Search NASA⌕ Search

SEARCH · Search NASA

Results for “HEPA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

99 records · Page 6

Environmental Testing of Contamination Sensitive Instruments and Optics in Non-Cleanliness Controlled Facilities

The James Webb Space Telescope (JWST) Optical Telescope Element + Integrated Science Instrument Module (OTIS) went through environmental testing at the Goddard Space Flight Center. The vibration and acoustic tests occurred outside of cleanrooms. These areas are typically around ISO Class 8, far out of specifications for JWST. Through collaboration between the OTIS Mechanical and Contamination Engineering teams, a portable clean enclosure was designed, built, and verified to prevent contamination of the sensitive OTIS assembly. This manuscript describes the process of designing and building this enclosure, including materials selection and High Efficiency Particle Air (HEPA) filtration. This enclosure also provided environmental control with a portable air conditioning unit to control the relative humidity level enabling personnel to work within it. The manuscript emphasizes working in a systematic order to maintain cleanliness and integrity. “Clean as you go” during construction was a top priority to ensure that this critical Ground Support Equipment (GSE) was acceptable. The process of installing the walls and then sealing their internal and external surfaces with approved films was critical to maintaining OTIS integrity. This proved important because OTIS was in the enclosure for months longer than originally planned. This manuscript concludes by reviewing the process used to verify that the OTIS clean enclosure could achieve acceptable contamination level fallout accumulation for use during the vibration and acoustic testing and then verifying that the predicted performance was achieved after testing was complete.

Contamination Control, James Webb Space Telescope,↗

Predicting contamination accumulation in facilities with limited data

In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors turned out to be much cleaner than what was predicted.

James Webb Space Telescope, contamination, cleanro↗

Predicting contamination accumulation in facilities with limited data

"In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors are likely much cleaner than was expected with the predicted fallout in each facility. "

James Webb Space Telescope, contamination, cleanro↗

Mitigating Microbial Contamination Risks in CO 2 Removal Systems for Long-Duration Space Missions

Crewed missions to Mars and beyond pose new challenges for the crew and the technological solutions they depend upon. Crucial considerations in designing the next generation of Environmental Control and Life Support Systems (ECLSS) include enhanced reliability and autonomy, given the challenges of resupply and resource recovery in remote missions. One significant challenge faced in various sectors of the International Space Station and ECLSS is the phenomena of microbial growth, particularly biofilm formation. As such, microbial growth is a critical consideration in the design phase of new ECLSS systems. Two novel CO2 removal systems—Liquid-Amines CO2 Removal (LACR) and Cold-Surface CO2 Deposition (CDep)—are currently under development at the NASA Ames Research Center to meet the needs of extended space travel. In this presentation, the authors aim to make a risk assessment of microbial growth in LACR and CDep through: 1) a comprehensive literature review to identify LACR and CDep components most vulnerable to microbial contamination and 2) wet lab testing commencing with a subscale test of the most susceptible component of CDep. The literature review revealed that the hollow-fiber Liqui-Cel membrane employed in CDep exhibits the highest susceptibility to microbial growth. Our wet lab tests corroborated these findings, as airborne microbes introduced into the membrane led to considerable biomass accumulation. These results indicate a significant risk of microbial invasion into the membranes. To prevent microbial growth in CDep or other CO2 removal systems, proper ECLSS arrangement is essential—a CO2 removal system should remain behind the charcoal-HEPA filters, condensing heat exchanger, and Trace Contaminant Control System. In summary, anticipating potential microbial interactions within ECLSS for remote crewed missions is vital to mission success. It should, therefore, be included as one of the many factors when designing future ECLSS systems to perform reliably and consistently to support astronaut life.

A. Nicolas Whitlock↗

Evaluation of the Accumulation of Foreign Object Debris in the International Space Station Ventilation Systems and Resulting Impacts to Systems

A challenge for the International Space Station (ISS) is accumulation of foreign object debris (FOD) in the ventilation systems and the impacts to crew, equipment, and experiments. One function of the temperature and humidity control system is to capture FOD with various methods of filtration to minimize these impacts. ISS filtration has been augmented by charcoal and High Efficiency Particulate Air (HEPA) filters and screens. A qualitative comparison of the quantity of FOD found since 2012 study and the current levels are evaluated. Impacts due to FOD are reduced air circulation, increased crew time for cleaning, reduction of equipment life, and component damage; examples are provided. Recommendations for further improvements to reduce the accumulation of FOD on ISS are provided.

ISS↗

Airborne infectious disease isolation units and method of making using prefabricated containers

In one embodiment, a prefabricated container is modified as a medical isolation room by replacing an original door with a clear front door. An intake louver and an adjustable damper are disposed at a lower part of the front end. An exhaust vent is disposed at an upper part of the back wall. An exhaust fan and a HEPA filter are coupled to the exhaust vent. Washable coverings cover interior sides of the container to provide washable, nonslip interior surfaces. The exhaust fan and the adjustable damper at the intake louver are controlled to produce in the medical isolation room a negative air pressure of at least about minus 0.01 inch of water gage (approximately 2.5 pascals) and a displacement ventilation exhaust flow rate through the exhaust vent of at least about 100 cubic feet per minute (cfm) greater than an intake flow rate through the intake louver.

Channell, Michael G.↗

Calculating Potential Radiological Emissions for Waste Management Activities at INL - 20068

At Idaho National Laboratory (INL), work involving radionuclides is evaluated for potential emissions from a project in order to comply with the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations, 40 CFR 61 Subpart H. Emission calculations are documented in an Air Permitting Applicability Determination (APAD) to analyze unmitigated and mitigated emissions and determine if an Application to Construct (ATC) or continuous monitoring is required. To calculate the unmitigated and mitigated emissions, a spreadsheet was developed to provide ease in determining potential emissions by providing the maximum operating temperature and the material being used. The spreadsheet aids in determining the potential emissions for research projects and waste management activities at Materials and Fuels Complex (MFC) and other locations across the INL site. Furthermore, it can also be used for periodic confirmatory measurements (PCM) to justify low emissions. Elements that factor into the unmitigated and mitigated calculations include the amount of each radionuclide used (in curies or grams), specific activity (if amount is given in grams), the temperature the material is heated to in Celsius, the dose conversion factor which is derived from Clean Air Act Assessment Package - 1988 (CAP-88) modeling, and the number of HEPA filters used for mitigated measures. The main drivers for calculating the unmitigated emissions for a project are the amount used per radionuclide, the maximum operating temperature, and the location of the work. The maximum operating temperature determines the airborne release factor which is dependent on the physical state of the radionuclide. Prior to October 2017, if the radionuclide was heated to greater than 100 deg. C, the radionuclide was assumed to be a gas, which has the highest airborne release factor. This assumption would be overly conservative for radionuclides with high melting and boiling points, which provided a challenge to demonstrate low emissions. In October 2017, the Environmental Protection Agency (EPA) approved an alternative method for INL. This method allows the airborne release factor to be determined by using the melting point and 90% of the boiling point of the radionuclide. This methodology was included in the spreadsheet to allow unmitigated emission calculations for APADs to be completed more efficiently and effectively. Results show a reduction in time completing air emission calculations as well as lower total emissions across all facilities at INL. MFC annual emissions were reduced by 62% from the previous year and Research and Education Campus (REC) facilities were reduced by 38% due to implementation of the approved alternative method. Time spent on APADs, PCMs, and documentation for the annual NESHAP report was also reduced significantly. The spreadsheet provided in Table I provides the potential emission calculations for the 'Advanced Retrieval and Disposition Techniques for Remote Handled Mixed Low Level Waste (RH MLLW) at the Radioactive Scrap and Waste Facility (RSWF)' project. Calculations show the Potential Effective Dose Equivalent (PEDE) at RSWF to be 7.27 E-04 mrem/yr (7.27 E-09 Sv/yr) which is well below the 0.1 mrem/yr threshold. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗