Search NASA⌕ Search

SEARCH · Search NASA

Results for “HOPE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

HOPE Heavy Ion Survey

Explore the source record for details and available documents.

Heliospheric and Magnetospheric Physics↗

Coal companies hope to receive carbon credits for methane reductions

Each year, underground coal mining in the USA liberates 2.4 million tonnes of coal mine methane (CMM), of which less than 30% is recovered and used. One barrier to CMM recovery is cost. Drainage, collection, and utilization systems are complex and expensive to install. Two coal mines have improved the cost equation, however, by signing on to earn money for CMM emissions they are keeping out of the atmosphere. Jim Walter Resources and PinnOak Resources have joined a voluntary greenhouse gas reduction trading program called the Chicago Climate Exchange (CCX) to turn their avoided emissions into carbon credits. The example they set may encourage other coal mining companies to follow suit, and may bring new projects on the line that would otherwise have not gone forward. 2 refs., 1 fig.

01 COAL, LIGNITE, AND PEAT↗

The Port Hope Areas Initiative's Port Granby Project: Radiation Protection Program - 17446

The Port Granby Project is large remediation project currently underway. A comprehensive and effective radiation protection program has been developed and implemented for the Port Granby Project. The potential radiation hazards associated with this project include: external (gamma) radiation, radon, inhalation, contamination and ingestion. Processes to address each of these potential hazards are identified. Measures of the effectiveness of the radiation protection program are also included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Port Granby Project: Effectiveness of the Radiation Protection Program - 18595

The Port Granby Project is large remediation project currently underway. It is approximately 50% complete. A comprehensive and effective radiation protection program has been developed and implemented for the Port Granby Project. The potential radiation hazards associated with this project include: external (gamma) radiation, radon, inhalation, contamination and ingestion. The radiation protection program is highly effective and has succeeded in managing the significant radiation hazards associated with this remediation project. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Port Hope Area Initiative - Port Granby Project: Managing Highly Heterogeneous Low-Level Radioactive Waste - 20327

The Port Granby Project is a large remediation project currently approximately 95% complete. Initial waste characterization was provided through a borehole sampling program. As the waste was excavated, it was found to be highly heterogeneous, ranging from essentially 'clean' material to hundreds of Bq/g. This heterogeneity resulted in constantly changing site conditions. Methods to adapt to these conditions are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Vision in Motion Project - 19128

Cameco Corporation is a world leader in uranium production. Cameco is also a major supplier of uranium processing services required to produce fuel for the generation of clean energy. These operations are based in Blind River, Cobourg and Port Hope, Ontario and are collectively referred to as the Fuel Services Division. The Fuel Services Division produces uranium trioxide from uranium ore concentrate at the Blind River Refinery. Cameco produces uranium hexafluoride and uranium dioxide at the Port Hope Conversion Facility. Cameco operates a fuel manufacturing facility in Port Hope, Ontario and a metal fabrication facility located in Cobourg, Ontario. The company manufactures fuel bundles utilized in the Candu reactors. Cameco is undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is located in the Municipality of Port Hope (MPH). This undertaking is known as the Vision in Motion (VIM) project. This project is unique and timely opportunity that has been made possible because of the Port Hope Area Initiative (PHAI). The PHAI Port Hope project is being undertaken by Canadian Nuclear Laboratories (CNL) and includes the construction of a long-term waste management facility (LTWMF) in the MPH. VIM entails an extensive remediation and redevelopment of much of the PHCF and includes: - the cleanup and demolition of a number of old or underutilized buildings; - the removal of contaminated soils, building materials and stored wastes; and - modifications to existing buildings at the PHCF with associated landscaping and infrastructure. Overall, the VIM project will allow for environmental remediation, improved site operations, enhancement of site safety and security through site design and improved aesthetics. This paper will discuss the status of this project underway at the Port Hope Conversion Facility. After years of community consultation, planning, and a successful environmental assessment and licensing of the project, the VIM project at the PHCF is now underway. Physical transfer of waste materials began in June 2018. Cameco is committed to seeing the project through to completion and is working with CNL to ensure this happens within the operating time frame of the LTWMF. Cameco keeps the CNSC and MPH well informed of all project related activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Data Management System in Support of Remedial Actions for Legacy Radioactive Contamination - 17280

The Port Hope Area Initiative (PHAI) is a project mandated and funded by the Government of Canada to remove contamination from properties with legacy low-level radioactive waste (LLRW) contamination arising from a crown-owned radium and, later, uranium refinery in the Town of Port Hope, Ontario. From 1976 to 1981, a community clean-up project was undertaken, with the specific purpose to decrease the level of historic LLRW contamination within Port Hope. Since then, residual LLRW has been managed by the Low Level Radioactive Waste Management Office (LLRWMO) (and its predecessors). The PHAI and the Port Hope Project (PHP) were initiated in 2001 with a formal agreement between affected municipalities and the federal government to develop a safe, long-term management solution for the historic LLRW remaining within Port Hope. An important activity of the PHP is the survey of about 4,800 'small scale sites' (SSS) throughout the community to confirm the presence or absence of LLRW. This involves surveys of properties based on the measurement of exterior gamma, contaminated objects and surfaces, soil concentrations and indoor radon and classification to Port Hope project specific criteria. A very large amount of information is involved in the project including; scheduling individual field visits to the properties, capture of field data and comments, laboratory sample tracking, QA/QC, report generation and internal and client project reporting at regular schedules. Field data collection of exterior gamma radiation surveys includes direct (real time) and interactive loading of data into the Information Management (IM) system to support initial QA/QC and reporting back to the field on radiation levels. Screening soil measurements including X-ray fluorescence (XRF) and gamma radiation are collected from all 20 cm increments in each borehole in addition to down-hole gamma radiation measurements and logging of soil characteristics which are used in documentation and interpretation of the property condition. The IM system outlined in this paper was developed to respond to the requirements for radiological surveys in Port Hope. The IM system continues to evolve as a part of continuing review and improvement. The IM system incorporates Web-enabled field tools and cloud hosted data and applications, provides increased field efficiency, timeliness in reporting, real time QA/QC analysis, and consistency in tracking project advances and changes made to the data for decision-making and reporting on an ongoing basis. Examples of specific applications are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing 5,000 Properties to Determine which Require Radiological Remediation - 19152

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (hLLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. Conducting work safely, while delivering the PHAI on time and within budget, is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.7 million cubic metres of hLLRW from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale sites (SSS) - primarily residential - in the Municipality of Port Hope for the presence or absence of hLLRW. This paper provides an overview of the characterization, delineation and design for remediation of historic LLRW for the SSS, a grouping of sites within the municipality comprised of residential properties, municipal properties including municipal road allowances, private road allowances and temporary storage sites. Comprising over 4,800 parcels of land, a robust remedial process was designed to identify, characterize, delineate and remediate interior and exterior hLLRW contamination found in soils and building materials. The process adheres to the framework of the Port Hope Project Waste Nuclear Substance Licence (License) and its associated governance frameworks and regulatory requirements [1]. The overall goal is for CNL to be able to issue the owner of each parcel of land a Compliance Letter stating that the site meets the PHAI Clean-up Criteria, either after completion of characterization (if no hLLRW is identified) or after completion of remediation and verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗