Search NASA⌕ Search

SEARCH · Search NASA

Results for “IDM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Composite panel development at JPL

Parametric computer studies can be use in a cost effective manner to determine optimized composite mirror panel designs. An InterDisciplinary computer Model (IDM) was created to aid in the development of high precision reflector panels for LDR. The materials properties, thermal responses, structural geometries, and radio/optical precision are synergistically analyzed for specific panel designs. Promising panels designs are fabricated and tested so that comparison with panel test results can be used to verify performance prediction models and accommodate design refinement. The iterative approach of computer design and model refinement with performance testing and materials optimization has shown good results for LDR panels.

Mcelroy, Paul↗

The development of an intelligent user interface for NASA's scientific databases

The National Space Science Data Center (NSSDC) has initiated an Intelligent Data Management (IDM) research effort which has as one of its components, the development of an Intelligent User Interface (IUI). The intent of the IUI effort is to develop a friendly and intelligent user interface service that is based on expert systems and natural language processing technologies. This paper presents the design concepts, development approach and evaluation of performance of a prototype Intelligent User Interface Subsystem (IUIS) supporting an operational database.

Campbell, William J.↗

Integrating NASA's Land Analysis System (LAS) image processing software with an appropriate Geographic Information System (GIS): A review of candidates in the public domain

A user requirements analysis (URA) was undertaken to determine and appropriate public domain Geographic Information System (GIS) software package for potential integration with NASA's LAS (Land Analysis System) 5.0 image processing system. The necessity for a public domain system was underscored due to the perceived need for source code access and flexibility in tailoring the GIS system to the needs of a heterogenous group of end-users, and to specific constraints imposed by LAS and its user interface, Transportable Applications Executive (TAE). Subsequently, a review was conducted of a variety of public domain GIS candidates, including GRASS 3.0, MOSS, IEMIS, and two university-based packages, IDRISI and KBGIS. The review method was a modified version of the GIS evaluation process, development by the Federal Interagency Coordinating Committee on Digital Cartography. One IEMIS-derivative product, the ALBE (AirLand Battlefield Environment) GIS, emerged as the most promising candidate for integration with LAS. IEMIS (Integrated Emergency Management Information System) was developed by the Federal Emergency Management Agency (FEMA). ALBE GIS is currently under development at the Pacific Northwest Laboratory under contract with the U.S. Army Corps of Engineers' Engineering Topographic Laboratory (ETL). Accordingly, recommendations are offered with respect to a potential LAS/ALBE GIS linkage and with respect to further system enhancements, including coordination with the development of the Spatial Analysis and Modeling System (SAMS) GIS in Goddard's IDM (Intelligent Data Management) developments in Goddard's National Space Science Data Center.

Rochon, Gilbert L.↗

A spatial data handling system for retrieval of images by unrestricted regions of user interest

The Intelligent Data Management (IDM) project at NASA/Goddard Space Flight Center has prototyped an Intelligent Information Fusion System (IIFS), which automatically ingests metadata from remote sensor observations into a large catalog which is directly queryable by end-users. The greatest challenge in the implementation of this catalog was supporting spatially-driven searches, where the user has a possible complex region of interest and wishes to recover those images that overlap all or simply a part of that region. A spatial data management system is described, which is capable of storing and retrieving records of image data regardless of their source. This system was designed and implemented as part of the IIFS catalog. A new data structure, called a hypercylinder, is central to the design. The hypercylinder is specifically tailored for data distributed over the surface of a sphere, such as satellite observations of the Earth or space. Operations on the hypercylinder are regulated by two expert systems. The first governs the ingest of new metadata records, and maintains the efficiency of the data structure as it grows. The second translates, plans, and executes users' spatial queries, performing incremental optimization as partial query results are returned.

Dorfman, Erik↗

Ion drift meter research

The final activity period for the DE project has been particularly productive. This period has seen the final delivery of geophysical data sets to the National Space Science Data Center, the granting of three Ph.D. degrees from cumulative work on the project, the operation of automatic data access and display routines for the data, and an increased effort in research and publication of the data. As before the research activities, largely devoted to studies involving the dynamics of the ionosphere, utilize data from the IDM and the RPA and thus the work is not easily attributable to one or the other of these separately funded efforts. In this final report we provide brief descriptions of the work accomplished in the final phase of the program. The Dynamics Explorer program has provided a significant opportunity for much of the community to participate in the data analysis and interpretation. The data, now residing in the national space science data center, are a great legacy that should continue to yield important results for many years.

Heelis, Roderick A.↗

Experimentally derived resistivity for dielectric samples from the CRRES internal discharge monitor

Resistivity values were experimentally determined using charge storage methods for six samples remaining from the construction of the Internal Discharge Monitor (IDM) flown on the Combined Release and Radiation Effects Satellite (CRRES). Three tests were performed over a period of four to five weeks each in a vacuum of -5x10^-6 torr with an average temperature of -25 (deg)C to simulate a space environment.

spacecraft charging↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Demonstrating Early-Adopter Benefits of Submitting Multiple Trajectory Options for Airlines

A workshop at NASA Ames Research Center was held with airline industry stakeholders to demonstrate the impact of using Trajectory Options Sets (TOSs) during a Collaborative Trajectory Options Program (CTOP) for severe weather operations. The demonstration was conducted using apart-task Human-in-the-Loop (HITL) simulation of the Integrated Demand Management (IDM) concept, which is an air traffic management method that uses CTOP to deliver preconditioned traffic to the Time-Based Flow Management (TBFM) region. The demonstration addressed the following research objectives: first, determine who receives a greater benefit, TOS-participating or TOS-excluded airlines? Second, determine which method of trajectory selection yields a better solution, human/manual selection or automation? Finally, obtain feedback from stakeholders on their impression of the concept and recommendations for future work. The results showed that TOS-participating airlines received greater benefit in terms of total ground delay, ground delay savings, number of reroute options, and additional flight time, compared to TOS-excluded airlines. However, this result was dependent on the situational context, such as the number and location of flights. We found that all airlines benefitted when just a subset of airlines submitted TOS, but the greatest benefit went to the TOS-participating airlines. These benefits to the TOS-participating airlines were diminished as the number of TOS-participants in the system increased. Therefore, there was an “early-adopter” effect that suggested airlines could benefit by becoming the first to equip TOS without causing unfair disadvantages to those who do not equip TOS. In addition, we found that manual selection of trajectory options performed similarly to CTOP, but the CTOP solution was more efficient in terms of number of reroutes, additional flight time, and average ground delay for rerouted flights. Feedback from the stakeholders was solicited, and their overall impressions of the demonstrations were positive. They remarked that CTOP could do a better job than current day solutions, and they thought airlines could benefit from continuing to develop TOS capabilities.

Integrated Demand Management↗

Advancement of isotope separation for the production of reference standards

Idaho National Laboratory (INL) operates a mass separator that is currently producing high purity isotopes for use as internal standards for high precision isotope dilution mass spectrometry (IDMS). In 2008, INL began the revival of the vintage 1970’s era instrument. Advancements thus far include the successful upgrading and development of system components such as the vacuum system, power supplies, ion-producing components, and beam detection equipment. Progress has been made in the separation and collection of isotopic species including those of Ar, Kr, Xe, Sr, and Ba. Particular focuses on ion source improvements and developments have proven successful with demonstrated output beam currents of over 10 micro-amps 138Ba and 350nA 134Ba from a natural abundance source charge (approximately 2.4 percent 134Ba). In order to increase production and collection of relatively high quantities (mg levels) of pure isotopes, several advancements have been made in ion source designs, source material introduction, and beam detection and collection. These advancements and future developments will be presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Survey and Remediation Project at the DOE Bannister Site - 16280

The Department of Energy Kansas City office has operated the Bannister site with a variety of contractors since the late 1940's. This facility has had a number of missions, some of which included using natural and depleted uranium. In order to prepare for the demolition of the site, ANTECH was contracted to perform radiometric surveys of the areas where these uranium operations took place. In the process of performing these surveys, areas with low levels of fixed radioactive contamination were identified; ANTECH then remediated these areas using a variety of techniques. In all areas surveyed, the only radioactive contaminant of interest was uranium and members of its decay chain. In no cases were other radionuclides found. The detection equipment used for the surveys included a Ludlum model 239- 1F Floor Monitor, a Ludlum 2360 Alpha Beta Data Logger Scaler/Ratemeter, and an ORTEC IDM-200-V High Purity Germanium Detector. The Ludlum instruments were used for bulk surveys and the ORTEC instrument was used to determine an accurate radioactive background spectra and subsequent spectra for areas where radioactive contamination was identified. Contamination was located on concrete floors and columns, cinder block walls, steel beams, inside ductwork and in floor drain piping. After these areas were identified, a number of methods were used to remove the contamination for disposal including scabbling, core drilling and wholesale removal. Extensive use of Pentek scabbling equipment on the concrete sections proved to be very effective at removing the contaminated layer. Upon completion, the waste materials were consolidated and packaged in a strong tight sea land container and shipped to the Energy Solutions waste facility in Utah. The completed work at the Bannister site serves as an example and demonstration of an effective and comprehensive decommissioning project. It involved the integration of a variety of decommissioning activities all executed and managed by a single contractor. These included radiometric measurement surveying using a variety of detection technologies to identify and locate uranium contamination, decontamination and removal of low level radioactive waste including some deconstruction activities and finally the management of low level radioactive waste including packaging, consignment and shipping of waste to a remediation site. The effective and efficient identification and removal of radioactive contamination at the Bannister site has contributed to the overall goal of returning the site to unrestricted use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AUTOMATING GROUNDWATER SAMPLING AT HANFORD

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

54 ENVIRONMENTAL SCIENCES↗

Trace impurity analysis in uranium oxide via hybrid quantification techniques—gravimetric standard addition and isotope dilution mass spectrometry

Measurement methods for the analysis of trace impurities in uranium materials, essential in nuclear fuel production and nuclear forensics, are continuously improving. Analytical methods were developed with the goal of lowering uncertainties of next generation certified uranium oxide reference materials for trace impurity concentrations. Through addition of a traceable standard directly into the sample, gravimetric standard addition and isotope dilution followed by analysis on an inductively coupled plasma mass spectrometer can achieve lower uncertainties. In conclusion, results for 28 impurities in CRM 124-1 and 124-6 from NBL Program Office were used for validation of accuracy and comparisons of uncertainties.

36 MATERIALS SCIENCE↗

Application of HRGS for forensic characterization of uranium oxides, pure uranium metals and uranium alloys

A nondestructive iterative method for uranium-bearing material characterization with HRGS developed earlier in (J. appl. Rad. Isotopes, 166 (2020) 109433) is applied to determine matrix densities and uranium isotope masses of a variety of uranium materials, namely uranium ore, UO 2 and U 3 O 8 powders, fuel elements in the form of UO2 microspheres, uranium metal and uranium alloys. It is shown that U 3 O 8 powders with uranium mass fraction of about 84% can be distinguished from the powders of UO 2 with uranium mass fraction of about 87%; uranium products in the form of liquid or loose powder with matrix density of 0.5-2.0 g/cm 3 can be distinguished from uranium products in the form of compacted fuel elements with matrix density of 6.0-10.0 g/cm 3 and from pure metal uranium and uranium alloys with matrix density of 14.0- 19.0 g/cm 3 . In fuel microspheres based on UO2 the uranium mass fraction 88.02% measured by HRGS is consistent, within the measurement uncertainties, with the results of isotope dilution mass spectrometry 87.76±0.64 % and also is confirmed by X-ray diffraction technique. The uranium mass fraction of the uranium ore estimated as 0.08% by HRGS is consistent, within the measurement uncertainties, with the value 0.09±0.01% determined with WDXRF. Densities of two different uranium metal samples, estimated as 18.42 g/cm 3 and 19.33 g/cm 3 by HRGS are consistent with values 18.24±0.55 g/cm 3 and 18.86±0.59 g/cm 3 , respectively, obtained by the gas pycnometry technique.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preserving Ultra-Pure Uranium-233

Uranium-233 ( 233 U) is a synthetic isotope of uranium formed under reactor conditions during neutron capture by natural thorium ( 232 Th). At high purities, this synthetic isotope serves as a crucial reference material for accurately quantifying and characterizing uranium-bearing materials assays and isotopic distributions for domestic and international nuclear safeguards. Separated, high purity 233 U is stored in vaults at Oak Ridge National Laboratory (ORNL). These materials represent a broad spectrum of 233 U from the standpoint of isotopic purity - the purest being crucial for precise analyses in safeguarding uranium.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Required Time of Arrival as a Control Mechanism to Mitigate Uncertainty in Arrival Traffic Demand Management

The objective of this study is to explore the use of Required Time of Arrival (RTA) capability on the flight deck as a control mechanism on arrival traffic management to improve traffic delivery accuracy by mitigating the effect of traffic demand uncertainty. The uncertainties are caused by various factors, such as departure error due to the difference between scheduled departure and the actual take-off time. A simulation study was conducted using the Multi Aircraft Control System (MACS) software, a comprehensive research platform developed in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center. The Crossing Time (CT) performance (i.e. the difference between target crossing time and actual crossing time) of the RTA for uncertainty mitigation during cruise phase was evaluated under the influence of varying two main factors: wind severity (heavy wind vs. mild wind), and wind error (1 hour, 2 hours, and 5 hours wind forecast errors). To examine the CT performance improvement made by the RTA, the comparison to the CT of the aircraft that were not assigned with RTA (Non-RTA) under the influence of the selected factors was also made. The Newark Liberty International Airport (EWR) was chosen for this study. A total 66 inbound traffic to the EWR (34 of them were airborne when the simulation was initiated, 32 were pre-departures at that time) was simulated, where the pre-scripted departure error was assigned to each pre-departure (61 conform to their Expected Departure Clearance Time, which is +-300 seconds of their scheduled departure time). The results of the study show that the delivery accuracy improvement can be achieved by assigning RTA, regardless of the influence of the selected two factors (the wind severity and the wind information inaccuracy). Across all wind variances, 66.9 (265 out of 396) of the CT performance of the RTA assigned aircraft was within +- 60 seconds (i.e. target tolerance range) and 88.9 (352 out of 396) aircraft met +-300 seconds marginal tolerance range, while only 33.6 (133 out of 396) of the Non-RTA assigned aircrafts CT performance achieved the target tolerance range and 75.5 (299 out of 396) stayed within the marginal. Examination of the impact of different error sources i.e. departure error, wind severity, and wind error suggest that although large departure errors can significantly impact the CT performance, the impacts of wind severity and errors were modest relative the targeted +- 60 second conformance range.

required time of arrival (RTA)↗

Integrated Demand Management: The FCA Balancing Algorithm

The Collaborative Trajectory Options Program (CTOP) is a new NextGen function that resides within the FAA’s Traffic Flow Management System (TFMS) software. CTOP was designed to be used in the United States’ national airspace to control the distribution of air traffic demand, both temporally and geographically, through a set of Flow Constrained Areas (FCAs). Each FCA is assigned capacity values that represent an estimated upper limit of manageable demand, and CTOP controls to that capacity by using Expect Departure Clearance Time (EDCT) air traffic control clearances, and/or rerouting flights to an alternate FCA or out of the CTOP completely. CTOP’s decisions about which control options best meet system and user needs are based on the Trajectory Options Set (TOS) submitted by airline operators for each flight. The FCA Balancing Algorithm (FBA) described in this document is a proposed decision support capability that generates CTOP capacity entries for FCAs controlling traffic to a common downstream constraint. The FBA provides an equitable distribution of impact, and addresses the added complexity of assigning FCA capacity values for this specific type of use case, greatly simplifying the FAA air traffic manager’s task.

IDM↗