At least 109 records · Page 6

Erratum to: Impacts of rising air temperatures and emissions mitigation on electricity demand and supply in the United States: a multi-model comparison

The electric power sector both affects and is affected by climate change. Numerous studies highlight the potential of the power sector to reduce greenhouse gas emissions. Yet fewer studies have explored the physical impacts of climate change on the power sector. The present analysis examines how projected rising temperatures affect the demand for and supply of electricity. We apply a common set of temperature projections to three well-known electric sector models in the United States: the US version of the Global Change Assessment Model (GCAM-USA), the Regional Electricity Deployment System model (ReEDS), and the Integrated Planning Model (IPM®). Incorporating the effects of rising temperatures from a control scenario without emission mitigation into the models raises electricity demand by 1.6 to 6.5 % in 2050 with similar changes in emissions. The increase in system costs in the reference scenario to meet this additional demand is comparable to the change in system costs associated with decreasing power sector emissions by approximately 50 % in 2050. This result underscores the importance of adequately incorporating the effects of long-run temperature change in climate policy analysis.

McFarland, James↗

Solving security constrained optimal power flow problems by a structure exploiting interior point method

In this paper we present a new approach to solve the DC (n - 1) security constrained optimal power flow (SCOPF) problem by a structure exploiting interior point solver. Our approach is based on a reformulation of the linearised SCOPF model, in which most matrices that need to be factorized are constant. Hence, most factorizations and a large number of back-solve operations only need to be performed once. However, assembling the Schur complement matrix remains expensive in this scheme. To reduce the effort, we suggest using a preconditioned iterative method to solve the corresponding linear system. We suggest two main schemes to pick a good and robust preconditioner based on combining different “active” contingency scenarios of the SCOPF model. These new schemes are implemented within the object-oriented parallel solver (OOPS), a structure-exploiting primal-dual interior-point implementation. We give results on several SCOPF test problems. The largest example contains 500 buses. We compare the results from the original interior point method (IPM) implementation in OOPS and our new reformulation.

30 DIRECT ENERGY CONVERSION↗

Reliability metrics and their management implications for open pond algae cultivation

The prevalence of contaminating organisms in outdoor algae cultivation, with the often-associated dramatic crop failures, necessitates the need for metrics describing production system reliability. Standard metrics for algae cultivation reliability are critically needed to be able to map improvements in operational parameters, but do not currently exist. In this work, we present a set of standard metrics including mean time to failure (MTTF) and mean time between failures (MTBF) as the basis for the calculation of pond failure rate (FR) and reliability coefficient (RC). Metrics associated with the numbers of contaminating organisms such as abundance ratio (AR), prevalence of infection (PI), and mean intensity of infection (MII) are also relevant. These metrics, based on measured experimental values of outdoor pond performance during the Algae Testbed Public-Private Partnership (ATP3) Unified Field Studies (UFS), provide a basis for quantifying pond failure and provide insight into potential pond management and contaminant mitigation strategies. From these reliability metrics applied to this dataset, we are able to link operational parameters, such as harvest frequency and inoculum source, to pond reliability for different algae strains and seasons, and from an assessment of AR, provide contamination thresholds beyond which a culture may be unrecoverable. Ultimately, the implementation of widely-practiced and simple-to-calculate algae pond reliability metrics calculated from rapid and easy to collect data or observations will reduce risk and uncertainty in large-scale algae deployment and aid in the development of integrated pest management (IPM) strategies.

09 BIOMASS FUELS↗

Rare‐Earth Reduction in High‐Speed PM‐Assisted Synchronous Reluctance Motors Using Hybrid Magnet Strategies and Design Optimisation for 800 V EVs

The trend towards electrifying transportation systems has stimulated research endeavours aimed at developing electric machines that are not only high speed and efficient but also low‐cost and compact. To support this transition, the US Department of Energy (DOE) has established ambitious targets of $7/kW cost and 12 kW/L power density for the electric drivetrains. This paper attempts to meet these targets by proposing high‐speed permanent magnet assisted synchronous reluctance machine (PMASynRM) topologies enabled by hybrid magnet strategies, combining rare‐earth (RE) magnets with low‐cost, RE‐free alternatives. Modified 2‐layer and 3‐layer U‐shaped rotor configurations, featuring structural reinforcements to withstand high mechanical stress at elevated speeds, are developed. A multi‐objective design optimisation framework is employed to optimise the rotor design, targeting reductions in RE magnet volume, magnet demagnetisation risk and torque ripple while achieving the desired electromagnetic performance. A comprehensive analysis of the optimised rotor designs, compared against a 16,000 rpm, 800 V baseline IPM motor, shows over 70% RE reduction, demagnetisation risk below 3.5% and torque ripple under 10%. Detailed analyses of performance trends across various magnet combinations and rotor configurations highlight the viability of hybrid magnet PMASynRM designs as cost‐effective, robust and energy‐efficient solutions for next‐generation EVs.

33 ADVANCED PROPULSION SYSTEMS↗

Laboratory reflectometer for the investigation of optical elements in a wavelength range of 5–50 nm: description and testing results

We describe a laboratory reflectometer developed at the IPM RAS for precision measurements of spectral and angular dependences of the reflection and transmission coefficients of optical elements in a wavelength range of 5–50 nm. The radiation is monochromatised using a high-resolution Czerny–Turner spectrometer with a plane diffraction grating and two spherical collimating mirrors. A toroidal mirror focuses the probe monochromatic beam on a sample. The X-ray source is a highly ionised plasma produced in the interaction of a high-power laser beam with a solid target at an intensity of 10{sup 11}–10{sup 12} W cm{sup –2}. To stabilise the emission characteristics, the target executes translatory and rotary motions in such a way that every pulse irradiates a new spot. The short-focus lens is protected from contamination by erosion products with the use of a specially designed electromagnetic system. The samples under study are mounted on a goniometer is accommodated in a dedicated chamber, which provides five degrees of freedom for samples up to 500 mm in diameter and two degrees of freedom for a detector. The sample mass may range up to 10 kg. The X-ray radiation is recorded with a detector composed of a CsI photocathode and two microchannel plates. A similar detector monitors the probe beam intensity. The spectral reflectometer resolution is equal to 0.030 nm with the use of ruled gratings with a density of 900 lines mm{sup –1} (spectral range: 5–20 nm) and to 0.067 nm for holographic gratings with a density of 400 lines mm{sup –1} (spectral range: 10–50 nm). We analyse the contribution of higher diffraction orders to the probe signal intensity and the ways of taking it into account in the measurements. Examples are given which serve to illustrate the reflectometer application to the study of multilayer mirrors and filters. (paper)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Simultaneous Compensation of Third-Order Resonances at the FNAL Recycler Ring

Third-order resonance lines will have a detrimental effect on the high-intensity operation of the Recycler Ring (RR), under the current Proton Improvement Plan (PIP-II) for the Fermilab Accelerator Complex. Increasing intensity will increase space charge effects, leading to the excitation of normal and skew sextupole lines. Dedicated normal and skew sextupoles have been installed in order to mitigate the effect of these resonance lines. By measuring the response matrix of the third-order Resonance Driving Terms (RDTs) to the currents of these dedicated elements, this study shows how several resonance lines can be compensated simultaneously. Resonance compensation is experimentally verified through loss maps and emittance growth measurements using the Ion Profile Monitor (IPM) system in the Recycler.

43 PARTICLE ACCELERATORS↗

Benchmarking the Use of BPM Quadrupole Moments to Measure Emittance

For the PIP-II program, transverse emittance in the Fermilab Booster must remain well controlled at higher bunch intensities. 4-plate beam position monitors (BPMs) have a small but measurable quadrupole moment, making it possible to infer transverse emittance. By compositing many BPMs together, it becomes possible to improve the quality of the quadrupole signal. The Fermilab Booster BPM system has been used to measure these quadrupole moments in the past year and derive emittances from them. Recent benchmarks show that the derived BPM emittances show similar emittance evolution and value to IPM and Multiwire data. This approach can both supplement and complement existing non-intercepting emittance monitors in accelerators.

Balcewicz, M. A. [Fermilab]↗

Polarization Issues in Run 2008

The RHIC proton beam polarization has a strong dependence on intensity in Run 2008, whereas the dependence is almost absent in Run 2006. Meanwhile, the RHIC beam transverse emittance also has a dependence on intensity in Run 2008, but little in Run 2006. Using the emittance measurement at the AGS IPM and the BtA multiwires, the source of this difference between 2006 and 2008 runs is traced to the Booster. It is found that at least the degree of the vertical scraping in the Booster is different in 2006 and 2008. The effect of this scraping for the RHIC beam emittance and polarization is studied.

43 PARTICLE ACCELERATORS↗

Evaluation of Molybdenum as a Surrogate for Iridium in the GPHS Weld Development

The welding equipment used for welding iridium containers (clads) at Los Alamos National Laboratory is twenty five years old and is undergoing an upgrade. With the upgrade, there is a requirement for requalification of the welding process, and the opportunity for process improvement. Testing of the new system and requalification will require several welds on iridium test parts and clads, and any efforts to improve the process will add to the need for iridium parts. The extreme high cost of iridium imposes a severe limitation on the extent of test welding that can be done. The 2 inch diameter, 0.027 inch thick, iridium blank disc that the clad cup is formed from, is useful for initial weld trials, but it costs $5000. The development clad sets needed for final tests and requalification cost $15,000 per set. A solution to iridium cost issue would be to do the majority of the weld development on a less expensive surrogate metal with similar weld characteristics. One such metal is molybdenum. Since its melting index (melting temperature x thermal conductivity) is closest to iridium, welds on molybdenum should be similar in size for a given weld power level. Molybdenum is inexpensive; a single 2 inch molybdenum disc costs only $9. In order to evaluate molybdenum as a surrogate for iridium, GTA welds were first developed to provide full penetration on 0.030 inch thick molybdenum discs at speeds of 20, 25, and 30 inches per minute (ipm). These weld parameters were then repeated on the standard 0.027 inch thick iridium blanks. The top surface and bottom surface (root) width and grain structure of the molybdenum and iridium welds were compared, and similarities were evident between the two metals. Due to material and thickness differences, the iridium welds were approximately 35% wider than the molybdenum welds. A reduction in iridium weld current of 35% produce welds slightly smaller than the molybdenum welds yet showed that current could be scaled according to molybdenum/iridium weld width ratio to achieve similar welds. Further weld trials using various thicknesses of molybdenum determined that 0.024 inch thick molybdenum material would best match the 0.027 inch thick iridium in achieving comparable welds when using the same welding parameters. Across the range of welding speeds, the characteristic weld pool shape and solidification grain structure in the two materials was also similar. With the similarity of welding characteristics confirmed, and the appropriate thickness of molybdenum determined, it has been concluded that the use of molybdenum discs and tube sections will greatly expand the weld testing opportunities prior to iridium weld qualification

Engineering(42)↗

RHIC Polarization Decay in FY15 pp Run due to Polarization Profile Development

The decay over time of ratio between polarization profile and beam profile has been analyzed previously. A follow up question is if we can get the decay of polarization profile and beam profile separately. With the beam profiles obtained from Ion Profile Monitor (IPM), this analysis was done and the results are analyzed. The results show that the contribution from polarization profile and beam profile is similar for yellow ring, but the contribution from polarization profile is much stronger in blue ring, which is consistent with lower polarization Blue ring.

43 PARTICLE ACCELERATORS↗

AGS vertical beta function measurements for Run 15

One key parameter for running the AGS efficiently is by maintaining a low emittance. To measure emittance, one needs to measure the beta function throughout the cycle. This can be done by measuring the beta function at the ionization profile monitors (IPM) in the AGS. This tech note delves into the motivation, the measurement, and some strides that were made throughout Run15.

43 PARTICLE ACCELERATORS↗

Improvement of screen-printable metallization paste for low-cost silicon solar cells utilizing silver coated copper powders

This aims of this project were to develop low-cost screen-printable Ag|Cu metallization, as alternative to Ag paste, for contacting PERC solar cells with transparent emitter for high performance and reliability. The intended goal was to achieve 81% fill factor with a screen-printable Ag|Cu paste alternative. This was attempted through a three strand approach including Ag|Cu formulation by SVMT, production using cavitation technology by ACI and contact formation through the understanding of (i) the liquid phase sintering of the nano/macro particles of Ag|Cu to achieve bulk metal with very low series resistance, (ii) optimization of contact firing to avoid penetration of Cu into the silicon bulk, and finally (iii) proper analysis to quantify the contributions of each resistance component and keep the total series resistance at 0.2 Ω-cm2, which would result in high fill factor of 81% by UNC Charlotte. The objectives also involved i) the implementation of glass frit with Cu metal that will etch through the ARC for low contact resistance and adhesion, ii) development of Ag|Cu pastes with the optimized glass frit, iii) investigation of the impact of Cu particle size, morphology and loading on the gridline resistance, iv) narrow gridline screen designs along with narrow gridline prints, v) development of fast belt speeds of up to 375 inches per minute (ipm) sintering, and vi) stability study on Ag|Cu contact to high performance and reliability.

14 SOLAR ENERGY↗

Benchmarking the Use of BPM Quadrupole Moments to Measure Emittance

For the PIP-II program, transverse emittance in the Fermilab Booster must remain well controlled at higher bunch intensities. 4-plate beam position monitors (BPMs) have a small but measurable quadrupole moment, making it possible to infer transverse emittance. By compositing many BPMs together, it becomes possible to improve the quality of the quadrupole signal. The Fermilab Booster BPM system has been used to measure these quadrupole moments in the past year and derive emittances from them. Recent benchmarks show that the derived BPM emittances show similar emittance evolution and value to IPM and Multiwire data. This approach can both supplement and complement existing non-intercepting emittance monitors in accelerators.

Balcewicz, Michael A. [Fermilab] (ORCID:0009000557↗

Polarization Issues in Run 2008

The RHIC proton beam polarization has a strong dependence on intensity in Run 2008, whereas the dependence is almost absent in Run 2006. Meanwhile, the RHIC beam transverse emittance also has a dependence on intensity in Run 2008, but little in Run 2006. Using the emittance measurement at the AGS IPM and the BtA multiwires, the source of this difference between 2006 and 2008 runs is traced to the Booster. It is found that at least the degree of the vertical scraping in the Booster is different in 2006 and 2008. The effect of this scraping for the RHIC beam emittance and polarization is studied.

43 PARTICLE ACCELERATORS↗

Piperitone ( p -Menth-1-En-3-One): A New Repellent for Tea Shot Hole Borer (Coleoptera: Curculionidae) in Florida Avocado Groves

The tea shot hole borer, Euwallacea perbrevis, has been recently established in Florida, USA, where it vectors fungal pathogens that cause Fusarium dieback in avocado. Pest monitoring uses a two-component lure containing quercivorol and α-copaene. Incorporation of a repellent into IPM programs may reduce the incidence of dieback in avocado groves, particularly if combined with lures in a push–pull system. This study evaluated piperitone and α-farnesene as potential repellents for E. perbrevis, comparing their efficacy to that of verbenone. Replicate 12-week field tests were conducted in commercial avocado groves. Each test compared beetle captures in traps baited with two-component lures versus captures in traps containing lures plus repellent. To complement field trials, Super-Q collections followed by GC analyses were performed to quantify emissions from repellent dispensers field-aged for 12 weeks. Electroantennography (EAG) was also used to measure beetle olfactory response to each repellent. Results indicated that α-farnesene was ineffective; however, piperitone and verbenone were comparable in repellency, achieving 50–70% reduction in captures, with longevity of 10–12 weeks. EAG responses to piperitone and verbenone were equivalent, and significantly greater than response to α-farnesene. Since piperitone is less expensive than verbenone, this study identifies a potential new E. perbrevis repellent.

59 BASIC BIOLOGICAL SCIENCES↗

Third generation residual gas ionization profile monitors at Fermilab

The latest generation of IPMs installed in the Fermilab Main Injector and Recycler incorporate a 1 kG permanent magnet, a newly designed high-gain, rad-tolerant preamp, and a control grid to moderate the charge that is allowed to arrive on the anode pick-up strips. The control grid is intended to select a single Booster batch measurement per turn. Initially it is being used to allow for a faster turn-on of a single, high-intensity cycle in either machine. The expectation is that this will extend the Micro Channel Plate lifetime, which is the high-cost consumable in the measurement system. We discuss the new design and data acquired with this system.

Zagel, J. R.↗

The Compton-Getting effect for low energy particles

It was found that the traditional first-order Compton-Getting effect, which relates particle distributions as observed in two frames of reference moving with constant relative velocity, is inadequate for the description of low energy particles (less than a few hundred keV/nucleon) in the solar system. An exact procedure is given for recovering both isotropic and anisotropic distributions in the solar wind frame from observations made in a spacecraft frame. The method was illustrated by analyzing a particle event observed on IPM-7.

Ipavich, F. M.↗

Measurement of klystron phase modulation due to ac-powered filaments

A technique for determining the intermodulation components in the RF spectrum of the S-band radar transmitter generated by having the klystron filaments heated by 400-Hz ac power is described. When the klystron is being operated with 400-Hz (ac) on the filament, the IPM is buried in the 400-Hz equipment interference noise. The modulation sidebands were separated and identified and found to be-67 db below the main carrier. This is well below the transmitter specifications, and operating the filaments on ac would not degrade the spectrum to where it would be detrimental to the radiated RF.

Finnegan, E. J.↗