Search NASA⌕ Search

SEARCH · Search NASA

Results for “Human-Rating”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Testing Lunar Return Thermal Protection Systems using Sub-Scale Flight Test Vehicles

A key objective of NASA's Vision for Space Exploration is to revisit the lunar surface. Such an ambitious goal requires the development of a new human-rated spacecraft, the Orion Crew Exploration Vehicle (CEV), to ferry crews to low earth orbit and to the moon. The successful conclusion of both types of missions will require a thermal protection system (TPS) capable of protecting the vehicle and crew from the extreme heat of atmospheric reentry. As a part of the TPS development, various materials are being tested in arcjet tunnels; however, the combined lunar return aerothermal environment of high heat flux, shear stress, and surface pressure cannot be duplicated using only existing ground test facilities. To ensure full TPS qualification, a flight test program using sub-scale Orion capsules has been proposed to test TPS materials and heat shield construction techniques under the most stressing combination of lunar return aerothermal environments. Originally called Testing Of Reentry Capsule Heat Shield, or TORCH, but later renamed LEX, for Lunar Reentry Experiment, the proposed flight test program is presented along with the driving requirements and descriptions of the vehicle and the TPS instrumentation suite slated to conduct in-flight measurements.

heatshield↗

The Art and Science of Systems Engineering

The National Aeronautics and Space Administration (NASA) was established in 1958, and its Marshall Space Flight Center was founded in 1960, as space-related work was transferred from the Army Ballistic Missile Agency at Redstone Arsenal, where Marshall is located. With this heritage, Marshall contributes almost 50 years of systems engineering experience with human-rated launch vehicles and scientific spacecraft to fulfill NASA's mission exploration and discovery. These complex, highly specialized systems have provided vital platforms for expanding the knowledge base about Earth, the solar system, and cosmos; developing new technologies that also benefit life on Earth; and opening new frontiers for America's strategic space goals. From Mercury and Gemini, to Apollo and the Space Shuttle, Marshall's systems engineering expertise is an unsurpassed foundational competency for NASA and the nation. Current assignments comprise managing Space Shuttle Propulsion systems; developing environmental control and life support systems and coordinating science operations on the International Space Station; and a number of exploration-related responsibilities. These include managing and performing science missions, such as the Lunar Crater Observation and Sensing Satellite and the Lunar Reconnaissance Orbiter slated to launch for the Moon in April 2009, to developing the Ares I crew launch vehicle upper stage and integrating the vehicle stack in house, as well as designing the Ares V cargo launch vehicle and contributing to the development of the Altair Lunar Lander and an International Lunar Network with communications nodes and other infrastructure.

Singer, Christopher E.↗

Planning for Plume Diagnostics for Ground Testing of J-2X Engines at the SSC

John C. Stennis Space Center (SSC) is the premier test facility for liquid rocket engine development and certification for the National Aeronautics and Space Administration (NASA). Therefore, it is no surprise that the SSC will play the most prominent role in the engine development testing and certification for the J-2X engine. The Pratt & Whitney Rocketdyne J-2X engine has been selected by the Constellation Program to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage in NASA s strategy of risk mitigation for hardware development by building on the Apollo program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. Accordingly, J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development and testing efforts. In order to leverage SSC s successful and innovative expertise in the plume diagnostics for the space shuttle main engine (SSME) health monitoring,1-10 this paper will present a blueprint for plume diagnostics for various proposed ground testing activities for J-2X at SSC. Complete description of the SSC s test facilities, supporting infrastructure, and test facilities is available in Ref. 11. The A-1 Test Stand is currently being prepared for testing the J-2X engine at sea level conditions. The A-2 Test Stand is currently being used for testing the SSME and may also be used for testing the J-2X engine at sea level conditions in the future. Very recently, ground-breaking ceremony for the new A-3 rocket engine test stand took place at SSC on August 23, 2007. A-3 is the first large - scale test stand to be built at the SSC since the A and B stands were constructed in the 1960s. The A-3 Test Stand will be used for testing J-2X engines under vacuum conditions simulating high altitude operation at approximately 30,480 m (100,000 ft). To achieve the simulated altitude environment, chemical steam generators using isopropyl alcohol, LOX, and RELEASED - Printed documents may be obsolete; validate prior to use. water would run for the duration of the test and would generate approximately 2096 Kg/s of steam to reduce pressure in the test cell and downstream of the engine. The testing at the A-3 Test Stand is projected to begin in late 2010, meanwhile the J-2X component testing on A-1 is scheduled to begin later this year.

SaintCyr, William W.↗

Ares I Avionics Introduction

The Ares I is the next generation human-rated launcher for the United States Constellation program. This system is required to provide single fault tolerance within defined crew safety and mission reliability limits. As part of the effort to achieve those safety goals, Ares I includes an avionics subsystem built as a multistring, voting architecture. The avionics design draws upon experience gained from building fly-by-wire systems for Shuttle, X- 38, and Seawolf. Architectural drivers for the avionics design include using proven technologies with existing suppliers of space rated parts for critical functions (to reduce overall development risk), easing the software development effort by using an off-theshelf, DO-178B certifiable, ARINC-653 operating system in the main flight computers, minimizing mutual data and power connections that might lead to a common-mode hardware failure of the redundant avionics strings, and centralizing overall Ares I command & control within the Upper Stage.

Marchant, Christopher C.↗

An Up-Close Look at Ares I-X

On October 28, 2009, one day later than the originally planned launch date, the Ares I-X suborbital test flight roared into the Florida sky. Flying its preplanned parabolic arc over the Atlantic, the development test vehicle for the Ares I crew launch vehicle performed as advertised, executing a perfect liftoff, 90-degree roll maneuver, ascent, and separation before its upper and lower stages descended into the ocean 150 miles downrange. This test flight, while carrying no astronauts, marked a major milestone for NASA, which had not flown a test launch of a human-rated rocket since the first flight of the Space Shuttle in 1981. During the flight, over 700 sensors collected over 900 measurements, which NASA will apply to validating the engineering models they used to design the vehicle in the first place. That data, telemetered to the ground and stored in a flight recorder onboard, was the primary "payload" of the mission.

Leahy, Bart↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Ares I-X: First Flight of a New Generation

The Ares I-X suborbital development flight test demonstrated NASA s ability to design, develop, launch and control a new human-rated launch vehicle (Figure 14). This hands-on missions experience will provide the agency with necessary skills and insights regardless of the future direction of space exploration. The Ares I-X team, having executed a successful launch, will now focus on analyzing the flight data and extracting lessons learned that will be used to support the development of future vehicles.

Davis, Stephan R.↗

Historic and Current Launcher Success Rates

This presentation reviews historic and current space launcher success rates from all nations with a mature launcher industry. Data from the 1950's through present day is reviewed for possible trends such as when in the launch timeline a failure occurred, which stages had the highest failure rate, overall launcher reliability, a decade by decade look at launcher reliability, when in a launchers history did failures occur, and the reliability of United States human-rated launchers. This information is useful in determining where launcher reliability can be improved and where additional measures for crew survival (i.e., Crew Escape systems) will have the greatest emphasis

Rust, Randy↗

A Perspective on Computational Human Performance Models as Design Tools

The design of interactive systems, including levels of automation, displays, and controls, is usually based on design guidelines and iterative empirical prototyping. A complementary approach is to use computational human performance models to evaluate designs. An integrated strategy of model-based and empirical test and evaluation activities is particularly attractive as a methodology for verification and validation of human-rated systems for commercial space. This talk will review several computational human performance modeling approaches and their applicability to design of display and control requirements.

Jones, Patricia M.↗

Analysis and Test of a Proton Exchange Membrane Fuel Cell Power System for Space Power Applications

An effort is underway to develop a prototype Proton Exchange Membrane (PEM) Fuel Cell breadboard system for fuhlre space applications. This prototype will be used to develop a comprehensive design basis for a space-rated PEM fuel cell powerplant. The prototype system includes reactant pressure regulators, ejector-based reactant pumps, a 4-kW fuel cell stack and cooling system, and a passive, membranebased oxygen / water separator. A computer model is being developed concurrently to analytically predict fluid flow in the oxidant reactant system. Fuel cells have historically played an important role in human-rated spacecraft. The Gemini and Apollo spacecraft used fuel cells for vehicle electrical power. The Space Shuttle currently uses three Alkaline Fuel Cell Powerplants (AFCP) to generate all of the vehicle's 15-20kW electrical power. Engineers at the Johnson Space Center have leveraged off the development effort ongoing in the commercial arena to develop PEM fuel cel ls for terrestrial uses. The prototype design originated from efforts to develop a PEM fuel cell replacement for the current Space Shuttle AFCP' s. In order to improve on the life and an already excellent hi storical record of reliability and safety, three subsystems were focused on. These were the fuel cell stack itself, the reactant circulation devices, and reactant / product water separator. PEM fuel cell stack performance is already demonstrating the potential for greater than four times the useful life of the current Shuttle's AFCP. Reactant pumping for product water removal has historically been accomplished with mechanical pumps. Ejectors offer an effective means of reactant pumping as well as the potential for weight reduction, control simplification, and long life. Centrifugal water separation is used on the current AFCP. A passive, membrane-based water separator offers compatibility with the micro-gravity environment of space, and the potential for control simplification, elimination of moving parts in an oxygen environment, and long life. The prototype system has been assembled from components that have previously been tested and evaluated at the component level. Preliminary data obtained from tests performed with the prototype system, as well as other published data, has been used to validate the analytical component models. These components have been incorporated into an integrated oxidant fluid system model. Results obtained from both the performance tests and the analytical model are presented.

Vasquez, Arturo↗

Ground Processing Affordability for Space Vehicles

Launch vehicles and most of their payloads spend the majority of their time on the ground. The cost of ground operations is very high. So, why so often is so little attention given to ground processing during development? The current global space industry and economic environment are driving more need for efficiencies to save time and money. Affordability and sustainability are more important now than ever. We can not continue to treat space vehicles as mere science projects. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability which are not available for ELV's (Expendable Launch Vehicles). More human-rated vehicles are being developed, with the retirement of the Space Shuttles, and for a new global space race, yet these cost more than the many unmanned vehicles of today. We can learn many lessons on affordability from RLV's. DFO (Design for Operations) considers ground operations during design, development, and manufacturing-before the first flight. This is often minimized for space vehicles, but is very important. Vehicles are designed for launch and mission operations. You will not be able to do it again if it is too slow or costly to get there. Many times, technology changes faster than space products such that what is launched includes outdated features, thus reducing competitiveness. Ground operations must be considered for the full product Lifecycle, from concept to retirement. Once manufactured, launch vehicles along with their payloads and launch systems require a long path of processing before launch. Initial assembly and testing always discover problems to address. A solid integration program is essential to minimize these impacts, as was seen in the Constellation Ares I-X test rocket. For RLV's, landing/recovery and post-flight turnaround activities are performed. Multi-use vehicles require reconfiguration. MRO (Maintenance, Repair, and Overhaul) must be well-planned--- even for the unplanned problems. Defect limits and standard repairs need to be in-place as well as easily added. Many routine inspections and maintenance can be like an aircraft overhaul. Modifications and technology upgrades should be expected. Another factor affecting ground operations efficiency is trending. It is essential for RLV's, and also useful for ELV's which fly the same or similar models again. Good data analysis of technical and processing performance will determine fixes and improvements needed for safety, design, and future processing. Collecting such data on new or low-frequency vehicles is a challenge. Lessons can be learned from the Space Shuttle, or even the Concorde aircraft. For all of the above topics, efficient business systems must be established for comprehensive program management and good throughput. Drawings, specifications, and manuals for an entire launch vehicle are often in different formats from multiple vendors, plus they have proprietary constraints. Nonetheless, the integration team must ensure that all data needed is compatible and visible to each appropriate team member. Ground processing systems for scheduling, tracking, problem resolution, etc. must be well laid-out. The balance between COTS (commercial off the shelf) and custom software is difficult. Multiple customers, vendors, launch sites, and landing sites add to the complexity of efficient IT (Information Technology) tools.

Ingalls, John↗

Designing the Ares I Crew Launch Vehicle Upper Stage Element and Integrating the Stack at NASA's Marshall Space Flight Center

Fielding an integrated launch vehicle system entails many challenges, not the least of which is the fact that it has been over 30 years since the United States has developed a human-rated vehicle - the venerable Space Shuttle. Over time, whole generations of rocket scientists have passed through the aerospace community without the opportunity to perform such exacting, demanding, and rewarding work. However, with almost 50 years of experience leading the design, development, and end-to-end systems engineering and integration of complex launch vehicles, the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center offers the in-house talent - both junior- and senior-level personnel - to shape a new national asset to meet the requirements for safe, reliable, and affordable space exploration solutions. The technical personnel are housed primarily in Marshall's Engineering Directorate and are matrixed into the programs and projects that reside at the rocket center. Fortunately, many Apollo-era and Shuttle engineers, as well as those who gained valuable hands-on experience in the 1990s by conducting technology demonstrator projects such as the Delta-Clipper Experimental Advanced, X-33, X-34, and X-37, as well as the short-lived Orbital Space Plane, work closely with industry partners to advance the nation's strategic capability for human access to space. The Ares Projects Office, resident at Marshall, is managing the design and development of America's new space fleet, including the Ares I, which will loft the Orion crew capsule for its first test flight in the 2013 timeframe, as well as the heavy-lift Ares V, which will round out the capability to leave low-Earth orbit once again, when it delivers the Altair lunar lander to orbit late next decade. This paper provides information about the approach to integrating the Ares I stack and designing the upper stage in house, using unique facilities and an expert workforce to revitalize the nation's space exploration resources.

Otte, Neil E.↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system.

Priskos, Alex S.↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an inline, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system. The presentation provides an overview of the information presented in the paper.

Priskos, Alex S.↗

Enabling Reliable, Fault-Tolerant Autonomous Lunar Habitats with High-Performance Spaceflight Computing

The lunar surface presents unfavorable constraints and harsh living conditions. To address these challenges, autonomous habitats will require complex integrated systems that combine advanced software, high-performance hardware, and cutting-edge sensors to ensure sustainability, safety, and operational efficiency. Consequently, maintaining a sustainable presence on the Moon requires reliable infrastructure and efficient development, precise monitoring, and utilization of resources within a lunar installation. These elements are essential not only to ensure that lunar settlement can be long-term, self-sustaining, and resource-efficient, but also to serve as a foundation for future missions and eventual human habitation on Mars. Humans are not native to the Moon; therefore, our survival and ability to thrive will depend on autonomous systems that can foster safety and resilience through high-availability architectures, graceful degradation, and highly fault-tolerant spaceflight hardware capable of continuing operation during failures. This requires advanced human-rated distributed systems architectures with specialized electronics, scalable capabilities, and an integrated design approach. Unlike current practices focused on short-term missions and regularly maintained components, permanent lunar compute systems must be designed for extended operations beyond mission durations. This paper explores the necessity of transitioning toward fault- tolerant, highly autonomous hardware systems designed for multi-year missions. It also identifies critical subsystems that require high levels of autonomy, supported by radiation-hardened processors and extreme thermal loads, which are essential to mitigate long-term degradation and ensure sustainable lunar habitation. Finally, the paper aligns with NASA’s identified Civil Space Shortfalls, particularly in high-performance onboard computing, advanced data acquisition, extreme-environment avionics, radiation monitoring and countermeasures, and autonomous health management. It proposes NASA’s new High-Performance Spaceflight Computing (HPSC) processor as a turnkey solution, delivering 100 times the performance-per-watt of legacy rad-hard CPUs and enabling onboard AI, edge computing, and fault-tolerant features essential for sustained lunar autonomy and beyond.

Sarkis S Mikaelian↗

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris↗

Overview of Past and Future EVA Suit Testing and Training in Chamber B at NASA JSC

The Crew and Thermal System Division’s Chamber B has received an increase in demand for next generation suit testing. Chamber B is the National Aeronautics and Space Administration (NASA) Johnson Space Center’s only human-rated thermal vacuum (TVAC) chamber. Historically it was used in Gemini, Apollo, Skylab, Shuttle, and the International Space Station (ISS) suit tests. Recently, the chamber has been returned to service with new capabilities for suit testing. In 2023, The Exploration Extravehicular Mobility Unit (xEMU) underwent a 5-day, extensive thermal vacuum test that included both a full-bodied Exploration Pressure Garment Suit (xPGS) as well as a high fidelity Short xEMU. SpaceX has also used the chamber for human-in-the-loop (HITL) qualification and acceptance testing on their flight Polaris Dawn suits for the first-ever commercial extravehicular activity (EVA). Current chamber Manlock B2 upgrades include the support of two test subjects at the same time with updated chamber interface and support systems for the next generation of suits. This paper will discuss the history of spacesuit testing in the chamber, the recent testing for commercial and NASA suits, and upgrades to accommodate new test requirements.

Polaris Dawn↗

Thermal Considerations for 2039 Opposition Class Nuclear Electric Propulsion/Chemical Propulsion Crewed Mars Mission

The high specific impulse (Isp) of Nuclear Electric Propulsion (NEP) technology offers the potential for advanced space mission capabilities. However, the five critical technology elements of NEP vehicles have yet to prove technical maturity levels for consideration into mission design. In response to the critical reviews by the NASA Engineering and Safety Center (NESC) and the National Academies of Sciences, Engineering, and Medicine (NASEM), NASA’s Space Nuclear Propulsion (SNP) project created an NEP Technology Maturation Plan (TMP) for focused development of NEP technology. The TMP called for a coordinated set of technology development efforts to meet this objective. The Modular Assembled Radiators for NEP VehicLes (MARVL) Early Career Initiative (ECI) project was initiated to develop a portion of the fifth Critical Technology Element (CTE) of the NEP vehicle: the Primary Heat Rejection Subsystem (PHRS). A target application of a 2039 human-rated Mars mission was outlined in the TMP. For the outlined mission, a NEP vehicle will experience several thermal environments which will impact the design and operation of the PHRS. To maintain radiator temperatures within the required effective temperature range, the effect of natural, induced, and NEP internally generated heat loads on the radiator panel must be well understood. Furthermore, this analysis is critical for analyzing the influence of various orientations and positions of the NEP vehicle relative to nearby celestial bodies throughout the mission. This study conducted a complete enveloping analysis of the thermal environments influencing the NEP vehicle throughout the mission. Thermal analysis was conducted for the radiator panels based on the defined mission environments. This thermal analysis concludes with the selection of ideal radiator orientations for the NEP vehicle, and the identification of worst case hot and cold environmental sink temperatures throughout the mission. For the target application, the environmental sink temperature while the reactor is powered OFF or powered ON ranges from 30 K to 353 K and 2.7 K to 243 K respectively. When considering interplanetary space, the minimum environmental sink temperature when the reactor is powered OFF and the radiators are oriented “edge to Sun” is 2.7 K. The environmental thermal models generated in this study will be used for future studies with the full vehicle system model. The environmental sink temperature curves generated will be used for future radiator and component analysis to predict transient performance in the space environment. The environmental sink temperature and heat rejection capability curves will inform the trade between commissioning orbits that are in consideration. The model may also serve as a useful tool as reference for future crewed space missions, missions involving radiators or temperature sensitive equipment, or other missions requiring analysis of natural orbital thermal environments.

Nuclear Electric Propulsion↗