Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrable systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Performance test of the integrator system for magnetic diagnostics in KSTAR

Ten modules of the integrator system of the initial magnetic diagnostics for the first plasma operation have been simultaneously tested in the Korea superconducting tokamak advanced research device by measuring the magnetic flux density from various magnetic diagnostics sensors when a small current was applied to the superconducting poloidal field coils. The measured drifts from the integrators show between 1x10{sup -6} and 1x10{sup -5} Wb/s. The results from the field tests before the first plasma generation are described.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Examples of Integrable Systems with Dissipation on the Tangent Bundles of Multidimensional Spheres

In many problems of multidimensional dynamics, systems appear whose state spaces are spheres of finite dimension. Clearly, phase spaces of such systems are tangent bundles of these spheres. In this paper, we examine nonconservative force fields in the dynamics of a multidimensional rigid body in which the system possesses a complete set of first integrals that can be expressed as finite combinations of elementary transcendental functions. We consider the case where the moment of nonconservative forces depends on the tensor of angular velocity.

97 MATHEMATICS AND COMPUTING↗

PRISMA: PARALLEL REFINEMENT AND INTEGRATION SYSTEM FOR MULTI-AZIMUTHAL ANALYSIS

The Parallel Refinement and Integration System for Multi-azimuthal Analysis (PRISMA, version 1.1.0) is a Python application for processing X-ray diffraction (XRD) image data. PRISMA wraps GSAS-II to perform azimuthally-binned peak refinement, computes per-frame strain and d-spacing from those fits, and provides three PyQt5 graphical interfaces: (1) a Recipe Builder for selecting GSAS-II control (.imctrl) files, optional mask (.immask) files or threshold-ased masking, reference and experiment image sets, peaks, zimuthal range and bin size, and an optional ceria-based auto-calibration; (2) a Batch Processor that uses Dask on local workstations and pure MPI (mpi4py.futures.MPICommExecutor) on HPC to distribute GSAS-II refinement across cores or compute nodes and write results to a 4-dimensional (peaks x frames x azimuths x measurements) Zarr dataset; and (3) a Data Analyzer that renders heatmaps of fit parameters, strain, frame-to-frame deltas, and percent-change-vs-reference, and exports user-defined subsections to CSV or Excel. The peak-refinement algorithm is deterministic. Benchmark on ALCF Crux: a 20,000-image set, single-peak fit in frame mode with 44 azimuthal bins on 128 nodes x 128 workers, 48 seconds total wall time.

Lorenzo Martin, Maria De La Cinta [Argonne Nationa↗

Energy Systems Integration Facility Stewardship Summary: Fiscal Year 2025

A summary of NLR's stewardship of the nationally unique Energy Systems Integration Facility (ESIF) highlighting performance metrics, capability upgrades, and examples of R&D impact. 2025 brought a national focus on energy and ESIF is meeting the moment. All eyes are on data centers and domestic manufacturing and bringing the benefits of artificial intelligence to power system planning and operations. In step with national priorities, ESIF is building out capabilities that advance secure, reliable, and affordable power. ESIF hosted 190 multidisciplinary research projects, 855 high-performance computer users, and collaborated with 81 partners from industry, academia, research, and federal agencies. These research projects resulted in an AI method for detecting high-impedance faults with 90% accuracy, a grid controls demonstration in Connecticut, power quality validation of CorePower's flagship inductor, and a cybersecurity assessment of potential rogue capabilities in digitally connected energy devices. Facility infrastructure improvements enhanced the thermal research network, the SCADA system, the cyber range, power hardware-in-the-loop testing, and more. With support from the U.S Department of Energy (DOE), the ESIF laboratories continue to deliver leading solutions for secure, reliable, and affordable power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience Measurement Framework For Post-deployment Artificial Intelligence (ai) Integrated Systems

Resilience is largely defined as the ability to adapt or recover from adverse conditions, stresses, attacks, or compromises on systems that use or are enabled by digital resources. In Artificial Intelligence Management and Research for Advanced Networked Testbed Hub (AMARANTH), resilience is measured in the amount of time it took from the beginning of a testing period for the model to reach predictions outside of the original 95% confidence interval or using the Kullback-Leibler (KL) divergence theorem, the Population Stability Index (PSI), and traditional methods such as root mean squared error (RMSE) threshold. Artificial Intelligence (AI) model drift is of significant concern when deploying AI-integrated systems into critical and/or secure environments. Drift can impact resilience of the AI-integrated system post-deployment and requires consistent maintenance and upkeep to ensure the model is accurate and precise. To quantify model drift and predict the point when a model's drift becomes unacceptable, we describe using Kullback-Leibler (KL) divergence, Population Stability Index (PSI) and/or confidence interval width estimations to determine the point of failure and time to failure of a model post-deployment. Through simple code functions, the KL-divergence, PSI, confidence interval, and root mean squared (RMSE) point of failures can be used to derive when a model needs to be maintained as well as the impact of adversarial action through statistical means.

Yockey, Patience [Idaho National Laboratory (INL),↗

Energy Systems Integration: NREL + Solectria (Fact Sheet)

This fact sheet describes the collaboration between NREL and Solectria at the Energy Systems Integration Facility (ESIF) to to develop 500- and 750-kilowatt photovoltaic (PV) inverters with advanced features that can support the electric grid.

14 SOLAR ENERGY↗

On a Future for Smart Inverters with Integrated System Functions

The modern electric power grid is gradually evolving to include high penetration power electronics in a distributed architecture which will pose pressing new challenges on power quality, system control, and operation. The state-of-the-art smart inverters for solar photovoltaics may not be sufficient to address some of the stability and control challenges such as harmonic resonances due to the interactions of multiple power electronics converters. This paper discusses a future of smart inverters with integrated system functions and its associated challenges, and identifies smart inverter research trends and features in the context of flexible control architectures. Future power electronics research will shift from hardware solutions to more control solutions with integrated system functions under distributed power grid scenarios with small-scale power electronics interfaced with distributed generations and loads.

Xue, Yaosuo↗

Energy Systems Integration Facility Stewardship Summary: Fiscal Year 2024

A summary of NREL's good stewardship of the nationally unique Energy Systems Integration Facility (ESIF) highlighting performance metrics, infrastructure upgrades, and examples of R&D impact. In fiscal year 2024, we developed advanced energy security and resilience capabilities as we built a new test bed for power electronics and completed a 1-megawatt platform for studying energy systems with grid-forming inverters. Researchers collaborated with utilities, manufacturers, and communities to solve their pressing questions, such as a control architecture that heralds a new direction for distributed energy management systems. With support from the U.S Department of Energy (DOE), the work in the ESIF laboratories continues to advance national goals for resilient and affordable energy.

annual report↗

The circular bioeconomy: a driver for system integration

Background: Human and earth system modeling, traditionally centered on the interplay between the energy system and the atmosphere, are facing a paradigm shift. The Intergovernmental Panel on Climate Change’s mandate for comprehensive, cross-sectoral climate action emphasizes avoiding the vulnerabilities of narrow sectoral approaches. Our study explores the circular bioeconomy, highlighting the intricate interconnections among agriculture, forestry, aquaculture, technological advancements, and ecological recycling. Collectively, these sectors play a pivotal role in supplying essential resources to meet the food, material, and energy needs of a growing global population. We pose the pertinent question of what it takes to integrate these multifaceted sectors into a new era of holistic systems thinking and planning. Results: The foundation for discussion is provided by a novel graphical representation encompassing statistical data on food, materials, energy flows, and circularity. This representation aids in constructing an inventory of technological advancements and climate actions that have the potential to significantly reshape the structure and scale of the economic metabolism in the coming decades. In this context, the three dominant mega-trends—population dynamics, economic developments, and the climate crisis—compel us to address the potential consequences of the identified actions, all of which fall under the four categories of substitution, efficiency, sufficiency, and reliability measures. Substitution and efficiency measures currently dominate systems modeling. Including novel bio-based processes and circularity aspects might require only expanded system boundaries. Conversely, paradigm shifts in systems engineering are expected to center on sufficiency and reliability actions. Effectively assessing the impact of sufficiency measures will necessitate substantial progress in inter- and transdisciplinary collaboration, primarily due to their non-technological nature. In addition, placing emphasis on modeling the reliability and resilience of transformation pathways represents a distinct and emerging frontier that highlights the significance of an integrated network of networks. Conclusions: Existing and emerging circular bioeconomy practices can serve as prime examples of system integration. These practices facilitate the interconnection of complex biomass supply chain networks with other networks encompassing feedstock-independent renewable power, hydrogen, CO 2 , water, and other biotic, abiotic, and intangible resources. Elevating the prominence of these connectors will empower policymakers to steer the amplification of synergies and mitigation of tradeoffs among systems, sectors, and goals.

09 BIOMASS FUELS↗

ARIES: NREL Off-Road Decarbonization and Energy Systems Integration Workshop - Challenges and Opportunities

This presentation about ARIES was given at the NREL Off-Road Decarbonization and Energy Systems Integration Workshop - Challenges and Opportunities. ARIES was designed to fill a significant gap: there is no research platform that can support the nation's transition to a decarbonized energy system. ARIES will demonstrate and de-risk a future energy system with more than 50% renewable generation by 2030, that is just, affordable, flexible, clean, secure, resilient, and reliable, even in the off-road transportation sector.

ARIES↗

Energy Systems Integration Facility Stewardship Summary: Fiscal Year 2023

A summary of NREL's good stewardship of the nationally unique Energy Systems Integration Facility (ESIF) highlighting performance metrics, infrastructure and capability upgrades, and examples of R&D impact. In fiscal year 2023, ESIF installed its third-generation high-performance computer, expanded capabailities for validating building energy controls, and demonstrated a leap in scale through virtual networking with another national laboratory. ESIF researchers made breakthroughs in cybersecurity for energy systems, efficient high-powered electric vehicle charging, leveraging reinforcement learning for grid resilience, and more.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Optimization of Integrated Energy Systems

Integrated energy systems that couple nuclear power plants with additional products including hydrogen, storage, or synthetic fuels provide a more flexible energy source that can be more economical than generating electricity alone. Determining the size and shape of these systems and optimizing their operation is challenging. INL, through the IES program, has developed optimization software to help solve these challenges. Holistic Energy Resource Optimization Network (HERON) is a software tool to optimize the size and capacity of integrated energy systems using stochastic optimization. Optimization of Real-time Capacity Allocation (ORCA) is a software tool under development to perform real-time economic optimization of these systems using economic model predictive control. An overview of these tools and a discussion of their optimization methods will be presented in this talk.

97 MATHEMATICS AND COMPUTING↗

Energy Systems Integration Facility Stewardship Summary: Fiscal Year 2022

A summary of NREL's good stewardship of the nationally unique Energy Systems Integration Facility (ESIF) highlighting performance metrics, infrastructure and capability upgrades, and examples of R&D impact. In fiscal year 2022, ESIF researchers made breakthroughs in everything from long-duration energy storage and cybersecurity visualizations to a world record in heavy-duty hydrogen vehicle fueling, and built out research assets to advance microgrid operation and controls, renewable hydrogen production, electric vehicles, energy-efficient buildings, and more.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

WISDEM® v3.4.1(Wind Plant Integrated System Design and Engineering Model) [SWR-14-05]

The Wind Plant Integrated System Design and Engineering Model (WISDEM®) is a set of models for assessing overall wind plant cost of energy (COE). The models use wind turbine and plant cost and energy production as well as financial models to estimate COE and other wind plant system attributes. WISDEM® is accessed through Python, is built using OpenMDAO, and uses several sub-models that are also implemented within OpenMDAO. These sub-models can be used independently but they are required to use the overall WISDEM® turbine design capability. Please install all of the pre-requisites prior to installing WISDEM® by following the directions below. For additional information about the NWTC effort in systems engineering that supports WISDEM® development, please visit the official NREL systems engineering for wind energy website. https://www.nlr.gov/wind/systems-engineering

Dykes, Katherine↗