Search NASA⌕ Search

SEARCH · Search NASA

Results for “LLRF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Commissioning of the LHC Low Level RF System Remote Configuration Tools

The LHC Low Level RF system (LLRF) is a complex multi-loop system used to regulate the superconductive cavity gap voltage as well as to reduce the impedance presented by RF stations to the beam. The RF system can have a profound impact on the stability of the beam; a mis-configured RF system has the potential of causing longitudinal instabilities, beam diffusion and beam loss. To configure the RF station for operation, a set of parameters in the LLRF multi-loop system have to be defined. Initial system commissioning as well as ongoing operation requires a consistent method of computer based remote measurement and model-based design of each RF station feedback system. This paper describes the suite of Matlab tools used for configuring the LHC RF system during the start up in Nov2009-Feb2010. We present a brief overview of the tool, examples of commissioning results, and basics of the model-based design algorithms. This work complements our previous presentation, where the algorithms and methodology followed in the tools were described.

43 PARTICLE ACCELERATORS↗

Low-Level Radio Frequency System Development for the National Synchrotron Light Source II

The National Synchrotron Light Source-II (NSLS-II) is a new ultra-bright 3GeV 3rd generation synchrotron radiation light source. The performance goals require operation with a beam current of 500mA and a bunch current of at least 0.5mA. The position and timing specifications of the ultra-bright photon beam imposes a set of stringent requirements on the performance of radio frequency (RF) control. In addition, commissioning and staged installation of damping wigglers and insertion devices requires the flexibility of handling varying beam conditions. To meet these requirements, a digital implementation of the LLRF is chosen, and digital serial links are planned for the system integration. The first prototype of the controller front-end hardware has been built, and is currently being tested.

43 PARTICLE ACCELERATORS↗

Design and evaluation of a low-level RF control system analog/digital receiver for the ILC main Linacs

The proposed RF distribution scheme for the two 15 km long ILC LINACs, uses one klystron to feed 26 superconducting RF cavities operating at 1.3 GHz. For a precise control of the vector sum of the signals coming from the SC cavities, the control system needs a high performance, low cost, reliable and modular multichannel receiver. At Fermilab we developed a 96 channel, 1.3 GHz analog/digital receiver for the ILC LINAC LLRF control system. In the paper we present a balanced design approach to the specifications of each receiver section, the design choices made to fulfill the goals and a description of the prototyped system. The design is tested by measuring standard performance parameters, such as noise figure, linearity and temperature sensitivity. Measurements show that the design meets the specifications and it is comparable to other similar systems developed at other laboratories, in terms of performance.

43 PARTICLE ACCELERATORS↗

Transverse emittance growth due to rf noise in crab cavities: Theory, measurements, cure, and high luminosity LHC estimates

The High-Luminosity LHC (HL-LHC) upgrade with planned operation from 2029 onward has a goal of achieving a tenfold increase in the integrated number of recorded collisions thanks to a doubling of the intensity per bunch ( 2.2 × 10 11 protons) and a reduction of β * (the β value in the two high luminosity detectors, namely ATLAS and CMS) to 15 cm. Such an increase in recorded collisions would significantly expedite new discoveries and exploration. Crab cavities are an important component of the HL-LHC upgrade and will contribute strongly to achieving an increase in the number of recorded collisions. However, noise injected through the crab cavity radio frequency (rf) system could cause significant transverse emittance growth and limit luminosity lifetime. We presented a theoretical formalism relating transverse emittance growth to rf noise in an earlier work. In this follow-up paper, we summarize measurements in the super-proton synchrotron (SPS) at CERN that validate the theory, we present estimates of the emittance growth rates using state-of-the-art rf and low-level rf (LLRF) technologies, and we set the rf noise specifications to achieve acceptable performance. A novel dedicated feedback system acting through the crab cavities to mitigate emittance growth will be required. In this work, we develop a theoretical formalism to evaluate the performance of such a feedback system in any collider, identify limiting components, present simulation results to validate these studies, and derive key design parameters for an HL-LHC implementation of such a feedback system. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

RF transient analysis and stabilization of the phase and energy of the proposed PIP-II LINAC

Here, this paper describes a recent effort to develop and benchmark a simulation tool for the analysis of RF transients and their compensation in an H- linear accelerator. Existing tools in this area either focus on electron LINACs or lack fundamental details about the LLRF system that are necessary to provide realistic performance estimates. In our paper we begin with a discussion of our computational models followed by benchmarking with existing beam-dynamics codes and measured data. We then analyze the effect of RF transients and their compensation in the PIP-II LINAC, followed by an analysis of calibration errors and how a Newton’s Method based feedback scheme can be used to regulate the beam energy to within the specified limits.

43 PARTICLE ACCELERATORS↗

slaclab/llrf-hls

This is the repository for "llrf-hls" developed by SLAC National Accelerator Laboratory.

Vasquez, Jesus↗

The RF Protection Interlock System Prototype Verification

The Radio Frequency Protection Interlock system plays vital role in the LLRF related/dependent accelerator sections Protection. It’s main role is to collect information from number different sensors and indicators around nearest cavities and cryomodule and provide instant RF signal termination in case of safety thresholds violation. This submission describes newly designed RFPI system tailored to the Proton Improvement Plan II (PIP-II) requirements. The proof of concept prototype of this system has been build. The paper includes also the CMTF environment evaluation tests results and findings as an input to the next full-scope prototype design.

43 PARTICLE ACCELERATORS↗

Magnetron R&D toward the Amplitude Modulation Control for SRF Accelerator

The scheme of using a high efficiency magnetron to drive a superconducting radio frequency (SRF) accelerator cavity needs not only the injection phase locking but also the amplitude modulation to compensate the cavity's microphomics caused cavity voltage change and the beam loading variation. To be able to do a fast and efficient modulation, the magnetron's magnetic field has to be trimmed by an external coil to compensate the frequency pushing effect due to the anode current change [1]. A low eddy current magnetron body has been designed and built [2]. This paper will present the analytical prediction, simulation and experimental results on the 2.45 GHz magnetron test stand with the modulation frequency up to 1 kHz. In addition, the progresses on the injection lock to a copper cavity, new 1497 MHz magnetron prototype, 13 kW high power magnetron test stand development and newly built low level RF (LLRF) controller for the amplitude modulation will be reported.

Rimmer, Robert A.↗

Status Update of a Harmonic Kicker Development for JLEIC

The Jefferson Lab Electron-Ion Collider (JLEIC) is an asymmetric high luminosity ring-ring collider proposed as the next major R&D facility for the nuclear physics community. Both of JLEIC?s electron and ion collider rings have high beam current with gaps serving the pur-poses of beam abort, ion clearing, etc. Those gaps will cause time-varying beam loading in the storage RF cavi-ties, and may result in modulation of cavity RF phase/voltage and cyclic shift of collision point, which could lead to significant luminosity loss. We studied a few approaches to mitigate the RF phase modulation and IP shift, such as correcting the RF phase/voltage modula-tion with traditional LLRF feedback, one-turn feedback (OTFB), or RF feedforward (FF); optimizing the bunch fill pattern to limit the RF phase/voltage modulation to a small fraction of the bunch trains in the collider ring; or matching the RF phase modulation in the two rings. The preliminary results are discussed in this paper.

Guo, Jiquan↗

Resonance Control System for the PIP-II IT HWR Cryomodule

The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.

43 PARTICLE ACCELERATORS↗

Identifying Downtime Sources in CEBAF SRF Linac Systems for Improving Its Reliability

In this work, we will present some recent analysis of the reliability statistics of the CEBAF SRF linac systems. Based on the data collected by the existing Down Time Manager (DTM), the year-to-year downtime evolution trend of linac zones over the six-year period from FY18 to FY23 is established. An in-depth downtime analysis at a resolution beyond the linac zone level was carried out by introducing a new system hierarchy, consisting of the SRF linac sub-systems and components. This new paradigm was implemented in a pilot downtime study over the two-month period of CEBAF operation from 9/13/23 to 11/13/23, enabling localization of the responsible sub-systems (SRF, HPRF, LLRF, Beamline vacuum, Cryogenics, etc.) and hardware components (cavity, tuner, RF coupler, etc.) in the CEBAF SRF linac systems. Pinpointing downtime sources over long operation periods at the sub-systems and component levels holds the key to improving the CEBAF SRF systems reliability. It also helps identify areas of SRF technology development needed by future high-power high-reliability CW SRF linacs.

Hryhorenko, Oleksandr↗

First conduction cooled photoinjector status

SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb3Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only 2W of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. We aim for generation of the first beam in 2024. In this paper, we present the most up-to-date progress including results of the first cool down of the gun-cavity in the newly developed conduction cooled cryomodule and LLRF system development.

43 PARTICLE ACCELERATORS↗

The PIP-II dedicated RFPI system final design

The Radio Frequency Protection Interlock (RFPI) system main responsibility is to collect predefined set of signals and to protect each RF station. In case of safety limits violations from any of this input signals the RFPI has to instantenously drop permits for the LLRF or RF amplifier (eq. Solid State Amplifier - SSA or klystron) operation.This paper presents an overview of the final design of the RFPI system dedicated for Proton Improvement Plan II (PIP-II) at Fermilab.

Cichalewski, Wojciech [Lodz, Tech. U.; Lodz U.]↗

OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

Resonance Control System for the CEBAF Separator Upgrade

Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. The RF system employs two digital LLRF systems controlling four normal conducting cavities in a vector sum setting. Cavity tune information of the individual cavities is obtained using a multiplexing scheme of the forward and reflected RF signals. Water skids equipped with heaters and valves are used to control resonance. A new FPGA-based hardware and EPICS-based predictive control algorithm has been developed to support reliable operation of the beam extraction process. This paper presents the architecture design of the existing hardware and software as well as a plan to develop a model predictive control system.

Plawski, Tomasz↗