Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hardware Temperature Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

95 records · Page 6

Higher Efficiency, Demand Flexible Refrigerator with On-Demand Micro-Vibrational De-icing Technology

Refrigerator technology has advanced significantly over the last couple of decades. Today’s refrigerators use only about 25% of the energy that was required to power models built in 1975. Even as they continually improve efficiency to meet standards, refrigerators have increased in size by almost 20%, added energy-consuming features such as through-the-door ice, and provide more benefits than ever before. However, a few challenges and technology gaps are preventing further improvement of the demand responsiveness and efficiency of the refrigerators. One of the major technology gaps in existing refrigerators is their outdated de-icing process. When the evaporator generates frost, an old-fashioned resistive heating element melts the ice. Most refrigerators have a timed defrost cycle, rather than an active system that could monitor the state of the frost. In these systems, not only is the precious electricity used at its least efficient form of conversion (direct conversion of electricity to heat), but also all the latent heat associated with the ice is wasted during the melting process. On top of that, the refrigerator needs to work harder to pull the temperature down after defrosting, and, last but not least, the food quality is severely impacted by the temperature swings during the defrost cycle. According to a study, the EU alone wastes 89 million tons of food in the supply chain every year. Any temperature swing during defrosting (about 6F according to Emerson for low-temperature cases) can negatively impact the shelf life of meat and other products for multiple days. All these issues can happen during the peak demand time of the electric grid. Unlike the conventional systems, the proposed novel advanced micro-vibrational deicing process uses no heat for defrosting. Instead, it uses the micro vibrations generated by a piezoelectric or vibration-generating module to mechanically break ice from the heat exchanger almost instantaneously. The project titled “Higher Efficiency, Demand Flexible Refrigerator with On-Demand Micro-Vibrational De-icing Technology, performed by Ultrasonic Technology Solutions, LLC (UTS) of Knoxville, TN, in collaboration with Emerson (now Copeland), represents the final phase of a multi-year effort funded under the U.S. Department of Energy’s Building Technologies Office (BTO) BENEFIT FOA 2020. Initiated on October 1, 2021, and completed after a nine-month no-cost extension ending September 30, 2025, this project aimed to develop and validate a novel micro-vibrational mechanical defrosting system, achieving more than 25% improvement in defrosting energy efficiency over conventional baseline defrosting technologies. Over sixteen quarters, the project advanced from fundamental ice-mechanical characterization and prototype development to full-scale system integration and validation. Initial efforts established project management infrastructure and characterized ice adhesion properties, followed by the design and fabrication of early aluminum-based prototypes for resonance frequency testing. Subsequent quarters saw rapid technical progression, including the identification of optimal piezoelectric and motor-based vibration mechanisms, the demonstration of effective de-icing over 6x6-inch aluminum surfaces. The team achieved its Go/No-Go milestone by exceeding the 25% energy-efficiency improvement target—reaching up to 3,340% under optimized conditions—and later confirmed that motor-driven systems offered superior performance and energy efficiency compared to piezoelectric alternatives. Continued refinement led to the development of amplifier systems on printed circuit boards, improved control and instrumentation hardware, and integration into full-scale heat exchanger (HX) prototypes at both UTS and Copeland facilities. Multiple vibration-mounting studies and frost-growth experiments guided mechanical optimization and noise-mitigation strategies, achieving a 17.5 dB reduction in sound pressure level and verifying robust mechanical performance. Advanced analyses, including modal and harmonic simulations, established a quantitative understanding of vibrational behavior and de-icing efficiency across >1000 cm² systems. The final project phase successfully demonstrated scalable integration within reach-in and chest freezer prototypes, confirmed >25% efficiency improvements in large-area systems, and completed a comprehensive business model and scale-up strategy identifying electric defrost systems as the primary beachhead market. The culmination of this DOE-supported effort establishes micro-vibrational defrosting as a viable, high-efficiency, low-noise, and demand-flexible de-icing technology, paving the way for commercial deployment and broader application in next-generation refrigeration systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Optimization of WAAM Process to Produce AUSC Components with Increased Service Life

Additive manufacturing has the potential to revolutionize industrial hardware and unlock efficiency gains through the fabrication of geometries and architectures not possible by conventional processing. Wire Arc Additive manufacturing (WAAM) process is a class of directed energy deposition process enabling higher build rate and allowing custom wire feedstock allowing spatial variation of microstructure. The larger spot size and lower speed creates a larger melt pool, reducing residual stress and often time creating directional/columnar microstructure for Ni-superalloy. The use of flexible platform provides freedom in deposition strategy, which can accommodate complex substrates, including feature addition onto existing structures, non-flat layers, and repair methods. However, the certification of the final component needs to match the strength requirement. Hence, the quality of the component produced is stringently monitored to avoid buildup of residual stress, cracks, porosity and to reduce detrimental segregated phases commonly observed during alloy solidification. Simulation plays a huge role in predicting the melt pool dimension and can be used to optimize the process parameter. Similar development is also required to perform physics-based modeling of microstructural development in WAAM that can predict the microstructural features during solidification and can be used to optimize the process more effectively. To move toward this goal, Raytheon Technologies Research Center together with Siemens worked to create a set of computational tools to control the process parameters, enable on-line measurements and acquisition with feedback to the optimized process parameters, and eventually track material evolution through each step of the additive process. Computational fluid dynamics is used for accurate prediction and calibration of the thermal field during WAAM process. and phase field models for microstructure evolution as a function of processing parameters to establish a connection between additive parameters and the final microstructure. Here we report cellular automata (CA) model development to predict the dendritic microstructure evolution with surface and bulk nuclei for single track and multiple layers. The CA model was developed to account for secondary element addition and predict segregation, local melting, and latent heat release as well as prediction of Euler angles from orientation information and validated against experiments. This framework was utilized to tailor spatially-varying composition in a part by appropriately controlling the microstructure evolution during the additive process. Functionally graded Haynes 282 alloy with high Cr content at the surface was tested for oxidation and mechanical properties. An advanced physics-based reaction-diffusion model predicting the simultaneous creation of chromium oxide and alumina is developed and validated to extend life expectancy of the WAAM manufactured high temperature part. A machine-learning data-driven framework establishing the process-structure relationship from a dataset of real microstructure images and corresponding process history data has been developed and implemented in the NX Siemens design system. The digital twin configuration along with the tool path generation enabled prediction of WAAM component buildup time and the techno-economic analysis provided a favorable option for all 4 cases with 15-40% cost reduction.

33 ADVANCED PROPULSION SYSTEMS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗