At least 109 records · Page 6

A Testing Framework for Grid-Forming Resources

This paper presents a testing framework for grid-forming (GFM) resources. First, it analytically derives in the frequency domain the active and reactive power response of an ideal voltage source with a reactor. These transfer functions are then used to quantify the voltage source behavior expected from a GFM inverter within subtransient timescales (5-15 cycles) following a grid disturbance. The paper also shows that the testing of a GFM inverter might require a reactor of an appropriate size between the inverter and the grid simulator used for the inverter testing. Finally, the paper presents a systematic approach for developing specifications for GFM resources using active and reactive power response frequency scans. The testing framework and results presented in this paper are demonstrated using EMT-PSCAD simulations of a 1-MW GFM inverter.

frequency scans↗

A Testing Framework for Grid-Forming Resources: Preprint

This paper presents a testing framework for grid-forming (GFM) resources. It first analytically derives in frequency domain the active and reactive power response of an ideal voltage source with a reactor. These transfer functions are then used to quantify the voltage source behavior expected from a GFM inverter within subtransient time scales (5-10 cycles) following a grid disturbance. The paper also shows that the testing of a GFM inverter might require a reactor of an appropriate size between the inverter and the grid simulator used for the inverter testing. Finally, the paper presents a systematic approach for developing specifications for GFM resources using active and reactive power response frequency scans. The testing framework and results presented in this paper are demonstrated using EMT simulations of a 1-MW GFM inverter.

frequency scans↗

Assessment of the Phase-to-Ground Fault Apparent Admittance Method with Phase/Ground Boundaries to Detect Types of Electrical Faults for Protective Relays Using Signature Library and Simulated Events

Protective relays in electric power grids recognize the types of electrical faults in a few seconds. The most common detection method to detect the types of electrical faults is based on measuring the angle between the zero and negative sequence currents. However, it is not completely accurate because the phase-to-phase-ground and phase-to-ground electrical faults could have the same detection conditions. Therefore, engineers need to plot the events after an electrical fault to observe the nature of the incidents in detail. In this study, the phase-to-ground fault apparent (PGFA) admittance method with phase/ground boundaries identified the types of electrical faults located in distribution power lines and feeders. This method was based on measuring the PGFA admittance magnitudes for the faulted and nonfaulted phases, resulting in greater than zero and near zero, respectively. The PGFA admittance algorithm was built with MATLAB/Simulink software and tested with signature library and grid simulation events. The PGFA method with phase/ground boundaries was evaluated with the confusion matrix. The measured and predicted values matched in more than 90% of the tests, and the PGFA admittance method with phase/ground boundaries presented an accuracy of 94.3% and a precision of 100%.

42 ENGINEERING↗

Assessment of the Phase-to-Ground Fault Apparent Admittance Method with Phase/Ground Boundaries to Detect Types of Electrical Faults for Protective Relays Using Signature Library and Simulated Events

Protective relays in electric power grids recognize the types of electrical faults in a few seconds. The most common detection method to detect the types of electrical faults is based on measuring the angle between the zero and negative sequence currents. However, it is not completely accurate because the phase to phase ground and phase to ground electrical faults could have the same detection conditions. Therefore, engineers need to plot the events after an electrical fault to observe the nature of the incidents in detail. In this study, the phase to ground fault apparent (PGFA) admittance method with phase/ground boundaries identified the types of electrical faults located in distribution power lines and feeders. This method was based on measuring the PGFA admittance magnitudes for the faulted and non-faulted phases, resulting in greater than zero and near zero, respectively. The PGFA admittance algorithm was built with MATLAB/ Simulink software and tested with signature library and grid simulation events. The PGFA method with phase/ground boundaries was evaluated with the confusion matrix. The measured and predicted values matched in more than 90% of the tests, and the PGFA admittance method with phase/ground boundaries presented an accuracy of 94.3% and a precision of 100%.

Piesciorovsky, Emilio↗

Practical Start-Up Process of Multiple Grid-Tied Voltage-Sourced Inverters in Laboratory

Starting up inverter-based resources (IBRs) and integrating them into a grid are important in real-world engineering and there are many challenges to be tackled. Using a laboratory-scale hardware test bed (50 Watt and 20 V), this paper demonstrates the challenges and provides a practical start-up process that can smoothly energize two grid-tied voltage-sourced inverters (VSI) and synchronize the VSIs into a 60-Hz grid. The hardware test bed consists of two SiC VSIs and a 45-kW Chroma grid simulator to act as the grid. The inverter controls are implemented in OPAL-RT OP5600, which has the measurements sensed, control algorithms processed, and gate signals generated and sent to the VSI switches. This research focuses on examining how to energize VSIs and how to synchronize the VSIs into the grid. The best energizing approach is summarized based on comparison and analysis of the experiment results. The presented approach can prevent large transients during the start-up process.

Wang, Zhengyu↗

Model based co-simulation platform for integrated building system control and design optimization

Both steady-state and dynamic simulations have been widely used by HVAC&R industry to support product/equipment development for decades. Steady-state simulation focuses on the system mass, energy and momentum balance of an equilibrium state. It is based on high-fidelity components models, and thus is suitable for system and component design optimization. Dynamic simulation studies the system transient response and is generally used for controls development and verification. It usually does not require rigorous component models of high accuracy because 1) the commonly used PID control is feedback control whose control performance evaluation doesn’t require high fidelity system/plant model; 2) high-fidelity dynamic model significantly increases the number of equations and variables and creates tremendous challenge for math solver. For supervisory control, transactive control or optimization of an integrated building system, the HVAC&R equipment is often one of the sub-components to be controlled. High-fidelity equipment models are required for accurately evaluating control strategies. In addition, building equipment manufacturers have developed a lot of high-fidelity steady-state equipment/component models per their expertise. Thus, a platform that can integrate OEM high-fidelity steady-state model with dynamic building simulation and/or electric power system & grid simulation to support the development and verification of supervisory control for integrated building systems is necessary. In this study, ORNL’s heat pump design tool (HPDM) is utilized to develop a co-simulation platform for supervisory control and optimization in integrated building systems. It is based on a model that integrates high-fidelity steady-state simulation equipment models with dynamic building simulation. A practical case of using the proposed co-simulation platform to develop and evaluate the supervisory control and optimization is presented and discussed.

Sun, Jian↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL CGI and PHIL Platform for Validation of Multi-Technology Energy Systems at Scale

The presentation is an update on National Renewable Energy Laboratory Flatirons Campus' capabilities around multi-megawatt grid simulation and power hardware-in-the-loop. Recent improvements in operational and dynamic range of existing 7MVA Controllable Grid Interface (CGI) are described together with improvements in site-wide automation and data acquisition systems. In later part of presentation, a second 19.9MVA CGI that is currently under development is introduced. Its features are described further explaining future site's capabilities.

acquisition↗

Techniques and resources for storm-scale numerical weather prediction

The topics discussed include the following: multiscale application of the 5th-generation PSU/NCAR mesoscale model, the coupling of nonhydrostatic atmospheric and hydrostatic ocean models for air-sea interaction studies; a numerical simulation of cloud formation over complex topography; adaptive grid simulations of convection; an unstructured grid, nonhydrostatic meso/cloud scale model; efficient mesoscale modeling for multiple scales using variable resolution; initialization of cloud-scale models with Doppler radar data; and making effective use of future computing architectures, networks, and visualization software.

Droegemeier, Kelvin↗

A Run-Time Verification Framework for Smart Grid Applications Implemented on Simulation Frameworks

Smart grid applications are implemented and tested with simulation frameworks as the developers usually do not have access to large sensor networks to be used as a test bed. The developers are forced to map the implementation onto these frameworks which results in a deviation between the architecture and the code. On its turn this deviation makes it hard to verify behavioral constraints that are de- scribed at the architectural level. We have developed the ConArch toolset to support the automated verification of architecture-level behavioral constraints. A key feature of ConArch is programmable mapping for architecture to the implementation. Here, developers implement queries to identify the points in the target program that correspond to architectural interactions. ConArch generates run- time observers that monitor the flow of execution between these points and verifies whether this flow conforms to the behavioral constraints. We illustrate how the programmable mappings can be exploited for verifying behavioral constraints of a smart grid appli- cation that is implemented with two simulation frameworks.

Architecture baed testing↗

Power Hardware-in-the-Loop (PHIL) Testing Facility for Distributed Energy Storage (Poster)

The growing deployment of distributed, variable generation and evolving end-user load profiles presents a unique set of challenges to grid operators responsible for providing reliable and high quality electrical service. Mass deployment of distributed energy storage systems (DESS) has the potential to solve many of the associated integration issues while offering reliability and energy security benefits other solutions cannot. However, tools to develop, optimize, and validate DESS control strategies and hardware are in short supply. To fill this gap, NREL has constructed a power hardware-in-the-loop (PHIL) test facility that connects DESS, grid simulator, and load bank hardware to a distribution feeder simulation.

25 ENERGY STORAGE↗

How well do terrestrial biosphere models simulate coarse-scale runoff in the contiguous United States?

Significant changes in the water cycle are expected under current global environmental change. Robust assessment of present-day water cycle dynamics at continental to global scales is confounded by shortcomings in the observed record. Modeled assessments also yield conflicting results which are linked to differences in model structure and simulation protocol. Here we compare simulated gridded (1 spatial resolution) runoff from six terrestrial biosphere models (TBMs), seven reanalysis products, and one gridded surface station product in the contiguous United States (CONUS) from 2001 to 2005. We evaluate the consistency of these 14 estimates with stream gauge data, both as depleted flow and corrected for net withdrawals (2005 only), at the CONUS and water resource region scale, as well as examining similarity across TBMs and reanalysis products at the grid cell scale. Mean runoff across all simulated products and regions varies widely (range: 71 to 356 mm yr(-1)) relative to observed continental-scale runoff (209 or 280 mm yr(-1) when corrected for net withdrawals). Across all 14 products 8 exhibit Nash-Sutcliffe efficiency values in excess of 0.8 and three are within 10% of the observed value. Region-level mismatch exhibits a weak pattern of overestimation in western and underestimation in eastern regions although two products are systematically biased across all regions and largely scales with water use. Although gridded composite TBM and reanalysis runoff show some regional similarities, individual product values are highly variable. At the coarse scales used here we find that progress in better constraining simulated runoff requires standardized forcing data and the explicit incorporation of human effects (e.g., water withdrawals by source, fire, and land use change). (C) 2015 Elsevier B.V. All rights reserved.

54 ENVIRONMENTAL SCIENCES↗

Smart Home Hardware-in-the-Loop Testing

This presentation provides a high-level overview of NREL's smart home hardware-in-the-loop testing. It was presented at the Fourth International Workshop on Grid Simulator Testing of Energy Systems and Wind Turbine Powertrains, held April 25-26, 2017, hosted by NREL and Clemson University at the Energy Systems Integration Facility in Golden, Colorado.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARRA: Reconfiguring Power Systems to Minimize Cascading Failures - Models and Algorithms

Building on models of electrical power systems, and on powerful mathematical techniques including optimization, model predictive control, and simluation, this project investigated important issues related to the stable operation of power grids. A topic of particular focus was cascading failures of the power grid: simulation, quantification, mitigation, and control. We also analyzed the vulnerability of networks to component failures, and the design of networks that are responsive to and robust to such failures. Numerous other related topics were investigated, including energy hubs and cascading stall of induction machines

24 POWER TRANSMISSION AND DISTRIBUTION↗

Numerical Simulations of Shock/Plume Interaction Using Structured Overset Grids

Computational simulations using structured overset grids with the Launch Ascent and Vehicle Aerodynamics (LAVA) solver framework are presented for predicting oblique shock/plume interaction effects to near-field sonic boom signatures. Standard second-order accurate as well as higher-resolution numerical discretizations are utilized and compared in the study. The numerical approach is compared with supersonic wind-tunnel data for three cases. The cases include an empty wind-tunnel at the operating conditions, an isolated shockgenerating diamond wedge within the tunnel, and a nozzle with diamond wedge configuration at five different nozzle pressure ratios. Solution sensitivity to numerical discretization is analyzed. Favorable comparisons between the computational results and experimental data of near-field pressure signatures are obtained. A simple prediction method for plume induced shock deflection is developed and results are compared with the CFD data.

Housman, Jeffrey A.↗

Large-Scale Grid Models: Synthetic Data and Co-Simulation

Power grid modernization and wide-spread distributed energy resource (DER) integration are driving an explosion of interest in advanced algorithms and new optimization schemes. However, there has historically been a lack of open-access realistically sized and detailed datasets-particularly for the distribution system-and simulation tools able to model these systems. This talk will present recent advances with very large-scale (>>1M nodes) distribution data sets and the use of co-simulation to tractably model large integrated transmission-distribution grids and their interactions with new controls/optimization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EGSim - a C++ Toolkit for Analysis of Power Grid Systems

We describe the load flow formulation and the solution algorithms available in the Electric power Grid Simulator (EGSim) software toolkit. EGSim contains tools aimed at simulating static load flow solutions for electric power grids. It parses power grid models described in IEEE Common Data Format, and generates solutions for the bus voltages and voltage angles, and real and reactive power values through the transmission lines. The software, written in C++, implements both Gauss-Seidel and Newton solution methods. Example results for the 118 bus models and 300 bus models are also presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling the U.S. Western Electric Interconnection to Understand the Consequences of Hydrometeorological Extremes and Options for Risk Mitigation

Electricity grid operators around the world face a dual challenge; withstanding increasingly severe weather and the longer term impacts of climate change, while simultaneously decarbonizing. Extreme weather events such as heat waves and droughts are rising in both severity and frequency, which is threatening the reliability of electricity grids through increased demand, generation capacity losses, and equipment failures. Consequently, incorporating hydrometeorological stressors into computational power systems analysis is becoming an even more critical tool in long term planning and short term operations. However, there is a general lack of open-source customizable grid simulation software capable of exhaustively stress testing the grid under hydrometeorological uncertainty, and/or examining potential risk mitigation pathways. A related, persistent challenge for power system modelers is striking an appropriate balance between model fidelity (e.g. spatial scale and time resolution) and computational tractability (wall clock run-time). In this study, we are proposing a solution to this problem with open-source software that allows users to seamlessly customize the scale and track the accuracy of grid operations models. Our approach allows users to search over numerous model parameters (network topology, mathematical formulation, economic hurdle rates, and transmission line scaling) to identify model instantiations that accommodate experimental design. Further, we use this approach to demonstrate the importance of including extreme weather events in model validation and model selection. Focusing on the occurrence of heatwaves and droughts in the U.S. Western Interconnection, we examine role of extreme events in balancing tradeoffs between model fidelity and run-time at the model design stage.

Economics↗