Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

NASA’s Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress through FY 2024

The National Aeronautics and Space Administration (NASA) Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center (GSFC) has been developing technology to robotically refuel both heritage and recently developed satellites on-orbit funded through NASA’s Space Technology Mission Directorate (STMD). The On-orbit Servicing, Assembly, and Manufacturing 1 (OSAM-1) mission, formerly known as Restore-L, developed a system to refuel a satellite in space and assemble a communications antenna. By demonstrating these capabilities, the mission would advance never-before tested technologies for use in future missions (by NASA, other government organizations, and private industries). The purpose of this paper is to capture the lessons learned from the hardware development of the OSAM-1 Propellant Transfer System (PTS) that are highly relevant for the ISAM community. This paper covers a review of in-space servicing extensibility and critical technologies that were being developed within NExIS, focusing on the fluid transfer refueling technology within the framework of the OSAM-1 PTS. An overview of the technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 2018, 2019 and 2020. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Final assembly, qualification, and functional tests along with installation and acceptance testing of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. Technology development, challenges, lessons learned, along with installation and testing results are discussed, with particular focus on the OSAM-1 assemblies including the PTA and HMA. In addition, testing utilizing the integrated flight simulator test setups will be summarized. The OSAM-1 PTS made great strides in advancing in-space refueling technology; however, there are unfinished development efforts remaining. This paper concludes with a brief summary of the technology shortfalls (gaps) that remain in the key areas of in-space fluid transfer.

ISAM↗

Production and installation of wavelength-shifting reflective light enhancers for the Short-Baseline Near Detector

We report on the design, production, and installation of a wavelength-shifting reflective system on the cathode of the Short-Baseline Near Detector (SBND), a liquid argon time projection chamber located along the Fermilab Booster Neutrino Beam. To increase and homogenize scintillation-light collection, 64 double-sided plates were fabricated from FR4, laminated with specular reflector film and coated with 300 $μ$g/cm$^2$ of tetraphenyl butadiene (TPB) wavelength shifter using controlled physical vapor deposition. The coating uniformity was validated through dedicated measurements of deposited mass and profilometry studies. Because exposure to ambient blue/UV light could degrade the TPB, protective filtering and controlled storage conditions were implemented during handling and installation. The coated plates were assembled between conductive meshes for high-voltage compatibility and installed in situ during detector integration. This system constitutes the largest TPB-coated area deployed in a neutrino detector. It operates in conjunction with SBND's photon detection system, which consists of photomultiplier tubes and X-ARAPUCAs. Early light-collection measurements show high uniformity and light response across the detector, supporting improved triggering, calorimetry, and position reconstruction in SBND.

Acciarri, R. [Fermilab]↗

STS-112 Crew Interviews: Yurchikhin

A preflight interview with mission specialist Fyodor Yurchikhin is presented. He worked for a long time in Energia in the Russian Mission Control Center (MCC). Yurchikhin discusses the main goal of the STS-112 flight, which is to install the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) on the International Space Station. He also talks about the three space walks required to install the S1. After the installation of S1, work with the bolts and cameras are performed. Yurchikhin is involved in working with nitrogen and ammonia jumpers. He expresses the complexity of his work, but says that he and the other crew members are ready for the challenge.

Source record↗

Automated Fissile Mass Estimation Python Script for the Advanced Experimental Fuel Counter (AEFC)

The Advanced Experimental Fuel Counter (AEFC) is a non-destructive assay (NDA) instrument developed to quantify the residual fissile mass in research reactor spent fuel assemblies. The system is installed in a spent fuel pool and measurements are acquired underwater. A calibration curve relates the totals and coincidence counting signal from active interrogation of the spent fuel assemblies to the fissile mass remaining in the fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results of EVA/mobile transporter space station truss assembly tests

Underwater neutral buoyance tests were conducted to evaluate the use of a Mobile Transporter concept in conjunction with EVA astronauts to construct the Space Station Freedom truss structure. A three-bay orthogonal tetrahedral truss configuration with a 15 foot square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices (mobile foot restraints). The average unit assembly time (which included integrated installation of utility trays) was 27.6 s/strut, or 6 min/bay. The results of these tests indicate that EVA assembly of space station size structures can be significantly enhanced when using a Mobile Transporter equipped with astronaut positioning devices. Rapid assembly time can be expected and are dependent primarily on the rate of translation permissible for on-orbit operations. The concept used to demonstate integrated installation of utility trays requires minimal EVA handling and consequentially, as the results show, has little impact on overall assembly time.

Watson, Judith J.↗

Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

Next generation retrofit wall panels with integrated vacuum insulation panels

Approximately two-thirds of residential buildings in the United States were constructed before the Department of Energy established energy conservation measures. These buildings present major opportunities for improving energy efficiency, though retrofitting them remains technically and economically challenging. This study presents the development and the durability evaluation of an innovative retrofit panel system that integrates vacuum insulation panels (VIP) with a nail-base panel (called a retrofit insulated panel) to enhance thermal performance with minimal disruption to occupants and without altering standard nail-based panel installation practices. Hygrothermal simulations were conducted to assess the moisture behavior of wall assemblies before and after retrofit installation under varying water vapor control strategies and climate conditions. Results indicate that, with appropriate moisture control strategy, the retrofit system effectively prevents moisture accumulation, keeping mold index values and relative humidity levels below critical thresholds. Additionally, Guarded Hot Box testing was performed to compute the effective R-value of the panel under different coverage areas that demonstrates its effectiveness in enhancing both thermal and moisture performance in existing residential buildings.

Iffa, Emishaw [ORNL]↗

Design and development of pressure and repressurization purge system for reusable space shuttle multilayer insulation system

The manufacturing tasks for the program included the fabrication and assembly of an epoxy fiberglass purge bag to encapsulate an insulated cryogenic propellant tank. Purge, repressurization and venting hardware were procured and installed on the purge bag assembly in preparation for performance testing. The fabrication and installation of the superfloc multilayer insulation (MLI) on the cryogenic tank was accomplished as part of a continuing program. An abstraction of the results of the MLI fabrication task is included to describe the complete fabrication requirements for a reusable cryogenic propellant space storage system.

Source record↗

The ProtoDUNE-SP LArTPC electronics production, commissioning, and performance

The ProtoDUNE-SP detector is a large-scale prototype of the Single-Phase (SP) Liquid Argon Time Projection Chamber (LArTPC) design proposed for the Deep Underground Neutrino Experiment (DUNE). 15,360 LArTPC wires are instrumented with low electronic noise pre-amplifier and digitization ASICs integrated into Front End Motherboards (FEMBs) operating at cryogenic temperature within the cryostat. The large number of electronics channels and high performance specifications required a large-scale production electronics quality control effort, careful installation into Anode Plane Assemblies (APAs), and rigorous detector commissioning. This successful collaboration-wide effort achieved a working LArTPC electronics channel percentage of 99.7% (15,318 of 15,360 channels in total), whose operating performance exceeded expectations. We summarize the ProtoDUNE-SP cold electronics design and quality control, installation, and commissioning efforts that enabled this excellent electronics performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Thermal Hydraulic Experimental Test Article - Report of THETA Commissioning for METL Testing

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, [1], further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned before installing into METL test vessel #4. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Installation and checkout of the DOE/NASA Mod-1 2000-kW wind turbine generator

The paper describes the DOE/NASA Mod-1 wind turbine generator, its assembly and testing, and its installation at Boone, North Carolina. The paper concludes with performance data taken during the initial tests conducted on the machine. The successful installation and initial operation of the Mod-1 wind turbine generator has had the following results: (1) megawatt-size wind turbines can be operated satisfactorily on utility grids; (2) the structural loads can be predicted by existing codes; (3) assembly of the machine on top of the tower presents no major problem; (4) large blades 100 ft long can be transported long distances and over mountain roads; and (5) operating experience and performance data will contribute substantially to the design of future low-cost wind turbines.

Puthoff, R. L.↗

Mars Ecopoiesis Testbed

Mars surface conditions where liquid water is absent were simulated for the purposes of laboratory research. A pressure-temperature (P-T) profile was maintained in which no combination of pressure or temperature corresponds to the liquid region of the water phase diagram. The triple point of pure water occurs at T = 0.1oC and P(H2O) = 6.01 mbar; therefore all temperatures and pressures must be kept below these values, respectively. A 35-day test was performed in a commercial planetary simulation system (Techshot, Inc., Greenville, IN) in which the minimum night-time temperature was -80oC, the maximum daytime temperature was +26oC, the simulated day-night light cycle in earth hours was 12-on and 12-off, and the total pressure of the pure CO2 atmosphere was maintained below 11 mbar. Any water present was allowed to equilibrate with the changing temperature and pressure. The gas phase was sampled into a CR1-A condensation-mirror low-pressure hygrometer, which uses liquid nitrogen (down to 77oK) to determine the dew point (Buck Technologies, Boulder, CO). Dew point was measured once every hour and recorded on a data logger, along with the varying temperature in the chamber, from which the partial pressure of water was calculated. The resulting calculated daily cycles were tracked on the water P-T diagram, and no points were found to fall within the liquid-phase region of the diagram. It is concluded that there was no liquid water present throughout the test except during the initial pump-down period when aqueous specimens were introduced on the first day (less than 1 hour). Mars regolith simulant was present during this test, and further investigation is needed to determine whether liquid water could have been present or absent in the regolith in the form of brine. Biological samples consisting of Cyanobacteria: Anabena sp., Chroococcidiopsis CCMEE171, Plectonema boryanum; Eubacteria: Bacillus subtilis, Pseudomonas aeruginosa, and Eukaryota: Chlorella ellipsoidia were maintained in the simulator under the above-described conditions. The exposed specimens were tested for intracellular esterase activity, chlorophyll content (where appropriate) and reproductive survival. All tests yielded low-level positive results in all cases. In parallel to these terrestrial studies a planned design study was undertaken for the proposed test bed. Design requirements include compact assembly for transport and installation on the planetary surface (multiple units per mission would be expected), protective internal package for the release of organisms, a means of atmosphere exchange, access to sunlight, a means of penetrating the planetary surface, and most importantly a means of acquiring regolith while meeting the requirements of planetary protection. In consultation with advisers a design was created, and a large-scale mock-up of this design was fabricated by additive manufacturing at Techshot, Inc. with moving parts that simulated the components of the design. The mock-up assembly has been demonstrated to interested parties. A means of detecting live metabolism will also be included in the test bed. Several options were reviewed, and it is concluded that, by the time the ecopoiesis test bed is ready for testing the optimum instrument will be the equivalent of a hand-held mass spectrometer for metabolic gas analysis. This will maximize versatility and reveal much more information than could a detector of a single product (such as molecular oxygen), and the

Ecopoiesis↗

Itegrated Test and Evaluation of a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removtal System (CDRA), Mechanical Compressor Engineering Development Unit (EDU), and Sabitier Engineering Development Unit (EDU)

Currently on the International Space Station s (ISS) U.S. Segment, carbon dioxide (CO2) scrubbed from the cabin by a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removal Assembly (CDRA) is vented overboard as a waste product. Likewise, the product hydrogen (H2) that will be generated by the Oxygen Generation Assembly (OGA) planned for installation will also be vented. A flight experiment has been proposed that will take the waste CO2 removed from the cabin, and via the catalytic Sabatier process, reduce it with waste H2 to generate water and methane. The water produced may provide cost and logistics savings for ISS by reducing the amount of water periodically re-supplied to orbit. To make this concept viable, a mechanical piston compressor and accumulator were developed for collecting and storing the CO2 from the CDRA. The compressor, accumulator and Sabatier system would be packaged together as one unit and referred to as the Carbon Dioxide Reduction Assembly (CRA). Testing was required to evaluate the performance of a 4BMS CDRA, compressor, accumulator, and Sabatier performance along with their operating rules when integrated together. This had been numerically modeled and simulated; however, testing was necessary to verify the results from the engineering analyses. Testing also allowed a better understanding of the practical inefficiencies and control issues involved in a fully integrated system versus the theoretical ideals in the model. This paper presents and discusses the results of an integrated engineering development unit test.

Knox, James C.↗

RG217 V2-V2 Coaxial Cable Acceptance Test

The ECSE Solid State Pulsed Power unit is a high current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the testing procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This test procedure verifies the cable is undamaged and assembled correctly, the correct cable connectors are installed properly onto the cable, and that the entire assembly meets conductivity and holdoff voltage requirements. This procedure will verify that the RG217 Coaxial Cable Assembly meets all assembly and functional requirements. In particular, this procedure verifies the Cable Shield and Center Conductor meet conductivity requirements by testing their resistances. Additionally, this procedure ensures the RG217 Coaxial Cable Assembly meets holdoff voltage requirements by applying high voltage and verifying the RG217 Coaxial Cable Assembly does not experience any breakdowns or arcing.

42 ENGINEERING↗

Development and testing of a fission-like neutron field for dosimetry and instrument calibrations based on deuterium-tritium generator

For nearly five decades 252 Cf sources have been used for testing and calibration over a wide range of neutron detection devices used for nuclear safety and radiation protection. However, the vastly increased cost of 252 Cf sources, its short half-life, and concerns about future shortage have prompted nuclear facilities and radiological calibration laboratories that rely on high-intensity neutron sources to seek alternatives. There appear to be no other radionuclide neutron sources that would match “like-to-like” 252 Cf performance characteristics. Alternatives of producing a fission-like neutron spectrum based on commercially available deuterium-tritium (D-T) generators, and without any fissionable materials or beryllium, have been explored. This paper describes efforts of designing the spectrum shaping assembly, its construction and installation. The produced neutron field was evaluated both from the perspective of the neutron fluence spectrum and the resulting dosimetric outcome. Finally, it was tested for practical application by examining response of various health physics instruments and personal monitoring devices in comparison to the response of those devices when exposed to 252 Cf. In conclusion, the response of survey-type instruments tested within the prototype, surrogate fission, reference field are acceptably close to their response in the targeted 252 Cf field.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Computer Vision Techniques Used to Monitor the Alignment of Cavities and Solenoids in the PIP-II Prototype SSR1 Cryomodule

The alignment of the SRF PIP-II string components is studied as the acceptable beam deflection, offset and defocusing, which may otherwise cause beam loss. Simulations and measurements established that the maximum deviation of the beam pipe from the reference orbit should not exceed a small fraction of the beam aperture. To observe the translations and rotations of each single component within the cryomodule, optical instruments (H-BCAM) surveying highly reflective targets, installed in the internal assembly of the module were used. The alignment monitoring concept for the PIP II SSR1 prototype cryomodule, along with relevant measurements of the components’ position monitoring during coldmass cooldown is presented in this contribution. This development paves the way to new computer vision applications in the field of cryomodule assemblies in cleanroom environment, in which robotically-assisted operations have the potential to dramatically reduce the risk of chemical and particulate contamination.

43 PARTICLE ACCELERATORS↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗