in the 1990’s. More experiments are underway or planned. Applications include time and frequency transfer and clock synchronization between ground and space, interplanetary laser ranging, and fundamental physics. This presentation will give an update on ILRS activities and the impact that these activities have had and will have on ILRS data products.

Lunar Laser Ranging↗

More About The Enhanced Projection-And-Assembly Method

Report discusses enhanced projection-and-assembly (EP&A) method and its application to Galileo spacecraft. EP&A method and its predecessor, projection-and-assembly (P&A) method, described in "Enhanced Method of Reduction of Mathematical Models" (NPO-18402), and "Two-Stage Reduction of Dynamical Models" (NPO-18723).

Lee, Allen Y.↗

Galileo to Jupiter: Probing the Planet and Mapping Its Moons

The first project to use the space shuttle as an interplanetary launch vehicle, the Galileo mission is designed to obtain information about the origin and evolution of the solar system by studying large-scale phenomena on Jupiter and its satellites. Aimed towards Mars to obtain gravity assist, the orbiting spacecraft will deploy a probe, which penetrating the Jovian atmosphere, will transmit data for approximately an hour. The spacecraft itself will inspect the atmospheres, ionospheres, and surfaces of Ganymede, Io, Europa, and Callisto, as well as determine their magnetic and gravitational properties. The experiments to be conducted and their scientific objectives are described. Known facts about the Jovian system are reviewed.

Source record↗

Acoustic environments for JPL shuttle payloads based on early flight data

Shuttle payload acoustic environmental predictions for the Jet Propulsion Laboratory's Galileo and Wide Field/Planetary Camera projects have been developed from STS-2 and STS-3 flight data. This evaluation of actual STS flight data resulted in reduced predicted environments for the JPL shuttle payloads. Shuttle payload mean acoustic levels were enveloped. Uncertainty factors were added to the mean envelope to provide confidence in the predicted environment.

Oconnell, M. R.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A summary final report of work accomplished is presented. Work was performed in the following areas: (1) Galileo Probe science analysis, (2) Galileo probe Atmosphere Structure Instrument, (3) Mars Pathfinder Atmosphere Structure/Meteorology instrument, (4) Mars Pathfinder data analysis, (5) Science Definition for future Mars missions, (6) Viking Lander data analysis, (7) winds in Mars atmosphere Venus atmospheric dynamics, (8) Pioneer Venus Probe data analysis, (9) Pioneer Venus anomaly analysis, (10) Discovery Venus Probe Titan probe instrument design, and (11) laboratory studies of Titan probe impact phenomena. The work has resulted in more than 10 articles published in archive journals, 2 encyclopedia articles, and many working papers. This final report is organized around the four planets on which there was activity, Jupiter, Mars, Venus, and Titan, with a closing section on Miscellaneous Activities. A major objective was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo probe, and to receive, analyze and interpret data received from the spacecraft. The instrument was launched on April 14, 1989. Calibration data were taken for all experiment sensors. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature and acceleration sensors, and the supporting engineering temperature sensors. Computer programs were written to decode the Experiment Data Record and convert the digital numbers to physical quantities, i.e., temperatures, pressures, and accelerations. The project office agreed to obtain telemetry of checkout data from the probe. Work to extend programs written for use on the Pioneer Venus project included: (1) massive heat shield ablation leading to important mass loss during entry; and (2) rapid planet rotation, which introduced terms of motion not needed on Venus. When the Galileo Probe encountered Jupiter, analysis and interpretation of data commenced. The early contributions of the experiment were to define (1) the basic structure of the deep atmosphere, (2) the stability of the atmosphere, (3) the upper atmospheric profiles of density, pressure, and temperature. The next major task in the Galileo Probe project was to refine, verify and extend the analysis of the data. It was the verified, and corrected data, which indicated a dry abiabatic atmosphere within measurement accuracy. Temperature in the thermosphere was measured at 900 K. Participation in the Mars atmospheric research included: (1) work as a team member of the Mars Atmosphere Working Group, (2) contribution to the Mars Exobiology Instrument workshop, (3) asssistance in planning the Mars global network and (4) assitance in planning the Soviet-French Mars mission in 1994. This included a return to the Viking Lander parachute data to refine and improve the definition of winds between 1.5 and 4 kilometer altitude at the two entry sites. The variability of the structure of Mars atmosphere was addressed, which is known to vary with season, latitude, hemisphere and dust loading of the atmosphere. This led to work on the Pathfinder project. The probe had a deployable meteorology mast that had three temperature sensors, and a wind sensor at the tip of the mast. Work on the Titan atmospheric probe was also accomplished. This included developing an experiment proposal to the European Space Agency (ESA), which was not selected. However, as an advisor in the design and preparation of the selected experiment the researcher interacted with scientist on the Huygens Probe Atmosphere Structure Experiment. The researcher also participated in the planning for the Venus Chemical Probe. The science objectives of the probe were to resolve unanswered questions concerning the minor species chemistry of Venus' atmosphere that control cloud formation, greenhouse effectiveness, and the thermal structure. The researcher also reviewed problems with the Pioneer Venus Probe, that caused anomalies which occurred on the Probes at and below 12.5 km level of the Venus' atmosphere. He convened and participated in a workshop that concluded the most likely hardware cause was insulation failure in the electrical harness outside the Probes' pressure vessels. It was discovered that the shrink tubing material failed at 600K. This failure could explain the anomalies experienced by the probes. The descent data of the Pioneer probes, and the Soviet Vega Lander was analyzed to evaluate the presence of small scale gravity waves in and below the Venus cloud layer.

Lester, Peter↗

Deep space mission integration with the space transportation system

The Galileo mission is the first interplanetary mission scheduled to use the Space Transportation System (STS). Therefore, Galileo is the trailblazer for mission integration of a deep space mission with the STS. A short overview of the Galileo mission is presented as background for the discussion of the mission integration effort. The components of the STS and the mission integration system are defined, documentation requirements explained, the work of the Flight Design Working Group described, and several examples of the types of problems dealt with are given. The steps of mission integration are shown from introducing requirements into the system to resolving conflicts that arise between the payload project and the STS operator. Conclusions are drawn from the Galileo mission integration effort to aid future payload projects in working with the STS.

Gray, W. B.↗

Composition and evolution of the atmosphere of Venus

The contract year started by analyzing Jovian atmospheric data acquired by the Galileo Probe Mass Spectrometer (GPMS). Two Venus hydrogen projects got underway as well. The first study strives to understand how to reconcile the standard treatment of the evolution of the H2O and HDO resevoirs on Venus over 4.5 Gyr in the presence of H and D escape and injection by comets. The second study is calculating the charge exchange contribution to hydrogen loss rates, using realistic models for exospheric H, H(+), D, D(+), and ion temperature from PV data. This report includes the following papers as attachments and supporting data: 'The Galileo Probe Mass Spectrometer: Composition of Jupiter's Atmosphere'; 'Chemical Composition Measurements of the Atmosphere of Jupiter with the Galileo Probe Mass Spectrometer'; 'Ion/Neutral Escape of Hydrogen and Deuterium: Evolution of Water'; 'Hydrogen and Deuterium in the Thermosphere of Venus: Solar Cycle Variations and Escape'; and 'Solar Cycle Variations in H(+) and D(+) Densities in the Venus Ionosphere: Implications for Escape'.

Donahue, Thomas↗

Issues in NASA program and project management

This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

Hoffman, Edward J.↗

Experimental program for real gas flow code validation at NASA Ames Research Center

The experimental program for validating real gas hypersonic flow codes at NASA Ames is described. Ground based test facilities used include ballistic ranges, shock tubes and shock tunnels, arcjet facilities and heated air hypersonic wind tunnels. Also included are large scale computer systems for kinetic theory simulations and benchmark code solutions. Flight tests consist of the Aeroassist Flight Experiment, the Space Shuttle, Project Fire 2, and planetary probes such as Galileo, Pioneer Venus and PAET.

Deiwert, George S.↗

Experimental program for real gas flow code validation at NASA Ames Research Center

The experimental program for validating real gas hypersonic flow codes at NASA Ames Rsearch Center is described. Ground-based test facilities used include ballistic ranges, shock tubes and shock tunnels, arc jet facilities and heated-air hypersonic wind tunnels. Also included are large-scale computer systems for kinetic theory simulations and benchmark code solutions. Flight tests consist of the Aeroassist Flight Experiment, the Space Shuttle, Project Fire 2, and planetary probes such as Galileo, Pioneer Venus, and PAET.

Deiwert, George S.↗

Mariner 2 and beyond - Planetary exploration's first 25 years

Mariner explorations of Venus and Mars are briefly described. Consideration is then given to the missions of Viking 1 and 2, Pioneer 10 and 11, Voyager 1 and 2, and Pioneer Venus. Projected future missions are also briefly considered, including Magellan, Galileo, and Ulysses.

O'Donnell, Franklin↗

UV Studies of Jupiter's Aerosols and Hydrocarbons

This project funded research related to our involvement in the Galileo Ultraviolet Spectrometer experiment. Pryor was a Co-I on that experiment, which recently ended when Galileo crashed into Jupiter's atmosphere. It also funded related research on HST observations of Jupiter's atmosphere, and Cassini observations of Jupiter's atmosphere, and ground-based studies of Jupiter's atmosphere using the facilities of McDonald Observatory. Specific activities related to this grant include study of UV spectra returned by Galileo UVS and Cassini UVIS, development of simple models to explain these spectra, participation in archiving activities for these data sets, travel to conferences, and publication of scientific papers. Highlights of our Jupiter research efforts include: 1.) evidence for heavy hydrocarbons in Jupiter's atmosphere (from HST) (Clarke et al. poster), that may be the source of Jupiter's stratospheric aerosols, 2.) detection of auroral flares in Jupiter's atmosphere from Galileo (Pryor et al., 2001). 3.) establishing a connection between coronal mass ejections and auroral outbursts (Gurnett et al., 2002), and 4) establishing a connection between short-term variations in Jupiter's auroral emissions and radio emissions (Pryor et al. presented at AGU in 2002, paper in preparation).

Pryor, Wayne↗

The 1986 launch of the Galileo spacecraft via the Space Transportation System

Beginning with the Galileo spacecraft launch, deep space payloads will be launched via the Space Shuttle. This change from the previous use of expendable launch vehicles will introduce large changes in procedures and data flow configurations for both the flight project and the Deep Space Network during the launch period. The planned Galileo launch period sequence of events and telemetry and command data flow configurations are described.

Berman, A. L.↗