LANSCE DIGITAL LOW LEVEL RF UPGRADE
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This note provides a review of collimator systems being used or considered in high-intensity proton accelerators like SNS, J-PARC, LHC, and PIP-II. These facilities use collimators to remove beam halo, restrict transverse size and momentum in the beam to constrain beam losses around collimators and minimize beam losses downstream, particularly losses arising from particles missing the design location at the stripping foil when injected into the proton storage ring. Collimators are placed either in the transport injection lines (single-pass collimators) or in the rings (multi-pass collimators). Collimators in the transport line are placed around stripping foils in H- accelerators, allowing the beamline optics to get rid of the unstripped protons into well localized absorbers. Rings and proton accelerators mostly rely on tungsten scrapers and collimators in a multi-stage configuration to clean the scattered beam particles mainly responsible for heavy losses at high energies. Placement of the collimators is carefully chosen in terms of the right phase advance to maximize the collimating efficiency, whether the collimation is intended to match an injection stripping foil or a downstream acceptance. Collimation systems are designed with the specific concerns of each facility in mind, although all of them prioritize the minimization of activation due to beam losses to enable hands-on access during maintenance periods. At LANSCE, there are no high-energy collimators, although pairs of horizontal and vertical jaws are routinely used in the LEBT to clean and control the transverse beam profile delivered downstream. This report will help in understanding, together with the beam dynamics simulations, which collimation schemes would be most effective for the PSR upgrade. For example, SNS designed off-momentum collimators to be placed in a 90° arc bend, a high-dispersion region in the beam injection line, very similar to the bend at Line D in LANSCE. This system was very effective at minimizing losses during injection into the SNS accumulator ring and is being re-designed for future operation.
Explore the source record for details and available documents.
The idea of a neutron target enables the measurement of neutron-induced reactions in inverse kinematics. This idea is part of the LANSCE strategy to stay a worldwide leader for neutron-induced research. The proof-of-principle experiment outlined in is the core of the LDRD project 20240004DR. The current approach is to use an ion source capable of accelerating single-charged ions up to about 60 keV. A beam of 78 Kr + ions will be created to interact with a neutron target and implanted. During the passage of the target, neutrons can be captured and the freshly produced 79 Kr + ions will be implanted along with the main beam.
End goal - The CMMS automatically creates a Maintenance Request when a component was in a degraded condition.
To organize the safe handling of activated material, knowing the residual dose rates is crucial. Here, in this work, we present the pre-experiment activation analysis for an experiment in which tungsten blocks are irradiated by 800-MeV protons. In this analysis, we use the Monte Carlo N-Particle (MCNP) code for radiation transport, Attila4MC for unstructured mesh generation, and Activation in Accelerator Radiation Environments (AARE), including CINDER2008, for activation analysis. If the tungsten blocks must be removed within a day after the experiment, then exposure to personnel entering the room must be reduced. One exposure-reduction strategy is to add carbon steel shielding around the tungsten blocks, efficiently reducing the dose from the activated tungsten. However, the shielding becomes activated itself during irradiation: 56Mn is the dominant contributor for short decay times. The actual schedule at the time of the experiment allowed sufficient cool-off time for the tungsten in the room so that additional shielding was not necessary. A less rigorous comparison of the calculated values with the post-experiment measurements showed reasonable agreement.
Explore the source record for details and available documents.
The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.
This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.
Explore the source record for details and available documents.
Sources of negative ions such as H - are essential elements of proton accelerators and tokamaks. They have limited lifetime. The replacement of an ion source is a costly process causing delays in the operation of the entire machine. The hot tungsten filament is the key element that limits the lifetime of the H - ion source at the Los Alamos Neutron Science Center (LANSCE) facility. An accurate model, which describes the filament physics and provides a reliable estimate on its lifetime, may significantly improve the operation of the facility. In this report we describe such a model, including a comprehensive list of relevant physical processes from first principles. The model can be used to describe different regimes of operation using diagnostics data as input parameters. It has been benchmarked against the data collected during the production cycle at LANSCE and shows good agreement with experimental data.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
LAMP is to replace the front-end of LANSCE. Therefore, the device designators for LAMP needs approval from LANSCE. This document defines the agreed upon device designator names to be used in LAMP and in the prototype beamline LAMP in ADEF Tunnel (LAT).
For more than 40 years the Los Alamos Neutron Science Center (LANSCE) has provided the scientific underpinnings in nuclear physics and material science needed to ensure the safety and surety of the nuclear stockpile into the future. In addition to national security research, the LANSCE User Facility has a vibrant research program in fundamental science, providing the scientific community with intense sources of neutrons and protons to perform experiments supporting civilian research and the production of medical and research isotopes.
The LANSCE Modernization Project (LAMP) concept includes a drift-tube proton linac (DTL) from 3 MeV to 100 MeV consisting of 6 tanks. This technical note provides estimates of RF power required for the LAMP DTL tanks using DTLfish modeling.
LANSCE’s combination of beam power, flexibility, and authorization basis uniquely positions it to address a broad set of NNSA (and beyond) science. We have a programmatically motivated science vision for the facility that extends through the next several decades.
With the installation of the Mark-IV target at LANSCE in 2022 significant changes of the beam-related backgrounds at DANCE are observed. DANCE is located at flight path 14 (FP-14) in the experimental area 2 (ER-2) at LANSCE. This new background is so severe that the array is not operational for several microseconds after the protons hit the spallation target (Figures 1 - 3).